Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Permit: TC-MDP-0523-01014
Permit Details
Apply Date:
08/10/2023
Applicant:
Daria Hopkins
Description:
SFR MERI156021 T21-M0063
Permit Reviews
Permit Number - TC-MDP-0523-01014
Permit Status: Complete
Permit Description: SFR MERI156021 T21-M0063
Start Date | Submittal | Complete Date | Status |
---|---|---|---|
08/11/2023 | ZZZMODEL PERMIT REVIEW RESIDENTIAL v.1 | 08/15/2023 | APPROVED |
08/29/2024 | BUILDING DEFERRED SUBMITTAL REVIEW v.1 | 08/30/2024 | APPROVED |
10/02/2023 | BUILDING DEFERRED SUBMITTAL REVIEW v.1 | 10/02/2023 | APPROVED |
Conditions
Permit Number - TC-MDP-0523-01014
Permit Status: Complete
Permit Description: SFR MERI156021 T21-M0063
Date | Description | Comments |
---|---|---|
10/02/2023 | SPECIAL INSPECTION FOR CONCRETE INSTALLATION IS REQUIRED. | |
08/11/2023 | SPECIAL INSPECTION FOR EPOXY ANCHORS IS REQUIRED. | |
08/11/2023 | SPECIAL INSPECTION FOR POST TENSION SLAB IS REQUIRED. | |
08/14/2023 | Post-Tension Inspection Report is required. | |
05/11/2023 | Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. Contact sewer@pima.gov for review and assessment. | |
08/30/2024 | Sewer condition must be accepted and released by Pima County prior to issuance of a Temporary Certificate of Occupancy. For More Information visit https://www.pima.gov/1076/Sewer-Connection-Permits, To check your permit status https://permits.pima.gov/ | |
08/11/2023 | SPECIAL INSPECTION FOR SPECIAL GRADING, EXCAVATION AND FILLING IS REQUIRED. | |
08/14/2023 | Truss/Joist Design plans must be submitted and approved prior to intermediate inspections if residential building or finaling the permit if commercial building. |
Outstanding Inspections
Permit Status: Complete
Permit Number: TC-MDP-0523-01014
Permite Description: SFR MERI156021 T21-M0063
Total Outstanding Inspections - 4
Last Inspection Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
12/29/2023 | COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. | N/A | Re-inspection required (with fee) | Garage shear wall hold down not nailed or bolted to stud and sole plate. Dwv tub amd shower not under test, no plans on site. Stopped inspection. More items may be added. Walk house to ensure code compliance before calling in for inspection. Re-inspection required with fee. |
12/29/2023 | COT - BULD - SWG Clearance | N/A | Not Ready | |
03/22/2024 | RSBU - Building Final | N/A | Re-inspection required | 3/22/24: leak at hose bib and insulation missing. |
03/22/2024 | COT - RSPL - Plumbing Final | N/A | Re-inspection required | 3/22/24: leak at hose bib and insulation missing. |
Completed Inspections
Permit Status: Complete
Permit Number: TC-MDP-0523-01014
Permit Description: SFR MERI156021 T21-M0063
Total Completed Inspections - 22
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
10/18/2023 | COT - RSPL - Rough Soil | Passed | ||
10/18/2023 | COT - RSPL - Sewer | Passed | ||
10/18/2023 | COT - RSPL - Yard Water Line | Passed | ||
10/25/2023 | COT - RSBU - Excavation/Rebar/Zoning | Passed | ||
10/25/2023 | COT - RSBU - Preslab | Passed | ||
10/25/2023 | COT - RSEL - Electrical Underground | Passed | ||
10/25/2023 | COT - RSEL - Grounding/Bonding | Passed | ||
11/08/2023 | COT - RSBU - Exterior Clips/Sheathing | Passed | H2.5 clips are installed on all rafters, hold downs with 3x3 plate washers are installed on interior bearing walls, OSB plywood is properly nailed on all exterior shear walls. Roof sheathing is properly nailed to roof rafters. Okay to proceed with dry-in of roof and exterior walls. | |
12/18/2023 | COT - RSPL - Gas Pressure Test | Passed | Gas line is holding 15# of compressed air. | |
12/20/2023 | BULD - Electrical Clearance | Passed | ||
01/03/2024 | COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. | Passed | ||
01/29/2024 | COT - RSBU - Interior Shear Bracing | Passed | ||
03/22/2024 | COT - BULD - SWG Clearance | Passed | 3/12/24: missing valve at kitchen 3/22/24: SWG clearance |
|
03/22/2024 | COT - RSEL - Electrical Final | Passed | ||
03/22/2024 | COT - RSEL - Outdoor Lighting | Passed | ||
03/22/2024 | COT - RSME - Mechanical Final | Passed | ||
03/22/2024 | COT - RSPL - Backwater Valve | Passed | ||
03/22/2024 | ENGR Engineering Final | Passed | Spoke with Superintendent regarding the (2) broken sidewalk panels which need to be replaced due to unrepairable damage, he will address with concrete sub contractor and have completed before site final is completed. | |
03/22/2024 | RSBU - Building Progress | Passed | ||
03/22/2024 | COT - RSBU - Roof Nailing | Passed | ||
03/25/2024 | RSBU - Building Final | Passed | ||
03/25/2024 | COT - RSPL - Plumbing Final | Passed |