Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Inspection History Details
Inspection Status: Re-inspection required
Inspection History: COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in.
Permit Number - TC-MDP-0424-00435
Inspection Description - COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in.
Inspection Status - Re-inspection required
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
10/17/2024 | COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. | Re-inspection required | 10-17-24, properly secure riser together with missing knockout at main panel. 10/17/24: seal all penetrations through vapor barrier, outdoor light fixtures are exceeding box fill 6 Cubic inches allowed, properly secure lath at pop outs, Thermostat shall be no higher than 54” above finish floor, pex needs proper support on vertical runs, remove lath material in attic, ground all metal fixtures, NM wiring must be secured 12” from box/fixtures, receptacle spacing at master bedroom not per code. FHA plate required at Dryer vent exhaust. |
|
10/18/2024 | COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. | Passed | 10/18/24: Items noted on last inspection have been corrected. Okay to proceed with installation of insulation and drywall. |