Inspection Status: Re-inspection required
Inspection History: COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in.
| Date |
Description |
Inspector |
Results |
Comments |
| 05/29/2025 |
COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. |
|
Re-inspection required |
5/29/25: wiring not per approved plans (only 19 circuits installed), DVW not under test, leak at bathtub at shared bathroom, seal top plate penetration at kitchen wall west, fan fixtures shall be properly secured with approved fasteners, attic access does is not code complaint and does not meet the requirements of M1305.1.2Appliances in attics (Attics containing appliances shall be provided with an opening and a clear and unobstructed passageway) |
| 05/30/2025 |
COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. |
|
Partial Pass |
5-30-25: partial pass-the only item needing correction is the clear and unobstructed passageway requirements outlined in the 2018 IRC Section M-1305.1.2. Okay to proceed with construction at own risk and mentioned above item will be checked at building final. |
| 06/06/2025 |
COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. |
|
Passed |
6-6-25: intermediates approved. Interior shear bracing approved-okay for tape & texture. |