Permit Details

Status:
Inspections Complete
Type:
Model Building Permit
Apply Date:
04/29/2024
Applicant:
Cassidy Fenton
Description:
SFR GRR2894T T22-M0002

Permit Reviews

Permit Number - TC-MDP-0424-00528
Permit Status: Inspections complete
Permit Description: SFR GRR2894T T22-M0002
Start Date Submittal Complete Date Status  
04/29/2024 SITE FROM MODEL PERMIT - SUBDIVISION v.1 05/06/2024 APPROVED Review Details

Outstanding Activity Conditions

Permit Number - TC-MDP-0424-00528
Permit Status: Inspections complete
Permit Description: SFR GRR2894T T22-M0002
Total Outstanding Activity Conditions - 6
Date Name
04/26/2024 Sewer condition must be accepted and released by Pima County prior to issuance of a Temporary Certificate of Occupancy.
05/01/2024 SPECIAL INSPECTION FOR CONCRETE INSTALLATION IS REQUIRED.
05/01/2024 SPECIAL INSPECTION FOR EPOXY ANCHORS IS REQUIRED.
05/01/2024 Masonry Inspection Report submittal review is required.
05/01/2024 Post-Tension Inspection Report is required.
05/01/2024 SPECIAL INSPECTION FOR SITE PREPARATION IS REQUIRED.

Conditions

Permit Number - TC-MDP-0424-00528
Permit Status: Inspections complete
Permit Description: SFR GRR2894T T22-M0002
Date Description Comments
04/26/2024 Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. Contact sewer@pima.gov for review and assessment.

Outstanding Inspections

Permit Status: Inspections Complete
Permit Number: TC-MDP-0424-00528
Permite Description: SFR GRR2894T T22-M0002
Total Outstanding Inspections - 4
Last Inspection Date Description Inspector Results Comments
05/28/2024 COT - RSPL - Sewer N/A Not Applicable
06/06/2024 COT - RSBU - Preslab N/A Re-inspection required 6/6/24: all reinforcement must maintain a 3" clearance from earth (making contact in multiple locations), exterior post footings missing per plan, plumbing wrap missing plastic piping.
06/06/2024 COT - RSEL - Electrical Underground N/A Re-inspection required 6/6/24: all reinforcement must maintain a 3" clearance from earth (making contact in multiple locations), exterior post footings missing per plan, plumbing wrap missing plastic piping.
06/06/2024 COT - RSBU - Excavation/Rebar/Zoning N/A Re-inspection required 6/6/24: all reinforcement must maintain a 3" clearance from earth (making contact in multiple locations), exterior post footings missing per plan, plumbing wrap missing plastic piping.

Completed Inspections

Permit Status: Inspections Complete
Permit Number: TC-MDP-0424-00528
Permit Description: SFR GRR2894T T22-M0002
Total Completed Inspections - 20
Date Description Inspector Results Comments
05/28/2024 COT - RSPL - Yard Water Line Passed
05/28/2024 COT - RSPL - Rough Soil Passed
06/10/2024 COT - RSBU - Preslab Passed 6/10/24: post tension cabling is properly installed, rebar reinforcement is in place and held up by chairs to maintain the 3" clearance, Ufer ground is in place, and all plumbing pipes are properly wrapped with foam to protect against concrete damage. Underground electrical is installed for kitchen island. Okay to pour concrete.
06/10/2024 COT - RSEL - Electrical Underground Passed 6/10/24: post tension cabling is properly installed, rebar reinforcement is in place and held up by chairs to maintain the 3" clearance, Ufer ground is in place, and all plumbing pipes are properly wrapped with foam to protect against concrete damage. Underground electrical is installed for kitchen island. Okay to pour concrete.
06/10/2024 COT - RSBU - Excavation/Rebar/Zoning Passed 6/10/24: post tension cabling is properly installed, rebar reinforcement is in place and held up by chairs to maintain the 3" clearance, Ufer ground is in place, and all plumbing pipes are properly wrapped with foam to protect against concrete damage. Okay to pour concrete.
07/19/2024 COT - RSBU - Roof Nailing Passed
07/19/2024 COT - RSBU - Exterior/Interior Clips/Sheathing/Framing Passed
09/16/2024 COT - RSEL - Grounding/Bonding Passed
09/16/2024 COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. Passed
09/16/2024 BULD - Electrical Clearance Passed TEP ECO
10/07/2024 COT - RSBU - Interior Shear Bracing Passed
01/02/2025 COT - BULD - SWG Clearance Passed
01/02/2025 COT - RSPL - Gas Pressure Test Passed
01/22/2025 COT - RSEL - Electrical Final Passed 1-22-25, electrical, mechanical, plumbing, outdoor lighting, and building finals approved.
01/22/2025 COT - RSEL - Outdoor Lighting Passed 1-22-25, electrical, mechanical, plumbing, outdoor lighting, and building finals approved.
01/22/2025 COT - RSME - Mechanical Final Passed 1-22-25, electrical, mechanical, plumbing, outdoor lighting, and building finals approved.
01/22/2025 COT - RSPL - Plumbing Final Passed 1-22-25, electrical, mechanical, plumbing, outdoor lighting, and building finals approved.
01/22/2025 RSBU - Building Final Passed 1-22-25, electrical, mechanical, plumbing, outdoor lighting, and building finals approved.
01/22/2025 RSBU - Building Progress Passed
01/22/2025 ENGR Engineering Final Passed

Documents

File Name Document Type  
COFT - PDSD - PERMIT CARD.PDF DOCUMENTS VIEW
GEOTECH REPORT EBC LOT 4_V1.PDF DOCUMENTS VIEW
SIC EBC LOT 4-2024-04-29_V1.PDF DOCUMENTS VIEW
SITE PLAN_V1.PDF DOCUMENTS VIEW