Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Inspection History Details
Inspection Status: Re-inspection required
Inspection History: COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in.
Permit Number - TC-MDP-0424-00397
Inspection Description - COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in.
Inspection Status - Re-inspection required
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
10/28/2024 | COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. | Re-inspection required | 10-28-24, pressurize gas to 15 psi(gage at 9psi), properly seal vapor barrier at staircase, upstairs bedrooms. Master bedroom missing an approximate 16' by 5' section of barrier, missing fire foam at upstairs bath 2, fire foam upstairs chute, remove debris from truss at garage and upstairs northeast bedroom, install larger fha plate at garage to properly protect copper line near pex on east wall. Stopped inspection, additional items needing correction may be noted. | |
10/29/2024 | COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. | Re-inspection required | 10-29-24, vapor barrier not sealed in upstairs bedroom (northeast bedroom), upstairs shower not under test, fire foam missing in top plate at water closet (south bathroom), stopped inspection- additional items may be noted. See previous notes. | |
10/31/2024 | COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. | Passed | 10-31-24, previously noted items have been corrected. Gas pressure test verified at 15 psi. Okay to proceed with construction. |