Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.

Parcel: 138102050


Addresses:

160 E DREXEL RD


Inspection Status: Canceled

Inspection History: COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in.

Permit Number - TC-MDP-0324-00269

Inspection Description - COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in.

Inspection Status - Canceled

Date Description Inspector Results Comments
10/04/2024 COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. Canceled 10/4/24: canceled per contractor
COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. Re-inspection required 10/4/24: canceled per contractor
10/8/24: fire blocking required on west wall at garage, nail plates required at condensate drain at garage, all penetrations through top plate must be sealed, proper terminate dryer exhaust vent above trusses, dryer vent duct must be supported mid way running in wall, pex lines must be supported 32" on vertical runs, fire blocking required at soffit at kitchen, kitchen hood must terminate 6" below soffit and chase must be sealed, receptacle missing at kitchen island, seal sleeves at kitchen island, revision required for change in wire size in multiple locations, flex duct must be supported throughout, DWV not under test, shower/tub must be under test, shot pins required throughout at interior sill plates, pour back required at bath tub, leak at bathtub, drywall screws are not allowed to support fan fixtures (please use proper fasteners).
10/15/2024 COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. Passed