Inspection History Details
Inspection Status: Re-inspection required
Inspection History: RSBU - Building Final
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 05/30/2025 | RSBU - Building Final | Re-inspection required | 5-30-25: partial pass-the only item needing correction is the clear and unobstructed passageway requirements outlined in the 2018 IRC Section M-1305.1.2. Okay to proceed with construction at own risk and mentioned above item will be checked at building final. | |
| 07/21/2025 | RSBU - Building Final | Re-inspection required | 7-21-25: missing tempered glass in bathroom shower, paint all exterior plastic, and provide a 3" clearance around condenser pad. | |
| 07/29/2025 | RSBU - Building Final | Passed | 7.28.25 Corrections made and verified |