Permit Details

Status:
Inspections Complete
Type:
Model Building Permit
Apply Date:
04/19/2024
Applicant:
Celina Rodriguez
Description:
SFR BT2013-140 T22-M0036

Permit Reviews

Permit Number - TC-MDP-0424-00503
Permit Status: Inspections complete
Permit Description: SFR BT2013-140 T22-M0036
Start Date Submittal Complete Date Status  
04/19/2024 SITE FROM MODEL PERMIT - PRODUCTION v.1 05/01/2024 APPROVED Review Details

Outstanding Activity Conditions

Permit Number - TC-MDP-0424-00503
Permit Status: Inspections complete
Permit Description: SFR BT2013-140 T22-M0036
Total Outstanding Activity Conditions - 5
Date Name
04/17/2024 Sewer condition must be accepted and released by Pima County prior to issuance of a Temporary Certificate of Occupancy.
04/19/2024 SPECIAL INSPECTION FOR EPOXY ANCHORS IS REQUIRED.
04/19/2024 SPECIAL INSPECTION FOR POST TENSION SLAB IS REQUIRED.
04/19/2024 Post-Tension Inspection Report is required.
04/19/2024 Truss/Joist Design plans must be submitted and approved prior to intermediate inspections if residential building or finaling the permit if commercial building.

Conditions

Permit Number - TC-MDP-0424-00503
Permit Status: Inspections complete
Permit Description: SFR BT2013-140 T22-M0036
Date Description Comments
04/17/2024 Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. Contact sewer@pima.gov for review and assessment.

Outstanding Inspections

Permit Status: Inspections Complete
Permit Number: TC-MDP-0424-00503
Permite Description: SFR BT2013-140 T22-M0036
Total Outstanding Inspections - 4
Last Inspection Date Description Inspector Results Comments
10/04/2024 COT - RSEL - Electrical Final N/A Re-inspection required 10/4/24: Pressure relief valve must terminate 6" above grade, A/C condenser must have a 3" clearance from grade, GFCI required at laundry room, please leave approved plan set for final inspection, post tension tag required at hose bib, smoke alarms must be interconnected,
10/04/2024 COT - RSME - Mechanical Final N/A Re-inspection required 10/4/24: Pressure relief valve must terminate 6" above grade, A/C condenser must have a 3" clearance from grade, GFCI required at laundry room, please leave approved plan set for final inspection, post tension tag required at hose bib, smoke alarms must be interconnected,
10/04/2024 COT - RSPL - Plumbing Final N/A Re-inspection required 10/4/24: Pressure relief valve must terminate 6" above grade, A/C condenser must have a 3" clearance from grade, GFCI required at laundry room, please leave approved plan set for final inspection, post tension tag required at hose bib, smoke alarms must be interconnected,
10/04/2024 RSBU - Building Final N/A Re-inspection required 10/4/24: Pressure relief valve must terminate 6" above grade, A/C condenser must have a 3" clearance from grade, GFCI required at laundry room, please leave approved plan set for final inspection, post tension tag required at hose bib, smoke alarms must be interconnected,

Completed Inspections

Permit Status: Inspections Complete
Permit Number: TC-MDP-0424-00503
Permit Description: SFR BT2013-140 T22-M0036
Total Completed Inspections - 21
Date Description Inspector Results Comments
05/09/2024 COT - RSPL - Yard Water Line Passed
05/09/2024 COT - RSPL - Sewer Passed
05/09/2024 COT - RSPL - Rough Soil Passed
05/15/2024 COT - RSEL - Grounding/Bonding Passed
05/15/2024 COT - RSEL - Electrical Underground Passed
05/16/2024 COT - RSBU - Excavation/Rebar/Zoning Passed
05/16/2024 COT - RSBU - Preslab Passed
06/06/2024 COT - RSBU - Exterior Clips/Sheathing Passed
06/06/2024 COT - RSBU - Roof Nailing Passed
07/05/2024 COT - RSPL - Gas Pressure Test Passed Gas line under air pressure of 15# and holding with no leaks.
07/10/2024 COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. Passed 7/10/24: Ductwork is now complete and smoke detector in bedroom #2 has been relocated to 6 feet away from register. Okay to proceed with insulation and drywall installation.
07/26/2024 COT - RSBU - Interior Shear Bracing Passed Drywall for interior shear walls is properly secured to studs per plan requirements. Okay to proceed with drywall tape, texture, and paint.
08/01/2024 BULD - Electrical Clearance Passed Clearance for TEP ECO. 8/1/2024
09/16/2024 COT - BULD - SWG Clearance Passed Passes electrical clearance ECO 9/16/2024
10/04/2024 COT - RSEL - Outdoor Lighting Passed
10/04/2024 ENGR Engineering Final Passed CO Ready
10/04/2024 RSBU - Building Progress Passed
10/09/2024 COT - RSEL - Electrical Final Passed 10/9/24: All items noted above have been corrected. Construction is complete. Okay to issue Certificate of Occupancy.
10/09/2024 COT - RSME - Mechanical Final Passed 10/9/24: All items noted above have been corrected. Construction is complete. Okay to issue Certificate of Occupancy.
10/09/2024 COT - RSPL - Plumbing Final Passed 10/9/24: All items noted above have been corrected. Construction is complete. Okay to issue Certificate of Occupancy.
10/09/2024 RSBU - Building Final Passed 10/9/24: All items noted above have been corrected. Construction is complete. Okay to issue Certificate of Occupancy.

Documents

File Name Document Type  
COFT - PDSD - PERMIT CARD.PDF DOCUMENTS VIEW
BELLA TIERRA PHASE 2 - LOT 19 REVISED START_V1.PDF DOCUMENTS VIEW
BTII 19 SIC-2024-04-19_V1.PDF DOCUMENTS VIEW