Permit: TC-MDP-0424-00435
Permit Details
Apply Date:
04/12/2024
Applicant:
Daria Hopkins
Description:
SFR MER1402190 T21-M0078
Permit Reviews
Permit Number - TC-MDP-0424-00435
Permit Status: Issued
Permit Description: SFR MER1402190 T21-M0078
Start Date | Submittal | Complete Date | Status |
---|---|---|---|
10/08/2024 | BUILDING DEFERRED SUBMITTAL REVIEW v.1 | 10/08/2024 | APPROVED |
04/15/2024 | SITE FROM MODEL PERMIT - PRODUCTION v.1 | 04/22/2024 | APPROVED |
Outstanding Activity Conditions
Permit Number - TC-MDP-0424-00435
Permit Status: Issued
Permit Description: SFR MER1402190 T21-M0078
Total Outstanding Activity Conditions - 4
Date | Name |
---|---|
04/18/2024 | SPECIAL INSPECTION FOR CONCRETE INSTALLATION IS REQUIRED. |
04/18/2024 | SPECIAL INSPECTION FOR EPOXY ANCHORS IS REQUIRED. |
04/18/2024 | SPECIAL INSPECTION FOR POST TENSION SLAB IS REQUIRED. |
04/18/2024 | Post-Tension Inspection Report is required. |
Conditions
Permit Number - TC-MDP-0424-00435
Permit Status: Issued
Permit Description: SFR MER1402190 T21-M0078
Date | Description | Comments |
---|---|---|
04/18/2024 | Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. Contact sewer@pima.gov for review and assessment. | |
10/08/2024 | Sewer condition must be accepted and released by Pima County prior to issuance of a Temporary Certificate of Occupancy. For More Information visit https://www.pima.gov/1076/Sewer-Connection-Permits, To check your permit status https://permits.pima.gov/ | |
04/18/2024 | Truss/Joist Design plans must be submitted and approved prior to intermediate inspections if residential building or finaling the permit if commercial building. |
Outstanding Inspections
Permit Status: Issued
Permit Number: TC-MDP-0424-00435
Permite Description: SFR MER1402190 T21-M0078
Total Outstanding Inspections - 2
Last Inspection Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
10/17/2024 | BULD - Electrical Clearance | N/A | Re-inspection required | 10-17-24, properly secure riser together with missing knockout at main panel. 10/17/24: seal all penetrations through vapor barrier, outdoor light fixtures are exceeding box fill 6 Cubic inches allowed, properly secure lath at pop outs, Thermostat shall be no higher than 54” above finish floor, pex needs proper support on vertical runs, remove lath material in attic, ground all metal fixtures, NM wiring must be secured 12” from box/fixtures, receptacle spacing at master bedroom not per code. FHA plate required at Dryer vent exhaust. |
10/17/2024 | COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. | N/A | Re-inspection required | 10-17-24, properly secure riser together with missing knockout at main panel. 10/17/24: seal all penetrations through vapor barrier, outdoor light fixtures are exceeding box fill 6 Cubic inches allowed, properly secure lath at pop outs, Thermostat shall be no higher than 54” above finish floor, pex needs proper support on vertical runs, remove lath material in attic, ground all metal fixtures, NM wiring must be secured 12” from box/fixtures, receptacle spacing at master bedroom not per code. FHA plate required at Dryer vent exhaust. |
Completed Inspections
Permit Status: Issued
Permit Number: TC-MDP-0424-00435
Permit Description: SFR MER1402190 T21-M0078
Total Completed Inspections - 13
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
08/21/2024 | COT - RSPL - Rough Soil | Passed | ||
08/21/2024 | COT - RSPL - Sewer | Passed | ||
08/21/2024 | COT - RSPL - Yard Water Line | Passed | ||
08/29/2024 | COT - RSBU - Excavation/Rebar/Zoning | Passed | ||
08/29/2024 | COT - RSBU - Preslab | Passed | ||
08/29/2024 | COT - RSEL - Electrical Underground | Passed | ||
09/18/2024 | COT - RSBU - Roof Nailing | Passed | ||
09/18/2024 | COT - RSBU - Exterior Clips/Sheathing | Passed | ||
10/17/2024 | COT - RSEL - Grounding/Bonding | Passed | 10-17-24, approved. | |
10/17/2024 | COT - RSPL - Gas Pressure Test | Passed | 10-17-24, gas pressure test inspected and approved. | |
10/18/2024 | BULD - Electrical Clearance | Passed | 10/18/24: ECO Clearance issued | |
10/18/2024 | COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. | Passed | 10/18/24: Items noted on last inspection have been corrected. Okay to proceed with installation of insulation and drywall. | |
11/08/2024 | COT - RSBU - Interior Shear Bracing | Passed | Drywall is properly secured to studs per plan requirements for interior shear walls. Okay to proceed with tape, texture, and paint. |