Permit Details

Status:
Issued
Type:
Model Building Permit
Address:
9676 E HARKES DR
Apply Date:
04/17/2024
Applicant:
Joshua Swinney
Description:
Indiana Dunes Model Plan La Escalera

Permit Reviews

Permit Number - TC-MDP-0424-00456
Permit Status: Issued
Permit Description: Indiana Dunes Model Plan La Escalera
Start Date Submittal Complete Date Status  
05/03/2024 SITE FROM MODEL PERMIT - PRODUCTION v.1 05/09/2024 APPROVED Review Details

Outstanding Activity Conditions

Permit Number - TC-MDP-0424-00456
Permit Status: Issued
Permit Description: Indiana Dunes Model Plan La Escalera
Total Outstanding Activity Conditions - 5
Date Name
04/17/2024 Post-Tension Inspection Report is required.
04/17/2024 Sewer condition must be accepted and released by Pima County prior to issuance of a Temporary Certificate of Occupancy.
05/08/2024 SPECIAL INSPECTION FOR EPOXY ANCHORS IS REQUIRED.
05/08/2024 SPECIAL INSPECTION FOR POST TENSION SLAB IS REQUIRED.
05/08/2024 SPECIAL INSPECTION FOR SPECIAL GRADING, EXCAVATION AND FILLING IS REQUIRED.

Conditions

Permit Number - TC-MDP-0424-00456
Permit Status: Issued
Permit Description: Indiana Dunes Model Plan La Escalera
Date Description Comments
04/17/2024 Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. Contact sewer@pima.gov for review and assessment.
04/17/2024 Truss/Joist Design plans must be submitted and approved prior to intermediate inspections if residential building or finaling the permit if commercial building.

Outstanding Inspections

Permit Status: Issued
Permit Number: TC-MDP-0424-00456
Permite Description: Indiana Dunes Model Plan La Escalera
Total Outstanding Inspections - 2
Last Inspection Date Description Inspector Results Comments
10/03/2024 COT - RSPL - Gas Pressure Test N/A Not Applicable
10/03/2024 COT - BULD - SWG Clearance N/A Not Applicable

Completed Inspections

Permit Status: Issued
Permit Number: TC-MDP-0424-00456
Permit Description: Indiana Dunes Model Plan La Escalera
Total Completed Inspections - 12
Date Description Inspector Results Comments
05/30/2024 COT - RSPL - Rough Soil Passed
05/30/2024 COT - RSPL - Yard Water Line Passed
06/12/2024 COT - RSBU - Excavation/Rebar/Zoning Passed Concrete forms are set, post tension cabling is properly installed and evenly spaced, rebar reinforcement is in place per plans, masa clips and shear wall hold downs are properly secured to form, subsoil is compacted, underground plumbing is properly wrapped with foam, underground electrical is installed for kitchen island, and Ufer ground is installed in footing on garage side of house.
06/12/2024 COT - RSBU - Preslab Passed Concrete forms are set, post tension cabling is properly installed and evenly spaced, rebar reinforcement is in place per plans, masa clips and shear wall hold downs are properly secured to form, subsoil is compacted, underground plumbing is properly wrapped with foam, underground electrical is installed for kitchen island, and Ufer ground is installed in footing on garage side of house.
06/12/2024 COT - RSEL - Electrical Underground Passed Concrete forms are set, post tension cabling is properly installed and evenly spaced, rebar reinforcement is in place per plans, masa clips and shear wall hold downs are properly secured to form, subsoil is compacted, underground plumbing is properly wrapped with foam, underground electrical is installed for kitchen island, and Ufer ground is installed in footing on garage side of house.
06/12/2024 COT - RSEL - Grounding/Bonding Passed Concrete forms are set, post tension cabling is properly installed and evenly spaced, rebar reinforcement is in place per plans, masa clips and shear wall hold downs are properly secured to form, subsoil is compacted, underground plumbing is properly wrapped with foam, underground electrical is installed for kitchen island, and Ufer ground is installed in footing on garage side of house.
07/09/2024 COT - RSBU - Roof Nailing Passed
07/12/2024 COT - RSBU - Exterior Clips/Sheathing Passed 7/12/24: Support has been added for girder truss, missing RSP Clip has been installed, other has been properly nailed. Okay to proceed with rough-in.
09/19/2024 COT - RSPL - Backwater Valve Passed
09/19/2024 COT - RSPL - Sewer Passed
10/16/2024 COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. Passed 10/16/24: Shower pan is full of water, bottom plate has been completed, DWV is under water testt after being repaired from nail and staple puncher, all penetrations in top plate and bottom plate have been foamed, and shot pins have been added where needed. Okay to proceed with insulation and drywall installation.
11/13/2024 COT - RSBU - Interior Shear Bracing Passed 11-13-24, approved. Okay to tape and texture

Documents

File Name Document Type  
COFT - PDSD - PERMIT CARD.PDF DOCUMENTS VIEW
PHASE 1 LOT 48 PLOT PLAN_V1.PDF DOCUMENTS VIEW
PHASE 1A LOT 48 SIC-2024-05-02_V1.PDF DOCUMENTS VIEW