Permit: TC-MDP-0324-00274
Permit Details
Apply Date:
03/29/2024
Applicant:
Daria Hopkins
Description:
SFR MER1301460 T21-M0072 REV1 roof covering change
Permit Reviews
Permit Number - TC-MDP-0324-00274
Permit Status: Issued
Permit Description: SFR MER1301460 T21-M0072 REV1 roof covering change
Start Date | Submittal | Complete Date | Status |
---|---|---|---|
09/12/2024 | BUILDING DEFERRED SUBMITTAL REVIEW v.1 | 09/16/2024 | APPROVED |
12/18/2024 | BUILDING DEFERRED SUBMITTAL REVIEW v.1 | 12/18/2024 | APPROVED |
04/01/2024 | SITE FROM MODEL PERMIT - PRODUCTION v.1 | 04/08/2024 | APPROVED |
Outstanding Activity Conditions
Permit Number - TC-MDP-0324-00274
Permit Status: Issued
Permit Description: SFR MER1301460 T21-M0072 REV1 roof covering change
Total Outstanding Activity Conditions - 1
Date | Name |
---|---|
12/18/2024 | Sewer condition must be accepted and released by Pima County prior to issuance of a Temporary Certificate of Occupancy. For More Information visit https://www.pima.gov/1076/Sewer-Connection-Permits, To check your permit status https://permits.pima.gov/ |
Conditions
Permit Number - TC-MDP-0324-00274
Permit Status: Issued
Permit Description: SFR MER1301460 T21-M0072 REV1 roof covering change
Date | Description | Comments |
---|---|---|
04/03/2024 | SPECIAL INSPECTION FOR CONCRETE INSTALLATION IS REQUIRED. | |
04/03/2024 | SPECIAL INSPECTION FOR EPOXY ANCHORS IS REQUIRED. | |
04/03/2024 | SPECIAL INSPECTION FOR POST TENSION SLAB IS REQUIRED. | |
04/03/2024 | Post-Tension Inspection Report is required. | |
03/05/2024 | Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. Contact sewer@pima.gov for review and assessment. | |
04/03/2024 | Truss/Joist Design plans must be submitted and approved prior to intermediate inspections if residential building or finaling the permit if commercial building. |
Completed Inspections
Permit Status: Issued
Permit Number: TC-MDP-0324-00274
Permit Description: SFR MER1301460 T21-M0072 REV1 roof covering change
Total Completed Inspections - 22
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
07/16/2024 | COT - RSPL - Sewer | Passed | ||
07/16/2024 | COT - RSPL - Yard Water Line | Passed | ||
07/17/2024 | COT - RSPL - Backwater Valve | Passed | ||
07/17/2024 | COT - RSPL - Rough Soil | Passed | ||
07/23/2024 | COT - RSBU - Excavation/Rebar/Zoning | Passed | ||
07/23/2024 | COT - RSBU - Preslab | Passed | ||
07/23/2024 | COT - RSEL - Electrical Underground | Passed | ||
07/23/2024 | COT - RSEL - Grounding/Bonding | Passed | ||
08/20/2024 | COT - RSBU - Exterior Clips/Sheathing | Passed | ||
08/22/2024 | COT - RSBU - Roof Nailing | Passed | ||
09/17/2024 | COT - RSPL - Gas Pressure Test | Passed | ||
09/19/2024 | BULD - Electrical Clearance | Passed | TEP ECO | |
09/19/2024 | COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. | Passed | ||
09/30/2024 | COT - RSBU - Interior Shear Bracing | Passed | Interior shear walls are properly secured to studs per plan requirements. Okay to proceed with tape, texture, and painting. | |
11/08/2024 | COT - BULD - SWG Clearance | Passed | SWG CLEARANCE ISSUED. | |
11/27/2024 | ENGR Engineering Final | Passed | ||
12/06/2024 | COT - RSEL - Electrical Final | Passed | 12/6/24 corrections were made | |
12/06/2024 | COT - RSEL - Outdoor Lighting | Passed | 12/6/24 corrections were made | |
12/06/2024 | COT - RSME - Mechanical Final | Passed | 12/6/24 corrections were made | |
12/06/2024 | COT - RSPL - Plumbing Final | Passed | 12/6/24 corrections were made | |
12/06/2024 | RSBU - Building Final | Passed | 12/6/24 corrections were made | |
12/06/2024 | RSBU - Building Progress | Passed |