Permit: TC-MDP-0324-00269
Permit Details
Apply Date:
03/05/2024
Applicant:
Charles Anderson
Description:
SALT Model Emery Park Place Duplex
Permit Reviews
Permit Number - TC-MDP-0324-00269
Permit Status: Complete
Permit Description: SALT Model Emery Park Place Duplex
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 04/03/2025 | BUILDING DEFERRED SUBMITTAL REVIEW v.2 | 04/07/2025 | APPROVED |
| 05/02/2024 | SITE FROM MODEL TEMPLATE - INFILL BUILDERS v.2 | 05/14/2024 | APPROVED |
| 06/12/2024 | BUILDING DEFERRED SUBMITTAL REVIEW v.1 | 06/12/2024 | APPROVED |
| 03/08/2024 | SITE FROM MODEL TEMPLATE - INFILL BUILDERS v.1 | 03/22/2024 | REQUIRES RESUBMIT |
| 05/14/2024 | RESTAMP - RESIDENTIAL v.1 | 05/15/2024 | APPROVED |
| 04/01/2025 | BUILDING DEFERRED SUBMITTAL REVIEW v.1 | 04/03/2025 | REQUIRES RESUBMIT |
Conditions
Permit Number - TC-MDP-0324-00269
Permit Status: Complete
Permit Description: SALT Model Emery Park Place Duplex
| Date | Description | Comments |
|---|---|---|
| 03/08/2024 | Please contact Pima County Addressing to resolve issue. Addressing@pima.gov or 520-724-9512 | |
| 03/05/2024 | Post-Tension Inspection Report is required. | |
| 03/05/2024 | Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. Contact sewer@pima.gov for review and assessment. | |
| 05/14/2024 | A Special Inspections Intermediate Certificate must be submitted and reviewed prior to issuance of this permit. | |
| 03/05/2024 | Truss/Joist Design plans must be submitted and approved prior to intermediate inspections if residential building or finaling the permit if commercial building. |
Outstanding Inspections
Permit Status: Complete
Permit Number: TC-MDP-0324-00269
Permite Description: SALT Model Emery Park Place Duplex
Total Outstanding Inspections - 10
| Last Inspection Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 08/12/2024 | COT - RSBU - Preslab | N/A | Re-inspection required | Add more adobes to support rebar throughout exterior footings. Provide min of 3" of clearance from earth all around. 8/12/2024 |
| 09/19/2024 | RSBU - Building Progress | N/A | Partial Pass | 1st lift at dwelling 140. rebar per plan. okay to grout. 9/19/2024 |
| 10/04/2024 | COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. | N/A | Canceled | 10/4/24: canceled per contractor |
| 10/04/2024 | COT - RSEL - Grounding/Bonding | N/A | Canceled | 10/4/24: canceled per contractor |
| 03/18/2025 | COT - BULD - SWG Clearance | N/A | Not Applicable | site does not use gas |
| 03/18/2025 | COT - RSPL - Gas Pressure Test | N/A | Not Applicable | site does not use gas |
| 03/18/2025 | COT - RSPL - Plumbing Final | N/A | Re-inspection required | All laundry room and garbage disposal should be GFCI protected, install washing machines and cooking appliances with anti tip device 3/18/25 |
| 03/18/2025 | COT - RSEL - Electrical Final | N/A | Re-inspection required | All laundry room and garbage disposal should be GFCI protected, install washing machines and cooking appliances with anti tip device 3/18/25 |
| 03/24/2025 | COT - RSME - Mechanical Final | N/A | Re-inspection required | All laundry room and garbage disposal should be GFCI protected, install washing machines and cooking appliances with anti tip device 3/18/25 24 March 25 Unit 1 is good to go; unit 2 still have the same issues as above. With the exception of anti-tip on Range. |
| 03/24/2025 | RSBU - Building Final | N/A | Re-inspection required | 24 March 25 Unit 1 is good to go; unit 2 still have the same issues as above. With the exception of anti-tip on Range. |
Completed Inspections
Permit Status: Complete
Permit Number: TC-MDP-0324-00269
Permit Description: SALT Model Emery Park Place Duplex
Total Completed Inspections - 18
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 08/01/2024 | COT - RSPL - Rough Soil | Passed | 8/1/24:Plumbing underground per plans ok to backfill. Shading required | |
| 08/13/2024 | COT - RSBU - Excavation/Rebar/Zoning | Passed | ||
| 08/13/2024 | COT - RSEL - Electrical Underground | Passed | ||
| 08/13/2024 | COT - RSBU - Preslab | Passed | ||
| 09/16/2024 | COT - RSBU - Exterior/Interior Clips/Sheathing/Framing | Passed | ||
| 09/16/2024 | COT - RSBU - Roof Nailing | Passed | ||
| 10/15/2024 | COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. | Passed | ||
| 11/01/2024 | COT - RSBU - Interior Shear Bracing | Passed | ||
| 12/17/2024 | BULD - Electrical Clearance | Passed | 12/17/24: ECO TEP CLEARANCE FOR 160 E DREXEL RD UNIT 1 AND UNIT 2. | |
| 12/17/2024 | COT - RSEL - Grounding/Bonding | Passed | ||
| 12/23/2024 | COT - RSPL - Yard Water Line | Passed | 12/23/24 pass OK to backfill, shading required. | |
| 12/23/2024 | COT - RSPL - Backwater Valve | Passed | 12/23/24 pass OK to backfill, shading required. | |
| 12/23/2024 | COT - RSPL - Sewer | Passed | 12/23/24 pass OK to backfill, shading required. | |
| 03/18/2025 | COT - RSEL - Outdoor Lighting | Passed | Passed 3/18/25 | |
| 03/24/2025 | COT - RSPL - Plumbing Final | Passed | ||
| 03/25/2025 | COT - RSEL - Electrical Final | Passed | 3-25-25, electrical final approved. | |
| 03/25/2025 | COT - RSME - Mechanical Final | Passed | 3-25-25, mechanical final approved. | |
| 04/02/2025 | ENGR Engineering Final | Passed | CO Ready |