Permit Details

Status:
Inspections
Type:
Model Building Permit
Address NEW:
9629 E FRIEDEL DR
Apply Date:
07/15/2025
Applicant:
Brianna Quiroz
Description:
Eisenhower Model Plan La Escalera (Model Master Plan TC-MDP-1222-00133)

Permit Reviews

Permit Number - TC-MDP-0425-00276
Permit Status: Inspections
Permit Description: Eisenhower Model Plan La Escalera (Model Master Plan TC-MDP-1222-00133)
Start Date Submittal Complete Date Status  
07/16/2025 SITE FROM MODEL PERMIT - PRODUCTION v.1 07/24/2025 APPROVED Review Details

Outstanding Activity Conditions

Permit Number - TC-MDP-0425-00276
Permit Status: Inspections
Permit Description: Eisenhower Model Plan La Escalera (Model Master Plan TC-MDP-1222-00133)
Total Outstanding Activity Conditions - 4
Date Name
04/30/2025 Post-Tension Inspection Report is required.
04/30/2025 Sewer condition must be accepted and released by Pima County prior to issuance of a Temporary Certificate of Occupancy. For More Information visit https://www.pima.gov/1076/Sewer-Connection-Permits, To check your permit status https://permits.pima.gov/
07/18/2025 Post-Installed Anchor Inspection Report is required.
07/18/2025 SPECIAL INSPECTION FOR SITE PREPARATION IS REQUIRED.

Conditions

Permit Number - TC-MDP-0425-00276
Permit Status: Inspections
Permit Description: Eisenhower Model Plan La Escalera (Model Master Plan TC-MDP-1222-00133)
Date Description Comments
04/30/2025 Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. For review and assessment: apply online at https://permits.pima.gov/ or contact us at sewer@pima.gov, (520) 724-9900.

Outstanding Inspections

Permit Status: Inspections
Permit Number: TC-MDP-0425-00276
Permite Description: Eisenhower Model Plan La Escalera (Model Master Plan TC-MDP-1222-00133)
Total Outstanding Inspections - 2
Last Inspection Date Description Inspector Results Comments
11/07/2025 COT - RSPL - Gas Pressure Test N/A Not Applicable
11/07/2025 COT - BULD - SWG Clearance N/A Not Applicable

Completed Inspections

Permit Status: Inspections
Permit Number: TC-MDP-0425-00276
Permit Description: Eisenhower Model Plan La Escalera (Model Master Plan TC-MDP-1222-00133)
Total Completed Inspections - 12
Date Description Inspector Results Comments
09/05/2025 COT - RSPL - Rough Soil Passed 9.5.2025
Okay to backfill, shading required.
09/05/2025 COT - RSPL - Sewer Passed 9.5.2025
Okay to backfill, shading required.
09/05/2025 COT - RSPL - Yard Water Line Passed 9.5.2025
Okay to backfill, shading required.
09/11/2025 COT - RSBU - Excavation/Rebar/Zoning Passed 9.11.25
Site must be properly compacted
09/11/2025 COT - RSBU - Preslab Passed 9.11.25
Site must be properly compacted
09/11/2025 COT - RSEL - Electrical Underground Passed
09/11/2025 COT - RSEL - Grounding/Bonding Passed
11/07/2025 BULD - Electrical Clearance Passed 11.07.2025
Clearance TEP ECO.
11/07/2025 COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. Passed 11.07.2025
Approved per plan, verify before drywall the engineer letter/fix of truss in second floor near stairs and garage truss. Beam corrected.
11/07/2025 COT - RSBU - Roof Nailing Passed 11.07.2025
Approved per plan, verify before drywall the engineer letter/fix of truss in second floor near stairs and garage truss. Beam corrected.
11/14/2025 COT - RSBU - Exterior/Interior Clips/Sheathing/Framing Passed 11.14.2025
All corrections made and fixed along with engineering letter provided.
11/20/2025 COT - RSBU - Interior Shear Bracing Passed

Documents

File Name Document Type  
COFT - PDSD - PERMIT CARD.PDF DOCUMENTS VIEW
LA ESCALERA (MIRADOR) LOT 110_V1.PDF DOCUMENTS VIEW
PHASE 1A LOT 110 SIC-2025-07-15_V1.PDF DOCUMENTS VIEW