Permit: TC-MDP-0424-00397
Permit Details
Status:
Inspections Complete
Type:
Model Building Permit
Address:
6736 E VIA DE AYATE
Address NEW:
6736 E VIA DE AYATE
Apply Date:
05/16/2024
Applicant:
Craig Morczynski
Description:
SFR LENNLE4004 T22-M0048
Permit Reviews
Permit Number - TC-MDP-0424-00397
Permit Status: Inspections complete
Permit Description: SFR LENNLE4004 T22-M0048
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 05/17/2024 | SITE FROM MODEL PERMIT - SUBDIVISION v.1 | 05/22/2024 | APPROVED |
Outstanding Activity Conditions
Permit Number - TC-MDP-0424-00397
Permit Status: Inspections complete
Permit Description: SFR LENNLE4004 T22-M0048
Total Outstanding Activity Conditions - 6
| Date | Name |
|---|---|
| 04/02/2024 | Sewer condition must be accepted and released by Pima County prior to issuance of a Temporary Certificate of Occupancy. |
| 05/21/2024 | SPECIAL INSPECTION FOR EPOXY ANCHORS IS REQUIRED. |
| 05/21/2024 | SPECIAL INSPECTION FOR POST TENSION SLAB IS REQUIRED. |
| 05/21/2024 | Post-Tension Inspection Report is required. |
| 05/21/2024 | SPECIAL INSPECTION FOR SPECIAL GRADING, EXCAVATION AND FILLING IS REQUIRED. |
| 07/18/2023 | Sewer condition must be accepted and released by Pima County prior to issuance of a Temporary Certificate of Occupancy. |
Conditions
Permit Number - TC-MDP-0424-00397
Permit Status: Inspections complete
Permit Description: SFR LENNLE4004 T22-M0048
| Date | Description | Comments |
|---|---|---|
| 05/22/2024 | Contractor with active Arizona Contractor's License for specified scope of work, or a signed Owner Builder Affidavit https://www.tucsonaz.gov/files/sharedassets/public/v/1/pdsd/documents/permits/residential-permits/pdsd_owner_builder_affidavit_081623.pdf, is required prior to issuance of permit. Contractor or Owner must have a TDC Online account and be added to the permit as the correct contact type https://www.tucsonaz.gov/files/sharedassets/public/v/2/pdsd/documents/tdc-faq/new-pdfs/adding-additional-contacts.pdf. If you are providing an Owner Builder Affidavit, the owner MUST be attached as a contact on the permit. | |
| 04/02/2024 | Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. Contact sewer@pima.gov for review and assessment. | |
| 07/18/2023 | Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. Contact sewer@pima.gov for review and assessment. | |
| 05/21/2024 | Truss/Joist Design plans must be submitted and approved prior to intermediate inspections if residential building or finaling the permit if commercial building. |
Outstanding Inspections
Permit Status: Inspections Complete
Permit Number: TC-MDP-0424-00397
Permite Description: SFR LENNLE4004 T22-M0048
Total Outstanding Inspections - 2
| Last Inspection Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 03/06/2025 | COT - RSEL - Electrical Final | N/A | Re-inspection required | 6 Mar 25 1. Missing fire rating tag on garage door, required per NFPA. 2. Bulb in attic needs to be protected. 3. Post tension sign missing in garage slab. |
| 03/06/2025 | RSBU - Building Final | N/A | Re-inspection required | 6 Mar 25 1. Missing fire rating tag on garage door, required per NFPA. 2. Bulb in attic needs to be protected. 3. Post tension sign missing in garage slab. |
Completed Inspections
Permit Status: Inspections Complete
Permit Number: TC-MDP-0424-00397
Permit Description: SFR LENNLE4004 T22-M0048
Total Completed Inspections - 21
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 07/17/2024 | COT - RSPL - Rough Soil | Passed | Okay to backfill. Shading required. 7/17/2024 | |
| 07/17/2024 | COT - RSPL - Sewer | Passed | Okay to backfill. Shading required. 7/17/2024 | |
| 07/17/2024 | COT - RSPL - Yard Water Line | Passed | Okay to backfill. Shading required. 7/17/2024 | |
| 07/30/2024 | COT - RSEL - Electrical Underground | Passed | ||
| 07/30/2024 | COT - RSEL - Grounding/Bonding | Passed | ||
| 08/07/2024 | COT - RSBU - Preslab | Passed | ||
| 08/07/2024 | COT - RSBU - Excavation/Rebar/Zoning | Passed | ||
| 09/09/2024 | COT - RSBU - Exterior/Interior Clips/Sheathing/Framing | Passed | 9/9/2024 corrections were made. Approved. | |
| 09/09/2024 | COT - RSBU - Roof Nailing | Passed | 9/9/2024 corrections were made. Approved. | |
| 10/07/2024 | BULD - Electrical Clearance | Passed | Pass 10/7/24 electrical clearance | |
| 10/31/2024 | COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. | Passed | 10-31-24, previously noted items have been corrected. Gas pressure test verified at 15 psi. Okay to proceed with construction. | |
| 10/31/2024 | COT - RSPL - Gas Pressure Test | Passed | 10-31-24, previously noted items have been corrected. Gas pressure test verified at 15 psi. Okay to proceed with construction. | |
| 10/31/2024 | RSBU - Building Progress | Passed | 10-31-24, previously noted items have been corrected. Gas pressure test verified at 15 psi. Okay to proceed with construction. | |
| 11/22/2024 | COT - RSBU - Interior Shear Bracing | Passed | 11-22-24, interior shear wall inspection approved. Okay to tape and texture. | |
| 01/28/2025 | COT - BULD - SWG Clearance | Passed | 1/28/25 approval for SWG clearance. | |
| 03/06/2025 | COT - RSEL - Outdoor Lighting | Passed | ||
| 03/06/2025 | COT - RSME - Mechanical Final | Passed | ||
| 03/06/2025 | COT - RSPL - Plumbing Final | Passed | ||
| 03/06/2025 | ENGR Engineering Final | Passed | CO Ready | |
| 03/14/2025 | COT - RSEL - Electrical Final | Passed | 14 March 25 Pass |
|
| 03/14/2025 | RSBU - Building Final | Passed | 14 March 25 Pass |