Permit Details

Status:
Inspections
Type:
Model Building Permit
Address:
10034 E LEBARON
Address NEW:
10034 E LEBARON
Apply Date:
04/14/2026
Applicant:
Celina Rodriguez
Description:
Mirador Ridge Blossom 1465 Plan (Model master plan TC-MDP-0725-00408)

Permit Reviews

Permit Number - TC-MDP-0426-00223
Permit Status: Inspections
Permit Description: Mirador Ridge Blossom 1465 Plan (Model master plan TC-MDP-0725-00408)
Start Date Submittal Complete Date Status  
04/16/2026 SITE FROM MODEL PERMIT - SUBDIVISION v.1 04/27/2026 APPROVED Review Details
08/28/2026 SPECIAL INSPECTION REVIEW v.1 09/02/2026 APPROVED Review Details

Conditions

Permit Number - TC-MDP-0426-00223
Permit Status: Inspections
Permit Description: Mirador Ridge Blossom 1465 Plan (Model master plan TC-MDP-0725-00408)
Date Description Comments
04/09/2026 Submit the Air Leakage & Duct Tightness Test Report completed by an Approved Special Inspector prior to Final Inspections.
04/30/2026 Contractor with active Arizona Contractor's License for specified scope of work, or a signed Owner Builder Affidavit is required prior to issuance of permit. The Affidavit form is available at https://www.tucsonaz.gov/Departments/Planning-Development-Services/Permits/Residential-Permits. Contractor or Owner must have a TDC Online account and be added to the permit as the correct contact type https://www.tucsonaz.gov/files/sharedassets/public/v/2/pdsd/documents/tdc-faq/new-pdfs/adding-additional-contacts.pdf. If you are providing an Owner Builder Affidavit, the owner MUST be attached as a contact on the permit.
04/09/2026 SPECIAL INSPECTION FOR POST TENSION SLAB IS REQUIRED.
04/23/2026 Post-Installed Anchor Inspection Report is required.
04/09/2026 Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. For review and assessment: apply online at https://permits.pima.gov/ or contact us at sewer@pima.gov, (520) 724-9900.
04/23/2026 SPECIAL INSPECTION FOR SITE PREPARATION IS REQUIRED.
04/09/2026 Truss/Joist Design plans must be submitted and approved prior to intermediate inspections if residential building or finaling the permit if commercial building.

Outstanding Inspections

Permit Status: Inspections
Permit Number: TC-MDP-0426-00223
Permite Description: Mirador Ridge Blossom 1465 Plan (Model master plan TC-MDP-0725-00408)
Total Outstanding Inspections - 7
Last Inspection Date Description Inspector Results Comments
06/01/2026 COT - RSBU - Roof Nailing N/A Re-inspection required
06/01/2026 COT - RSBU - Exterior/Interior Clips/Sheathing/Framing N/A Re-inspection required 1. Garage entry door into living space is missing 1 king stud.
2. Nail in diagonal bracings properly per detail 301.
3. SW11 Shear walls are missing some washers
4. Provide truss calcs.
08/24/2026 ENGR Engineering Final N/A Partial Pass Site is complete in accordance with approved plans.
Outstanding conditions prevent full pass of Final.
08/24/2026 COT - RSEL - Electrical Final N/A Re-inspection required 8-24-26 clean out caps are required to be glued to prevent them from coming off completely* condensing unit requires to be leveled properly* 3 inches of clearance around condensing pad is required* post tension tag required at hose bib* 20 minute rated tag at fire door at garage needs to be visible* threshold at garage entry to home requires ADA accessibility* electrical at great room for fans and lights are all tied in together as well as once you turn that three-way switch off for the lights the fan turns off as well and the half hot receptacle located under window in great room at Northwest corner turns on simultaneously, not wired to specs.* two receptacles located at great room on North wall closest to front door are without power* flex duct in attic crawlspace area coming off of FAU has tear in it needs repair.
08/24/2026 COT - RSME - Mechanical Final N/A Re-inspection required 8-24-26 clean out caps are required to be glued to prevent them from coming off completely* condensing unit requires to be leveled properly* 3 inches of clearance around condensing pad is required* post tension tag required at hose bib* 20 minute rated tag at fire door at garage needs to be visible* threshold at garage entry to home requires ADA accessibility* electrical at great room for fans and lights are all tied in together as well as once you turn that three-way switch off for the lights the fan turns off as well and the half hot receptacle located under window in great room at Northwest corner turns on simultaneously, not wired to specs.* two receptacles located at great room on North wall closest to front door are without power* flex duct in attic crawlspace area coming off of FAU has tear in it needs repair.
08/24/2026 COT - RSPL - Plumbing Final N/A Re-inspection required 8-24-26 clean out caps are required to be glued to prevent them from coming off completely* condensing unit requires to be leveled properly* 3 inches of clearance around condensing pad is required* post tension tag required at hose bib* 20 minute rated tag at fire door at garage needs to be visible* threshold at garage entry to home requires ADA accessibility* electrical at great room for fans and lights are all tied in together as well as once you turn that three-way switch off for the lights the fan turns off as well and the half hot receptacle located under window in great room at Northwest corner turns on simultaneously, not wired to specs.* two receptacles located at great room on North wall closest to front door are without power* flex duct in attic crawlspace area coming off of FAU has tear in it needs repair.
08/24/2026 RSBU - Building Final N/A Re-inspection required 8-24-26 clean out caps are required to be glued to prevent them from coming off completely* condensing unit requires to be leveled properly* 3 inches of clearance around condensing pad is required* post tension tag required at hose bib* 20 minute rated tag at fire door at garage needs to be visible* threshold at garage entry to home requires ADA accessibility* electrical at great room for fans and lights are all tied in together as well as once you turn that three-way switch off for the lights the fan turns off as well and the half hot receptacle located under window in great room at Northwest corner turns on simultaneously, not wired to specs.* two receptacles located at great room on North wall closest to front door are without power* flex duct in attic crawlspace area coming off of FAU has tear in it needs repair.

Completed Inspections

Permit Status: Inspections
Permit Number: TC-MDP-0426-00223
Permit Description: Mirador Ridge Blossom 1465 Plan (Model master plan TC-MDP-0725-00408)
Total Completed Inspections - 18
Date Description Inspector Results Comments
05/12/2026 COT - RSPL - Yard Water Line Passed 5.12.26
Approved
05/12/2026 COT - RSPL - Rough Soil Passed 5.12.26
Approved
05/12/2026 COT - RSPL - Sewer Passed 5.12.26
Approved
05/18/2026 COT - RSBU - Excavation/Rebar/Zoning Passed 5.18.26
Approved
05/18/2026 COT - RSBU - Preslab Passed
05/18/2026 COT - RSEL - Electrical Underground Passed
06/04/2026 COT - RSBU - Roof Nailing Passed
06/08/2026 COT - RSBU - Exterior/Interior Clips/Sheathing/Framing Passed
06/12/2026 BULD - Electrical Clearance Passed
06/12/2026 COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. Passed
07/02/2026 COT - RSBU - Interior Shear Bracing Passed 07/02/2026
Corrections made to drywall screw spacing.
08/14/2026 COT - BULD - SWG Clearance Passed 8-14-26 SWG Clearance approved
08/19/2026 COT - RSPL - Gas Pressure Test Passed 8-19-26 gas pressure test approved pass
08/24/2026 COT - RSEL - Outdoor Lighting Passed
08/24/2026 RSBU - Building Progress Passed
08/27/2026 COT - RSEL - Electrical Final Passed 8-27-26 All items are corrected electrical final approved
08/27/2026 COT - RSME - Mechanical Final Passed 8-27-26 All items are corrected mechanical final approved.
08/27/2026 COT - RSPL - Plumbing Final Passed 8-27-26 all items were corrected plumbing final approved

Documents

File Name Document Type  
PT PACKET- MRB 64-2026-08-26_V1.PDF DOCUMENTS VIEW
COFT - PDSD - PERMIT CARD (SSRS).PDF DOCUMENTS VIEW
MIRADOR RIDGE - LOT 64 START_V1.PDF DOCUMENTS VIEW
MRB 64 SIC-2026-04-14_V1.PDF DOCUMENTS VIEW