Permit: TC-MDP-0323-00692
Permit Details
Apply Date:
01/25/2024
Applicant:
Joshua Swinney
Description:
Black Mountain model SFR Escalara
Permit Reviews
Permit Number - TC-MDP-0323-00692
Permit Status: Complete
Permit Description: Black Mountain model SFR Escalara
Start Date | Submittal | Complete Date | Status |
---|---|---|---|
01/26/2024 | SITE FROM MODEL PERMIT - PRODUCTION v.1 | 01/30/2024 | REQUIRES RESUBMIT |
02/08/2024 | SITE FROM MODEL PERMIT - PRODUCTION v.2 | 02/15/2024 | APPROVED |
10/21/2024 | BUILDING DEFERRED SUBMITTAL REVIEW v.1 | 10/21/2024 | APPROVED |
Conditions
Permit Number - TC-MDP-0323-00692
Permit Status: Complete
Permit Description: Black Mountain model SFR Escalara
Date | Description | Comments |
---|---|---|
02/15/2024 | Contractor with active Arizona Contractor's License for specified scope of work required prior to issuance of permit. Contractor must have a TDC Online account and be added to the permit as a contact. | |
04/01/2024 | SPECIAL INSPECTION FOR POST TENSION SLAB IS REQUIRED. | |
04/01/2024 | Post-Installed Anchor Inspection Report is required. | |
01/20/2023 | Post-Tension Inspection Report is required. | |
04/01/2024 | Post-Tension Inspection Report is required. | |
12/12/2023 | Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. Contact sewer@pima.gov for review and assessment. | |
10/21/2024 | Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. For review and assessment: apply online at https://permits.pima.gov/ or contact us at sewer@pima.gov, (520) 724-9900. | |
12/12/2023 | Sewer condition must be accepted and released by Pima County prior to issuance of a Temporary Certificate of Occupancy. | |
10/21/2024 | Sewer condition must be accepted and released by Pima County prior to issuance of a Temporary Certificate of Occupancy. For More Information visit https://www.pima.gov/1076/Sewer-Connection-Permits, To check your permit status https://permits.pima.gov/ | |
04/01/2024 | SPECIAL INSPECTION FOR SITE PREPARATION IS REQUIRED. | |
01/20/2023 | Truss/Joist Design plans must be submitted and approved prior to intermediate inspections if residential building or finaling the permit if commercial building. | |
04/01/2024 | Truss/Joist Design plans must be submitted and approved prior to intermediate inspections if residential building or finaling the permit if commercial building. |
Outstanding Inspections
Permit Status: Complete
Permit Number: TC-MDP-0323-00692
Permite Description: Black Mountain model SFR Escalara
Total Outstanding Inspections - 10
Last Inspection Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
04/03/2024 | COT - RSPL - Rough Soil | N/A | Canceled | Cancelled per Tom McMaster due to wet and rainy day. |
04/02/2024 | COT - RSPL - Yard Water Line | N/A | Canceled | Cancelled per Tom McMaster due to wet and rainy day. |
07/12/2024 | COT - BULD - SWG Clearance | N/A | Not Applicable | No gas appliances in this subdivision. Clearance and gas pressure test not required. |
07/12/2024 | COT - RSPL - Gas Pressure Test | N/A | Not Applicable | No gas appliances in this subdivision. Clearance and gas pressure test not required. |
07/12/2024 | COT - RSPL - Gas Final | N/A | Not Applicable | No gas appliances in this subdivision. Clearance and gas pressure test not required. |
10/28/2024 | COT - RSEL - Electrical Final | N/A | Re-inspection required | 10/28/24: Hand rails at stairs missing, all exterior piping must be coated for UV protection, first floor lighting no power at multiple circuits, clearance around HVAC Condenser required 3". Caps at drive way clean out required, attic access required. |
10/28/2024 | COT - RSEL - Outdoor Lighting | N/A | Re-inspection required | 10/28/24: Hand rails at stairs missing, all exterior piping must be coated for UV protection, first floor lighting no power at multiple circuits, clearance around HVAC Condenser required 3". Caps at drive way clean out required, attic access required. |
10/28/2024 | COT - RSME - Mechanical Final | N/A | Re-inspection required | 10/28/24: Hand rails at stairs missing, all exterior piping must be coated for UV protection, first floor lighting no power at multiple circuits, clearance around HVAC Condenser required 3". Caps at drive way clean out required, attic access required. |
10/28/2024 | RSBU - Building Final | N/A | Re-inspection required | 10/28/24: Hand rails at stairs missing, all exterior piping must be coated for UV protection, first floor lighting no power at multiple circuits, clearance around HVAC Condenser required 3". Caps at drive way clean out required, attic access required. Dishwasher not installed. receptacle spacing at 2nd story bedrooms greater than 12’. |
10/28/2024 | COT - RSPL - Plumbing Final | N/A | Re-inspection required | 10/28/24: Hand rails at stairs missing, all exterior piping must be coated for UV protection, first floor lighting no power at multiple circuits, clearance around HVAC Condenser required 3". Caps at drive way clean out required, attic access required. Dishwasher not installed. |
Completed Inspections
Permit Status: Complete
Permit Number: TC-MDP-0323-00692
Permit Description: Black Mountain model SFR Escalara
Total Completed Inspections - 19
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
04/19/2024 | COT - RSBU - Excavation/Rebar/Zoning | Passed | Concrete forms are set, post tension cabling is in place, rebar reinforcement is installed per plans, UFER Ground is in place, shear wall hold downs are in place per plans, masa clips are properly installed, underground electrical for kitchen island is in place, and all underground plumbing pipes are properly wrapped with foam wrap. Okay to pour concrete for slab and footings. | |
04/19/2024 | COT - RSEL - Electrical Underground | Passed | Underground electrical complete for kitchen island. | |
04/19/2024 | COT - RSEL - Grounding/Bonding | Passed | Concrete forms are set, post tension cabling is in place, rebar reinforcement is installed per plans, UFER Ground is in place, shear wall hold downs are in place per plans, masa clips are properly installed, underground electrical for kitchen island is in place, and all underground plumbing pipes are properly wrapped with foam wrap. Okay to pour concrete for slab and footings. | |
04/19/2024 | COT - RSPL - Rough Soil | Passed | Passed 4-4-24 by Javier Acosta. | |
04/19/2024 | COT - RSPL - Yard Water Line | Passed | Water line is installed and under 60# of air pressure. Okay to shade pipe and backfill trench. | |
04/19/2024 | COT - RSBU - Preslab | Passed | Concrete forms are set, post tension cabling is in place, rebar reinforcement is installed per plans, UFER Ground is in place, shear wall hold downs are in place per plans, masa clips are properly installed, underground electrical for kitchen island is in place, and all underground plumbing pipes are properly wrapped with foam wrap. Okay to pour concrete for slab and footings. | |
05/15/2024 | COT - RSBU - Roof Nailing | Passed | ||
05/15/2024 | COT - RSBU - Exterior Clips/Sheathing | Passed | ||
07/12/2024 | COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. | Passed | Mechanical, electrical, and plumbing rough-in are complete. Okay to proceed with insulation and drywall installation. | |
07/23/2024 | COT - RSBU - Interior Shear Bracing | Passed | ||
08/30/2024 | COT - RSPL - Sewer | Passed | 8/30/24: Underground plumbing is connected to sewer with green tracer wire running from clean-out to sewer connection. Okay to shade pipe and backfill trench. | |
08/30/2024 | BULD - Electrical Clearance | Passed | ECO Clearance issued to TEP for 7434 S Keller Ln. Okay to energize panel. | |
09/17/2024 | RSBU - Building Progress | Passed | 9/17/24: 18 inches of copper top and bottom before sweat joint outside of wall main water line | |
10/28/2024 | ENGR Engineering Final | Passed | ||
10/31/2024 | COT - RSEL - Electrical Final | Passed | 10-31-24, building final approved. | |
10/31/2024 | COT - RSEL - Outdoor Lighting | Passed | 10-31-24, building final approved. | |
10/31/2024 | COT - RSME - Mechanical Final | Passed | 10-31-24, building final approved. | |
10/31/2024 | RSBU - Building Final | Passed | greater than 12' 10-31-24, building final approved. |
|
10/31/2024 | COT - RSPL - Plumbing Final | Passed | greater than 12' 10-31-24, building final approved. |