Permit: TC-MDP-0324-00345
Permit Details
Status:
Complete
Type:
Model Building Permit
Address:
6557 E PASEO ALGA
Address NEW:
6557 E PASEO ALGA
Apply Date:
03/20/2024
Applicant:
Brianna Quiroz
Description:
Roosevelt Model SFR La Estancia (Revision 1 Truss)
Permit Reviews
Permit Number - TC-MDP-0324-00345
Permit Status: Complete
Permit Description: Roosevelt Model SFR La Estancia (Revision 1 Truss)
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 03/20/2024 | SITE FROM MODEL PERMIT - SUBDIVISION v.1 | 03/27/2024 | APPROVED |
| 12/20/2024 | BUILDING DEFERRED SUBMITTAL REVIEW v.1 | 12/26/2024 | APPROVED |
Conditions
Permit Number - TC-MDP-0324-00345
Permit Status: Complete
Permit Description: Roosevelt Model SFR La Estancia (Revision 1 Truss)
| Date | Description | Comments |
|---|---|---|
| 03/20/2024 | Post-Tension Inspection Report is required. | |
| 03/20/2024 | Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. Contact sewer@pima.gov for review and assessment. | |
| 03/20/2024 | Sewer condition must be accepted and released by Pima County prior to issuance of a Temporary Certificate of Occupancy. | |
| 03/20/2024 | Truss/Joist Design plans must be submitted and approved prior to intermediate inspections if residential building or finaling the permit if commercial building. |
Completed Inspections
Permit Status: Complete
Permit Number: TC-MDP-0324-00345
Permit Description: Roosevelt Model SFR La Estancia (Revision 1 Truss)
Total Completed Inspections - 21
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 07/25/2024 | COT - BULD - SWG Clearance | Passed | ||
| 07/25/2024 | COT - RSPL - Gas Pressure Test | Passed | ||
| 07/25/2024 | COT - RSPL - Yard Water Line | Passed | Okay to backfill. Shading required. 7/25/2024 | |
| 07/25/2024 | COT - RSEL - Electrical Underground | Passed | ||
| 07/26/2024 | COT - RSPL - Rough Soil | Passed | Approved. Okay to backfill. Shading required. 7/26/2024 | |
| 07/26/2024 | COT - RSPL - Sewer | Passed | Approved. Okay to backfill. Shading required. 7/26/2024 | |
| 08/08/2024 | COT - RSBU - Excavation/Rebar/Zoning | Passed | ||
| 08/08/2024 | COT - RSEL - Grounding/Bonding | Passed | ||
| 08/08/2024 | COT - RSBU - Preslab | Passed | ||
| 09/13/2024 | COT - RSBU - Exterior/Interior Clips/Sheathing/Framing | Passed | Corrections were made. 9/13/2024 | |
| 09/13/2024 | COT - RSBU - Roof Nailing | Passed | Corrections were made. 9/13/2024 | |
| 11/04/2024 | BULD - Electrical Clearance | Passed | 11-4-24, panel approved to be energized. | |
| 11/06/2024 | COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. | Passed | 11-6-24, fire foam added to areas in question. Receptacles to island were not made up because contractor utilize quartz counter tops Once installed, electrician will add box receptacles.Intermediate inspection approved. | |
| 11/27/2024 | COT - RSBU - Interior Shear Bracing | Passed | 11-27-24, approved. | |
| 01/21/2025 | COT - RSEL - Electrical Final | Passed | 1-21-25, electrical final approved | |
| 01/21/2025 | COT - RSEL - Outdoor Lighting | Passed | 1-21-25, approved | |
| 01/21/2025 | COT - RSME - Mechanical Final | Passed | 1-21-25, mechanical final approved | |
| 01/21/2025 | COT - RSPL - Plumbing Final | Passed | 1-21-25, plumbing final approved | |
| 01/21/2025 | ENGR Engineering Final | Passed | CO Ready | |
| 01/21/2025 | RSBU - Building Final | Passed | 1-21-25, building final approved. | |
| 01/21/2025 | RSBU - Building Progress | Passed |