Inspection Status: Re-inspection required
Inspection History: COT - RSBU - Preslab
| Date |
Description |
Inspector |
Results |
Comments |
| 06/06/2024 |
COT - RSBU - Preslab |
|
Re-inspection required |
6/6/24: all reinforcement must maintain a 3" clearance from earth (making contact in multiple locations), exterior post footings missing per plan, plumbing wrap missing plastic piping. |
| 06/10/2024 |
COT - RSBU - Preslab |
|
Passed |
6/10/24: post tension cabling is properly installed, rebar reinforcement is in place and held up by chairs to maintain the 3" clearance, Ufer ground is in place, and all plumbing pipes are properly wrapped with foam to protect against concrete damage. Underground electrical is installed for kitchen island. Okay to pour concrete. |