Inspection History Details
Inspection Status: Not Ready
Inspection History: COT - RSME - Mechanical Final
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 07/06/2026 | COT - RSME - Mechanical Final | Not Ready | Cut PRV 6” from grade. Provide 3” around condensing unit. 2nd disconnect for construction office needs to tie into unit. stuffer vent has to be above flood level. Caulk all water closet. Cut wall cleanouts and paint all exterior plastics. No running water. 7/6/2026 | |
| 07/07/2026 | COT - RSME - Mechanical Final | Passed | 07/07/2026 Corrections made to prior inspection. |