Permit Details

Status:
Complete
Type:
Model Building Permit
Address NEW:
1010 E 27TH ST UNIT 1
Apply Date:
04/21/2025
Applicant:
Ana Chavez
Description:
Greenhill grande duplex (Model master plan TC-MDP-1223-01917)

Permit Reviews

Permit Number - TC-MDP-0425-00254
Permit Status: Complete
Permit Description: Greenhill grande duplex (Model master plan TC-MDP-1223-01917)
Start Date Submittal Complete Date Status  
10/31/2025 RESTAMP - RESIDENTIAL v.1 11/04/2025 REQUIRES RESUBMIT Review Details
10/30/2025 SITE FROM MODEL TEMPLATE INFILL BUILDERS REVISION v.2 10/31/2025 APPROVED Review Details
08/01/2025 SITE FROM MODEL TEMPLATE - INFILL BUILDERS v.2 08/21/2025 REQUIRES RESUBMIT Review Details
08/25/2025 SITE FROM MODEL TEMPLATE - INFILL BUILDERS v.3 09/11/2025 APPROVED Review Details
09/23/2025 ADMINISTRATIVE v.2 09/23/2025 APPROVED Review Details
09/11/2025 RESTAMP - RESIDENTIAL v.1 09/15/2025 APPROVED Review Details
05/28/2025 SITE FROM MODEL TEMPLATE - INFILL BUILDERS v.1 06/13/2025 REQUIRES RESUBMIT Review Details
10/30/2025 SITE FROM MODEL TEMPLATE INFILL BUILDERS REVISION v.1 10/30/2025 REQUIRES RESUBMIT Review Details
11/10/2025 SITE FROM MODEL TEMPLATE INFILL BUILDERS REVISION v.1 11/12/2025 APPROVED Review Details
11/12/2025 RESTAMP - RESIDENTIAL v.2 11/19/2025 APPROVED Review Details
09/15/2025 ADMINISTRATIVE v.1 09/15/2025 REQUIRES RESUBMIT Review Details

Conditions

Permit Number - TC-MDP-0425-00254
Permit Status: Complete
Permit Description: Greenhill grande duplex (Model master plan TC-MDP-1223-01917)
Date Description Comments
08/18/2025 Please contact Pima County Addressing to resolve issue. Addressing@pima.gov or 520-724-9512
10/30/2025 Please contact Pima County Addressing to resolve issue. Addressing@pima.gov or 520-724-9512
04/23/2025 Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. For review and assessment: apply online at https://permits.pima.gov/ or contact us at sewer@pima.gov, (520) 724-9900.
08/18/2025 Sewer condition must be accepted and released by Pima County prior to issuance of a Temporary Certificate of Occupancy. For More Information visit https://www.pima.gov/1076/Sewer-Connection-Permits, To check your permit status https://permits.pima.gov/
06/11/2025 Truss/Joist Design plans must be submitted and approved prior to intermediate inspections if residential building or finaling the permit if commercial building.

Outstanding Inspections

Permit Status: Complete
Permit Number: TC-MDP-0425-00254
Permite Description: Greenhill grande duplex (Model master plan TC-MDP-1223-01917)
Total Outstanding Inspections - 1
Last Inspection Date Description Inspector Results Comments
11/26/2025 COT - RSPL - Yard Water Line N/A Not Ready Domestic 1” water lines. end to be connected to main,water line.

Completed Inspections

Permit Status: Complete
Permit Number: TC-MDP-0425-00254
Permit Description: Greenhill grande duplex (Model master plan TC-MDP-1223-01917)
Total Completed Inspections - 19
Date Description Inspector Results Comments
09/29/2025 COT - RSPL - Rough Soil Passed Okay to backfill. Shading material required. 9/29/2025
10/02/2025 COT - RSBU - Excavation/Rebar/Zoning Passed
10/02/2025 COT - RSBU - Preslab Passed
10/10/2025 COT - RSBU - Exterior/Interior Clips/Sheathing/Framing Passed
10/10/2025 COT - RSBU - Roof Nailing Passed
10/17/2025 BULD - Electrical Clearance Passed TEP CLEARANCE: ECO, UNIT 1 AND 2.
10/17/2025 COT - RSBU - Interior Shear Bracing Passed
10/17/2025 COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. Passed
10/27/2025 COT - RSBU - Firewall/Fire Barrier/Firestop Passed 10-27-25: second layer of 5/8" on firewall approved. Okay to tape & texture.
12/01/2025 COT - RSPL - Yard Water Line Passed Okay to backfill. Shading required. 12/1/2025
12/05/2025 COT - RSPL - Sewer Passed Okay to backfill. Shading required . 12/5/2025
02/03/2026 COT - RSEL - Electrical Final Passed 2.3.26
Approved
02/03/2026 COT - RSEL - Electrical Underground Passed
02/03/2026 COT - RSEL - Grounding/Bonding Passed 2.3.26
Approved
02/03/2026 COT - RSEL - Outdoor Lighting Passed 2.3.26
Approved
02/03/2026 COT - RSME - Mechanical Final Passed 2.3.26
Approved
02/03/2026 COT - RSPL - Plumbing Final Passed 2.3.26
Approved
02/03/2026 ENGR Engineering Final Passed Site is complete in accordance with approved plans.
02/03/2026 RSBU - Building Final Passed 2.3.26
Approved

Documents

File Name Document Type  
COFO_FINALCOFO_RESIDENTIAL (SSRS).PDF DOCUMENTS VIEW
COFT - PDSD - PERMIT CARD.PDF DOCUMENTS VIEW
1008 27TH SITE PLAN 25-1107_V1.PDF DOCUMENTS VIEW
1010 COMMENT RESPONSE 25-1107_V1.PDF DOCUMENTS VIEW
CONS-1010 27TH SITE PLAN 25-1107_V1.PDF DOCUMENTS VIEW
1010 27TH SITE PLAN_V1.PDF DOCUMENTS VIEW
1010 E 27TH ST_V1.PDF DOCUMENTS VIEW
COFT - PDSD - PERMIT CARD.PDF DOCUMENTS VIEW
1008 27TH SITE PLAN 25-0821_V3.PDF DOCUMENTS VIEW