Permit: TC-MDP-0424-00397
Permit Details
Apply Date:
05/16/2024
Applicant:
Craig Morczynski
Description:
SFR LENNLE4004 T22-M0048
Permit Reviews
Permit Number - TC-MDP-0424-00397
Permit Status: Issued
Permit Description: SFR LENNLE4004 T22-M0048
Start Date | Submittal | Complete Date | Status |
---|---|---|---|
05/17/2024 | SITE FROM MODEL PERMIT - PRODUCTION v.1 | 05/22/2024 | APPROVED |
Outstanding Activity Conditions
Permit Number - TC-MDP-0424-00397
Permit Status: Issued
Permit Description: SFR LENNLE4004 T22-M0048
Total Outstanding Activity Conditions - 6
Date | Name |
---|---|
04/02/2024 | Sewer condition must be accepted and released by Pima County prior to issuance of a Temporary Certificate of Occupancy. |
05/21/2024 | SPECIAL INSPECTION FOR EPOXY ANCHORS IS REQUIRED. |
05/21/2024 | SPECIAL INSPECTION FOR POST TENSION SLAB IS REQUIRED. |
05/21/2024 | Post-Tension Inspection Report is required. |
05/21/2024 | SPECIAL INSPECTION FOR SPECIAL GRADING, EXCAVATION AND FILLING IS REQUIRED. |
07/18/2023 | Sewer condition must be accepted and released by Pima County prior to issuance of a Temporary Certificate of Occupancy. |
Conditions
Permit Number - TC-MDP-0424-00397
Permit Status: Issued
Permit Description: SFR LENNLE4004 T22-M0048
Date | Description | Comments |
---|---|---|
05/22/2024 | Contractor with active Arizona Contractor's License for specified scope of work, or a signed Owner Builder Affidavit https://www.tucsonaz.gov/files/sharedassets/public/v/1/pdsd/documents/permits/residential-permits/pdsd_owner_builder_affidavit_081623.pdf, is required prior to issuance of permit. Contractor or Owner must have a TDC Online account and be added to the permit as the correct contact type https://www.tucsonaz.gov/files/sharedassets/public/v/2/pdsd/documents/tdc-faq/new-pdfs/adding-additional-contacts.pdf. If you are providing an Owner Builder Affidavit, the owner MUST be attached as a contact on the permit. | |
04/02/2024 | Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. Contact sewer@pima.gov for review and assessment. | |
07/18/2023 | Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. Contact sewer@pima.gov for review and assessment. | |
05/21/2024 | Truss/Joist Design plans must be submitted and approved prior to intermediate inspections if residential building or finaling the permit if commercial building. |
Completed Inspections
Permit Status: Issued
Permit Number: TC-MDP-0424-00397
Permit Description: SFR LENNLE4004 T22-M0048
Total Completed Inspections - 14
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
07/17/2024 | COT - RSPL - Rough Soil | Passed | Okay to backfill. Shading required. 7/17/2024 | |
07/17/2024 | COT - RSPL - Sewer | Passed | Okay to backfill. Shading required. 7/17/2024 | |
07/17/2024 | COT - RSPL - Yard Water Line | Passed | Okay to backfill. Shading required. 7/17/2024 | |
07/30/2024 | COT - RSEL - Electrical Underground | Passed | ||
07/30/2024 | COT - RSEL - Grounding/Bonding | Passed | ||
08/07/2024 | COT - RSBU - Preslab | Passed | ||
08/07/2024 | COT - RSBU - Excavation/Rebar/Zoning | Passed | ||
09/09/2024 | COT - RSBU - Exterior Clips/Sheathing | Passed | 9/9/2024 corrections were made. Approved. | |
09/09/2024 | COT - RSBU - Roof Nailing | Passed | 9/9/2024 corrections were made. Approved. | |
10/07/2024 | BULD - Electrical Clearance | Passed | Pass 10/7/24 electrical clearance | |
10/31/2024 | COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. | Passed | 10-31-24, previously noted items have been corrected. Gas pressure test verified at 15 psi. Okay to proceed with construction. | |
10/31/2024 | COT - RSPL - Gas Pressure Test | Passed | 10-31-24, previously noted items have been corrected. Gas pressure test verified at 15 psi. Okay to proceed with construction. | |
10/31/2024 | RSBU - Building Progress | Passed | 10-31-24, previously noted items have been corrected. Gas pressure test verified at 15 psi. Okay to proceed with construction. | |
11/22/2024 | COT - RSBU - Interior Shear Bracing | Passed | 11-22-24, interior shear wall inspection approved. Okay to tape and texture. |