Permit: TC-MDP-0424-00521
Permit Details
Apply Date:
06/21/2024
Applicant:
Joshua Swinney
Description:
American Samoa Model Plan La Escalera
Permit Reviews
Permit Number - TC-MDP-0424-00521
Permit Status: Inspections
Permit Description: American Samoa Model Plan La Escalera
Start Date | Submittal | Complete Date | Status |
---|---|---|---|
06/21/2024 | SITE FROM MODEL PERMIT - PRODUCTION v.1 | 06/24/2024 | APPROVED |
Outstanding Activity Conditions
Permit Number - TC-MDP-0424-00521
Permit Status: Inspections
Permit Description: American Samoa Model Plan La Escalera
Total Outstanding Activity Conditions - 5
Date | Name |
---|---|
04/25/2024 | Sewer condition must be accepted and released by Pima County prior to issuance of a Temporary Certificate of Occupancy. |
06/24/2024 | SPECIAL INSPECTION FOR EPOXY ANCHORS IS REQUIRED. |
06/24/2024 | SPECIAL INSPECTION FOR POST TENSION SLAB IS REQUIRED. |
06/24/2024 | Post-Tension Inspection Report is required. |
06/24/2024 | SPECIAL INSPECTION FOR SPECIAL GRADING, EXCAVATION AND FILLING IS REQUIRED. |
Conditions
Permit Number - TC-MDP-0424-00521
Permit Status: Inspections
Permit Description: American Samoa Model Plan La Escalera
Date | Description | Comments |
---|---|---|
04/25/2024 | Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. Contact sewer@pima.gov for review and assessment. | |
06/24/2024 | Truss/Joist Design plans must be submitted and approved prior to intermediate inspections if residential building or finaling the permit if commercial building. |
Outstanding Inspections
Permit Status: Inspections
Permit Number: TC-MDP-0424-00521
Permite Description: American Samoa Model Plan La Escalera
Total Outstanding Inspections - 3
Last Inspection Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
10/21/2024 | COT - RSPL - Yard Water Line | N/A | Partial Pass | PARTIAL PASS--Water meter is not installed and water line to house is under 60# psi pressure with no leaks. Okay to shade pipe and backfill trench. |
11/18/2024 | COT - RSBU - Exterior Clips/Sheathing | N/A | Re-inspection required | Missing shear wall at garage entry. Loose shear walls on both east and west end in kitchen areas. Stud spacing call for 12" o.c north wall of kitchen. Provide anchor bolts at marked areas. Nail masa clip at garage. Nosing exceeded 1 1/4" at landing. Plans call for two cs16 straps at both north and south shear wall tie downs. Stopped inspection. Other items may occur. 11/18/2024 |
11/18/2024 | COT - RSBU - Roof Nailing | N/A | Re-inspection required | Missing shear wall at garage entry. Loose shear walls on both east and west end in kitchen areas. Stud spacing call for 12" o.c north wall of kitchen. Provide anchor bolts at marked areas. Nail masa clip at garage. Nosing exceeded 1 1/4" at landing. Plans call for two cs16 straps at both north and south shear wall tie downs. Stopped inspection. Other items may occur. 11/18/2024 |
Completed Inspections
Permit Status: Inspections
Permit Number: TC-MDP-0424-00521
Permit Description: American Samoa Model Plan La Escalera
Total Completed Inspections - 7
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
10/21/2024 | COT - RSPL - Backwater Valve | Passed | Backwater valve is installed. Okay to shade pipe and backfill trench. | |
10/21/2024 | COT - RSPL - Rough Soil | Passed | Underground plumbing is complete and under a water test with no leaks. Okay to shade pipe and backfill trenches. | |
10/21/2024 | COT - RSPL - Sewer | Passed | Sewer line is connected and under water pressure test with no leaks. Okay to shade pipe and backfill trench. | |
11/01/2024 | COT - RSBU - Excavation/Rebar/Zoning | Passed | 11-1-24, setbacks verified per approved plans. | |
11/01/2024 | COT - RSBU - Preslab | Passed | 11-1-24, pre slab per approved plans. Okay to pour concrete. | |
11/01/2024 | COT - RSEL - Electrical Underground | Passed | 11-1-24, approved. | |
11/01/2024 | COT - RSEL - Grounding/Bonding | Passed | 11-1-24, grounding/bonding per approved plans. |