Permit: TC-MDP-0426-00205
Permit Details
Status:
Inspections Complete
Type:
Model Building Permit
Address:
398 N COVILLE DR
Address NEW:
398 N COVILLE DR
Apply Date:
04/01/2026
Applicant:
Celina Rodriguez
Description:
REV1: Office changed back to garage Enclaves at Tumamoc 1442 Plan (Model Master Plan TC-MDP-1225-00792)
Permit Reviews
Permit Number - TC-MDP-0426-00205
Permit Status: Inspections complete
Permit Description: REV1: Office changed back to garage
Enclaves at Tumamoc 1442 Plan (Model Master Plan TC-MDP-1225-00792)
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 04/30/2026 | ADMINISTRATIVE v.2 | N/A | APPROVED |
| 04/15/2026 | SITE FROM MODEL PERMIT - SUBDIVISION v.1 | 04/27/2026 | APPROVED |
| 09/25/2026 | SPECIAL INSPECTION REVIEW v.1 | 09/25/2026 | APPROVED |
| 04/27/2026 | ADMINISTRATIVE v.1 | 04/27/2026 | REQUIRES RESUBMIT |
| 10/06/2026 | SITE FROM MODEL PERMIT - SUBDIVISION REVISION v.1 | 10/06/2026 | APPROVED |
Conditions
Permit Number - TC-MDP-0426-00205
Permit Status: Inspections complete
Permit Description: REV1: Office changed back to garage
Enclaves at Tumamoc 1442 Plan (Model Master Plan TC-MDP-1225-00792)
| Date | Description | Comments |
|---|---|---|
| 04/01/2026 | Submit the Air Leakage & Duct Tightness Test Report completed by an Approved Special Inspector prior to Final Inspections. | |
| 04/23/2026 | Building permits associated with TD-DEV-1024-00280, Enclaves at Tumamoc, shall not be issued until resolution of Board of Adjustment case C10-26-02. Contact Nicholas Ross or Christopher Poirier for additional information and/or authorization to issue. | |
| 04/22/2026 | SPECIAL INSPECTION FOR CONCRETE INSTALLATION IS REQUIRED. | |
| 04/21/2026 | Enclaves at Tumamoc Appeal | |
| 04/01/2026 | MANUAL J must be submitted prior to Inspections | |
| 04/01/2026 | SPECIAL INSPECTION FOR POST TENSION SLAB IS REQUIRED. | |
| 04/22/2026 | Post-Installed Anchor Inspection Report is required. | |
| 04/01/2026 | Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. For review and assessment: apply online at https://permits.pima.gov/ or contact us at sewer@pima.gov, (520) 724-9900. | |
| 04/22/2026 | SPECIAL INSPECTION FOR SITE PREPARATION IS REQUIRED. | |
| 04/01/2026 | Truss/Joist Design plans must be submitted and approved prior to intermediate inspections if residential building or finaling the permit if commercial building. |
Outstanding Inspections
Permit Status: Inspections Complete
Permit Number: TC-MDP-0426-00205
Permite Description: REV1: Office changed back to garage
Enclaves at Tumamoc 1442 Plan (Model Master Plan TC-MDP-1225-00792)
Total Outstanding Inspections - 7
| Last Inspection Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 05/18/2026 | COT - RSEL - Electrical Underground | N/A | Not Applicable | |
| 07/06/2026 | COT - RSEL - Outdoor Lighting | N/A | Not Ready | Provide full cutoff lights that don't project out into the street or neighbors yard. 7/6/2026 |
| 07/06/2026 | COT - RSME - Mechanical Final | N/A | Not Ready | Cut PRV 6” from grade. Provide 3” around condensing unit. 2nd disconnect for construction office needs to tie into unit. stuffer vent has to be above flood level. Caulk all water closet. Cut wall cleanouts and paint all exterior plastics. No running water. 7/6/2026 |
| 07/06/2026 | COT - RSPL - Yard Water Line | N/A | Not Ready | |
| 07/06/2026 | COT - RSPL - Plumbing Final | N/A | Not Ready | Cut PRV 6” from grade. Provide 3” around condensing unit. 2nd disconnect for construction office needs to tie into unit. stuffer vent has to be above flood level. Caulk all water closet. Cut wall cleanouts and paint all exterior plastics. No running water. 7/6/2026 |
| 09/23/2026 | ENGR Engineering Final | N/A | Not Ready | -Conditions are outstanding and need to be approved prior to final. -Commercial permit final can be called in. -Accessible Route will need to have post and cable fencing at both ends of the rear sidewalk removed. |
| 10/27/2026 | RSBU - Building Final | N/A | Partial Pass | 10-27-2026 Plastic outlet behind AC needs to be painted. Ac pads needs 3" pad clearance. Electrical box is missing a knockout at bottom. Toilet needs to be fully caulked first floor. Correction needed / partial pass. |
Completed Inspections
Permit Status: Inspections Complete
Permit Number: TC-MDP-0426-00205
Permit Description: REV1: Office changed back to garage
Enclaves at Tumamoc 1442 Plan (Model Master Plan TC-MDP-1225-00792)
Total Completed Inspections - 20
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 05/15/2026 | COT - RSPL - Rough Soil | Passed | Passed 5/15/26 | |
| 05/15/2026 | COT - RSPL - Sewer | Passed | Passed 5/15/26 | |
| 05/15/2026 | COT - RSPL - Backwater Valve | Passed | Passed 5/15/26 | |
| 05/18/2026 | COT - RSBU - Excavation/Rebar/Zoning | Passed | 05/18/2026 Approved per plan and reinforcement. Okay to pour. |
|
| 05/18/2026 | COT - RSBU - Preslab | Passed | 05/18/2026 Approved per plan and reinforcement. Okay to pour. |
|
| 05/27/2026 | COT - RSBU - Exterior/Interior Clips/Sheathing/Framing | Passed | 05/27/2026 Verified added anchor bolts washer plates, SW11 on north side. |
|
| 05/27/2026 | COT - RSBU - Roof Nailing | Passed | 05/27/2026 Verified added anchor bolts washer plates, SW11 on north side. |
|
| 06/03/2026 | COT - RSPL - Gas Pressure Test | Passed | ||
| 06/04/2026 | COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. | Passed | ||
| 06/09/2026 | COT - RSBU - Interior Shear Bracing | Passed | ||
| 07/06/2026 | RSBU - Building Progress | Passed | ||
| 07/06/2026 | BULD - Electrical Clearance | Passed | Clearance for TEP ECO. 7/6/2026 | |
| 07/06/2026 | COT - BULD - SWG Clearance | Passed | Clearance for Southwest Gas. 7/6/2026 | |
| 07/07/2026 | COT - RSEL - Outdoor Lighting | Passed | 07/07/2026 Corrections made. |
|
| 07/07/2026 | COT - RSME - Mechanical Final | Passed | 07/07/2026 Corrections made to prior inspection. |
|
| 08/24/2026 | COT - RSPL - Yard Water Line | Passed | Passed | |
| 09/30/2026 | COT - RSPL - Plumbing Final | Passed | 9/30/2026 All corrections made. |
|
| 09/30/2026 | ENGR Engineering Final | Passed | ||
| 10/27/2026 | COT - RSEL - Electrical Final | Passed | 10-27-2026 Approved | |
| 10/30/2026 | RSBU - Building Final | Passed | 10/30/2026 Corrections made, all conditions satisfied. |