Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO.
If you cannot find what you are looking for please
submit a records request.
Inspection Status: Passed
Inspection History: COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in.
| Date |
Description |
Inspector |
Results |
Comments |
| 01/03/2024 |
COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. |
|
Passed |
|
| 12/18/2023 |
COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. |
|
Re-inspection required |
Penetration through top plate for mechanical, electrical, and plumbing are not properly sealed off. Tub is not filled with water and shower pan is not installed. Re-inspection is required. Grounding for gas piping is not connected. Temporary GFCI receptacle is not installed at electrical panel and panel front has 2 open breaker slots. Re-inspection is required. |
| 12/19/2023 |
COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. |
|
Canceled |
|
| 12/20/2023 |
COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. |
|
Re-inspection required |
Garage shear wall hold down not nailed or bolted to stud and sole plate. Dwv tub amd shower not under test, no plans on site. Stopped inspection. More items may be added. Walk house to ensure code compliance before calling in for inspection. |
| 12/29/2023 |
COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. |
|
Re-inspection required (with fee) |
Garage shear wall hold down not nailed or bolted to stud and sole plate. Dwv tub amd shower not under test, no plans on site. Stopped inspection. More items may be added. Walk house to ensure code compliance before calling in for inspection. Re-inspection required with fee. |