Permit: TC-MDP-0225-00109
Permit Details
Status:
Inspections Complete
Type:
Model Building Permit
Address:
5929 E JAYDEN LN
Address NEW:
5929 E JAYDEN LN
Apply Date:
02/05/2025
Applicant:
Candis Benson
Description:
New Residential Model Plan (Model master plan TC-MDP-1224-01413)
Permit Reviews
Permit Number - TC-MDP-0225-00109
Permit Status: Inspections complete
Permit Description: New Residential Model Plan (Model master plan TC-MDP-1224-01413)
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 03/21/2025 | SITE FROM MODEL PERMIT - SUBDIVISION v.1 | 04/01/2025 | APPROVED |
Outstanding Activity Conditions
Permit Number - TC-MDP-0225-00109
Permit Status: Inspections complete
Permit Description: New Residential Model Plan (Model master plan TC-MDP-1224-01413)
Total Outstanding Activity Conditions - 5
| Date | Name |
|---|---|
| 02/07/2025 | Sewer condition must be accepted and released by Pima County prior to issuance of a Temporary Certificate of Occupancy. For More Information visit https://www.pima.gov/1076/Sewer-Connection-Permits, To check your permit status https://permits.pima.gov/ |
| 03/25/2025 | SPECIAL INSPECTION FOR CONCRETE INSTALLATION IS REQUIRED. |
| 03/25/2025 | SPECIAL INSPECTION FOR EPOXY ANCHORS IS REQUIRED. |
| 03/25/2025 | SPECIAL INSPECTION FOR POST TENSION SLAB IS REQUIRED. |
| 03/25/2025 | SPECIAL INSPECTION FOR SITE PREPARATION IS REQUIRED. |
Conditions
Permit Number - TC-MDP-0225-00109
Permit Status: Inspections complete
Permit Description: New Residential Model Plan (Model master plan TC-MDP-1224-01413)
| Date | Description | Comments |
|---|---|---|
| 02/07/2025 | Contractor with active Arizona Contractor's License for specified scope of work, or a signed Owner Builder Affidavit https://www.tucsonaz.gov/files/sharedassets/public/v/1/pdsd/documents/permits/residential-permits/pdsd_owner_builder_affidavit_081623.pdf, is required prior to issuance of permit. Contractor or Owner must have a TDC Online account and be added to the permit as the correct contact type https://www.tucsonaz.gov/files/sharedassets/public/v/2/pdsd/documents/tdc-faq/new-pdfs/adding-additional-contacts.pdf. If you are providing an Owner Builder Affidavit, the owner MUST be attached as a contact on the permit. | |
| 02/07/2025 | Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. For review and assessment: apply online at https://permits.pima.gov/ or contact us at sewer@pima.gov, (520) 724-9900. | |
| 03/25/2025 | A Special Inspections Intermediate Certificate must be submitted and reviewed prior to issuance of this permit. | |
| 03/25/2025 | Truss/Joist Design plans must be submitted and approved prior to intermediate inspections if residential building or finaling the permit if commercial building. |
Completed Inspections
Permit Status: Inspections Complete
Permit Number: TC-MDP-0225-00109
Permit Description: New Residential Model Plan (Model master plan TC-MDP-1224-01413)
Total Completed Inspections - 21
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 04/29/2025 | COT - RSPL - Rough Soil | Passed | 4/29/25: Main water line and plumbing underground approved. Ok to proceed with backfill, shading required | |
| 04/29/2025 | COT - RSPL - Sewer | Passed | 4/29/25: Main water line and plumbing underground approved. Ok to proceed with backfill, shading required | |
| 04/29/2025 | COT - RSPL - Yard Water Line | Passed | 4/29/25: Main water line and plumbing underground approved. Ok to proceed with backfill, shading required | |
| 05/02/2025 | BULD - Electrical Clearance | Passed | 5/2/25: ECO TEP CLEARANCE FOR 5929 E JAYDEN LN | |
| 05/02/2025 | COT - RSBU - Excavation/Rebar/Zoning | Passed | 5/2/25: REINFORCEMENT PER PLAN OK TO PROCEED WITH CONCRETE PLACEMENT, ALL HOLD-DOWNS PRESENT AT TIME OF INSPECTION. | |
| 05/02/2025 | COT - RSBU - Preslab | Passed | 5/2/25: REINFORCEMENT PER PLAN OK TO PROCEED WITH CONCRETE PLACEMENT, ALL HOLD-DOWNS PRESENT AT TIME OF INSPECTION. | |
| 05/02/2025 | COT - RSEL - Electrical Underground | Passed | ||
| 05/13/2025 | COT - RSBU - Roof Nailing | Passed | ||
| 05/14/2025 | COT - RSBU - Exterior/Interior Clips/Sheathing/Framing | Passed | 5/14/25 Pass |
|
| 05/29/2025 | COT - RSEL - Grounding/Bonding | Passed | ||
| 05/29/2025 | COT - RSPL - Gas Pressure Test | Passed | ||
| 06/06/2025 | COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. | Passed | 6-6-25: intermediates approved. Interior shear bracing approved-okay for tape & texture. | |
| 06/06/2025 | COT - RSBU - Interior Shear Bracing | Passed | 6-6-25: intermediates approved. Interior shear bracing approved-okay for tape & texture. | |
| 07/15/2025 | COT - BULD - SWG Clearance | Passed | 7.14.25 | |
| 07/21/2025 | COT - RSEL - Electrical Final | Passed | 7-21-25: electrical final approved. | |
| 07/21/2025 | COT - RSEL - Outdoor Lighting | Passed | 7-21-25: outdoor lighting approved. | |
| 07/21/2025 | COT - RSME - Mechanical Final | Passed | 7-21-25: mechanical final approved. | |
| 07/21/2025 | ENGR Engineering Final | Passed | CO Ready | |
| 07/21/2025 | RSBU - Building Progress | Passed | ||
| 07/29/2025 | RSBU - Building Final | Passed | 7.28.25 Corrections made and verified |
|
| 07/29/2025 | COT - RSPL - Plumbing Final | Passed | 7.28.25 Corrections made and verified |