Permit: TC-MDP-0424-00528
Permit Details
Status:
Inspections Complete
Type:
Model Building Permit
Address:
8883 E PLACITA RIO DE VIDRIO
Address NEW:
8883 E PLACITA RIO DE VIDRIO
Apply Date:
04/29/2024
Applicant:
Cassidy Fenton
Description:
SFR GRR2894T T22-M0002
Permit Reviews
Permit Number - TC-MDP-0424-00528
Permit Status: Inspections complete
Permit Description: SFR GRR2894T T22-M0002
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 04/29/2024 | SITE FROM MODEL PERMIT - SUBDIVISION v.1 | 05/06/2024 | APPROVED |
Outstanding Activity Conditions
Permit Number - TC-MDP-0424-00528
Permit Status: Inspections complete
Permit Description: SFR GRR2894T T22-M0002
Total Outstanding Activity Conditions - 6
| Date | Name |
|---|---|
| 04/26/2024 | Sewer condition must be accepted and released by Pima County prior to issuance of a Temporary Certificate of Occupancy. |
| 05/01/2024 | SPECIAL INSPECTION FOR CONCRETE INSTALLATION IS REQUIRED. |
| 05/01/2024 | SPECIAL INSPECTION FOR EPOXY ANCHORS IS REQUIRED. |
| 05/01/2024 | Masonry Inspection Report submittal review is required. |
| 05/01/2024 | Post-Tension Inspection Report is required. |
| 05/01/2024 | SPECIAL INSPECTION FOR SITE PREPARATION IS REQUIRED. |
Conditions
Permit Number - TC-MDP-0424-00528
Permit Status: Inspections complete
Permit Description: SFR GRR2894T T22-M0002
| Date | Description | Comments |
|---|---|---|
| 04/26/2024 | Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. Contact sewer@pima.gov for review and assessment. |
Outstanding Inspections
Permit Status: Inspections Complete
Permit Number: TC-MDP-0424-00528
Permite Description: SFR GRR2894T T22-M0002
Total Outstanding Inspections - 4
| Last Inspection Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 05/28/2024 | COT - RSPL - Sewer | N/A | Not Applicable | |
| 06/06/2024 | COT - RSBU - Preslab | N/A | Re-inspection required | 6/6/24: all reinforcement must maintain a 3" clearance from earth (making contact in multiple locations), exterior post footings missing per plan, plumbing wrap missing plastic piping. |
| 06/06/2024 | COT - RSEL - Electrical Underground | N/A | Re-inspection required | 6/6/24: all reinforcement must maintain a 3" clearance from earth (making contact in multiple locations), exterior post footings missing per plan, plumbing wrap missing plastic piping. |
| 06/06/2024 | COT - RSBU - Excavation/Rebar/Zoning | N/A | Re-inspection required | 6/6/24: all reinforcement must maintain a 3" clearance from earth (making contact in multiple locations), exterior post footings missing per plan, plumbing wrap missing plastic piping. |
Completed Inspections
Permit Status: Inspections Complete
Permit Number: TC-MDP-0424-00528
Permit Description: SFR GRR2894T T22-M0002
Total Completed Inspections - 20
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 05/28/2024 | COT - RSPL - Yard Water Line | Passed | ||
| 05/28/2024 | COT - RSPL - Rough Soil | Passed | ||
| 06/10/2024 | COT - RSBU - Preslab | Passed | 6/10/24: post tension cabling is properly installed, rebar reinforcement is in place and held up by chairs to maintain the 3" clearance, Ufer ground is in place, and all plumbing pipes are properly wrapped with foam to protect against concrete damage. Underground electrical is installed for kitchen island. Okay to pour concrete. | |
| 06/10/2024 | COT - RSEL - Electrical Underground | Passed | 6/10/24: post tension cabling is properly installed, rebar reinforcement is in place and held up by chairs to maintain the 3" clearance, Ufer ground is in place, and all plumbing pipes are properly wrapped with foam to protect against concrete damage. Underground electrical is installed for kitchen island. Okay to pour concrete. | |
| 06/10/2024 | COT - RSBU - Excavation/Rebar/Zoning | Passed | 6/10/24: post tension cabling is properly installed, rebar reinforcement is in place and held up by chairs to maintain the 3" clearance, Ufer ground is in place, and all plumbing pipes are properly wrapped with foam to protect against concrete damage. Okay to pour concrete. | |
| 07/19/2024 | COT - RSBU - Roof Nailing | Passed | ||
| 07/19/2024 | COT - RSBU - Exterior/Interior Clips/Sheathing/Framing | Passed | ||
| 09/16/2024 | COT - RSEL - Grounding/Bonding | Passed | ||
| 09/16/2024 | COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. | Passed | ||
| 09/16/2024 | BULD - Electrical Clearance | Passed | TEP ECO | |
| 10/07/2024 | COT - RSBU - Interior Shear Bracing | Passed | ||
| 01/02/2025 | COT - BULD - SWG Clearance | Passed | ||
| 01/02/2025 | COT - RSPL - Gas Pressure Test | Passed | ||
| 01/22/2025 | COT - RSEL - Electrical Final | Passed | 1-22-25, electrical, mechanical, plumbing, outdoor lighting, and building finals approved. | |
| 01/22/2025 | COT - RSEL - Outdoor Lighting | Passed | 1-22-25, electrical, mechanical, plumbing, outdoor lighting, and building finals approved. | |
| 01/22/2025 | COT - RSME - Mechanical Final | Passed | 1-22-25, electrical, mechanical, plumbing, outdoor lighting, and building finals approved. | |
| 01/22/2025 | COT - RSPL - Plumbing Final | Passed | 1-22-25, electrical, mechanical, plumbing, outdoor lighting, and building finals approved. | |
| 01/22/2025 | RSBU - Building Final | Passed | 1-22-25, electrical, mechanical, plumbing, outdoor lighting, and building finals approved. | |
| 01/22/2025 | RSBU - Building Progress | Passed | ||
| 01/22/2025 | ENGR Engineering Final | Passed |