Permit: TC-MDP-0426-00223
Permit Details
Status:
Inspections
Type:
Model Building Permit
Address:
10034 E LEBARON
Address NEW:
10034 E LEBARON
Apply Date:
04/14/2026
Applicant:
Celina Rodriguez
Description:
Mirador Ridge Blossom 1465 Plan (Model master plan TC-MDP-0725-00408)
Permit Reviews
Permit Number - TC-MDP-0426-00223
Permit Status: Inspections
Permit Description: Mirador Ridge Blossom 1465 Plan (Model master plan TC-MDP-0725-00408)
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 04/16/2026 | SITE FROM MODEL PERMIT - SUBDIVISION v.1 | 04/27/2026 | APPROVED |
Outstanding Activity Conditions
Permit Number - TC-MDP-0426-00223
Permit Status: Inspections
Permit Description: Mirador Ridge Blossom 1465 Plan (Model master plan TC-MDP-0725-00408)
Total Outstanding Activity Conditions - 4
| Date | Name |
|---|---|
| 04/09/2026 | Submit the Air Leakage & Duct Tightness Test Report completed by an Approved Special Inspector prior to Final Inspections. |
| 04/09/2026 | SPECIAL INSPECTION FOR POST TENSION SLAB IS REQUIRED. |
| 04/23/2026 | Post-Installed Anchor Inspection Report is required. |
| 04/23/2026 | SPECIAL INSPECTION FOR SITE PREPARATION IS REQUIRED. |
Conditions
Permit Number - TC-MDP-0426-00223
Permit Status: Inspections
Permit Description: Mirador Ridge Blossom 1465 Plan (Model master plan TC-MDP-0725-00408)
| Date | Description | Comments |
|---|---|---|
| 04/30/2026 | Contractor with active Arizona Contractor's License for specified scope of work, or a signed Owner Builder Affidavit is required prior to issuance of permit. The Affidavit form is available at https://www.tucsonaz.gov/Departments/Planning-Development-Services/Permits/Residential-Permits. Contractor or Owner must have a TDC Online account and be added to the permit as the correct contact type https://www.tucsonaz.gov/files/sharedassets/public/v/2/pdsd/documents/tdc-faq/new-pdfs/adding-additional-contacts.pdf. If you are providing an Owner Builder Affidavit, the owner MUST be attached as a contact on the permit. | |
| 04/09/2026 | Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. For review and assessment: apply online at https://permits.pima.gov/ or contact us at sewer@pima.gov, (520) 724-9900. | |
| 04/09/2026 | Truss/Joist Design plans must be submitted and approved prior to intermediate inspections if residential building or finaling the permit if commercial building. |
Outstanding Inspections
Permit Status: Inspections
Permit Number: TC-MDP-0426-00223
Permite Description: Mirador Ridge Blossom 1465 Plan (Model master plan TC-MDP-0725-00408)
Total Outstanding Inspections - 2
| Last Inspection Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 06/01/2026 | COT - RSBU - Roof Nailing | N/A | Re-inspection required | |
| 06/01/2026 | COT - RSBU - Exterior/Interior Clips/Sheathing/Framing | N/A | Re-inspection required | 1. Garage entry door into living space is missing 1 king stud. 2. Nail in diagonal bracings properly per detail 301. 3. SW11 Shear walls are missing some washers 4. Provide truss calcs. |
Completed Inspections
Permit Status: Inspections
Permit Number: TC-MDP-0426-00223
Permit Description: Mirador Ridge Blossom 1465 Plan (Model master plan TC-MDP-0725-00408)
Total Completed Inspections - 11
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 05/12/2026 | COT - RSPL - Yard Water Line | Passed | 5.12.26 Approved |
|
| 05/12/2026 | COT - RSPL - Rough Soil | Passed | 5.12.26 Approved |
|
| 05/12/2026 | COT - RSPL - Sewer | Passed | 5.12.26 Approved |
|
| 05/18/2026 | COT - RSBU - Excavation/Rebar/Zoning | Passed | 5.18.26 Approved |
|
| 05/18/2026 | COT - RSBU - Preslab | Passed | ||
| 05/18/2026 | COT - RSEL - Electrical Underground | Passed | ||
| 06/04/2026 | COT - RSBU - Roof Nailing | Passed | ||
| 06/08/2026 | COT - RSBU - Exterior/Interior Clips/Sheathing/Framing | Passed | ||
| 06/12/2026 | BULD - Electrical Clearance | Passed | ||
| 06/12/2026 | COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. | Passed | ||
| 07/02/2026 | COT - RSBU - Interior Shear Bracing | Passed | 07/02/2026 Corrections made to drywall screw spacing. |