Permit: TC-MDP-0225-00100
Permit Details
Status:
Inspections Complete
Type:
Model Building Permit
Address:
9571 E WYNALDA DR
Address NEW:
9571 E WYNALDA DR
Apply Date:
04/03/2025
Applicant:
Celina Rodriguez
Description:
Mirador Point 1909 Plan (Model master plan TC-MDP-0125-00034)
Permit Reviews
Permit Number - TC-MDP-0225-00100
Permit Status: Inspections complete
Permit Description: Mirador Point 1909 Plan (Model master plan TC-MDP-0125-00034)
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 04/03/2025 | SITE FROM MODEL PERMIT - PRODUCTION v.1 | 04/14/2025 | REQUIRES RESUBMIT |
| 05/06/2025 | RESTAMP - RESIDENTIAL v.1 | 05/09/2025 | APPROVED |
| 04/17/2025 | SITE FROM MODEL PERMIT - PRODUCTION v.2 | 04/24/2025 | REQUIRES RESUBMIT |
| 05/02/2025 | SITE FROM MODEL PERMIT - PRODUCTION v.3 | 05/06/2025 | APPROVED |
Outstanding Activity Conditions
Permit Number - TC-MDP-0225-00100
Permit Status: Inspections complete
Permit Description: Mirador Point 1909 Plan (Model master plan TC-MDP-0125-00034)
Total Outstanding Activity Conditions - 4
| Date | Name |
|---|---|
| 04/11/2025 | SPECIAL INSPECTION FOR CONCRETE INSTALLATION IS REQUIRED. |
| 04/11/2025 | Post-Installed Anchor Inspection Report is required. |
| 04/11/2025 | Post-Tension Inspection Report is required. |
| 04/11/2025 | Soil Compaction Special Inspection is Required. |
Conditions
Permit Number - TC-MDP-0225-00100
Permit Status: Inspections complete
Permit Description: Mirador Point 1909 Plan (Model master plan TC-MDP-0125-00034)
| Date | Description | Comments |
|---|---|---|
| 02/07/2025 | Contractor with active Arizona Contractor's License for specified scope of work, or a signed Owner Builder Affidavit https://www.tucsonaz.gov/files/sharedassets/public/v/1/pdsd/documents/permits/residential-permits/pdsd_owner_builder_affidavit_081623.pdf, is required prior to issuance of permit. Contractor or Owner must have a TDC Online account and be added to the permit as the correct contact type https://www.tucsonaz.gov/files/sharedassets/public/v/2/pdsd/documents/tdc-faq/new-pdfs/adding-additional-contacts.pdf. If you are providing an Owner Builder Affidavit, the owner MUST be attached as a contact on the permit. | |
| 02/07/2025 | Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. For review and assessment: apply online at https://permits.pima.gov/ or contact us at sewer@pima.gov, (520) 724-9900. | |
| 04/11/2025 | Truss/Joist Design plans must be submitted and approved prior to intermediate inspections if residential building or finaling the permit if commercial building. |
Outstanding Inspections
Permit Status: Inspections Complete
Permit Number: TC-MDP-0225-00100
Permite Description: Mirador Point 1909 Plan (Model master plan TC-MDP-0125-00034)
Total Outstanding Inspections - 2
| Last Inspection Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 05/14/2025 | COT - BULD - SWG Clearance | N/A | Not Applicable | No gas service on site. |
| 05/14/2025 | COT - RSPL - Gas Pressure Test | N/A | Not Applicable | No gas service on site. |
Completed Inspections
Permit Status: Inspections Complete
Permit Number: TC-MDP-0225-00100
Permit Description: Mirador Point 1909 Plan (Model master plan TC-MDP-0125-00034)
Total Completed Inspections - 20
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 05/14/2025 | COT - RSPL - Backwater Valve | Passed | ||
| 05/14/2025 | COT - RSPL - Rough Soil | Passed | ||
| 05/14/2025 | COT - RSPL - Sewer | Passed | ||
| 05/29/2025 | COT - RSEL - Electrical Underground | Passed | 5-29-25, electrical underground approved. | |
| 06/03/2025 | COT - RSBU - Excavation/Rebar/Zoning | Passed | 6-3-25: excavation/rebar and setbacks verified per plans. Okay to pour concrete. | |
| 06/03/2025 | COT - RSBU - Preslab | Passed | 6-3-25: preslab, excavation /rebar and setbacks verified per plans. Okay to pour concrete. | |
| 06/30/2025 | COT - RSBU - Exterior/Interior Clips/Sheathing/Framing | Passed | 6/30/25 corrections made | |
| 06/30/2025 | COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. | Passed | Passed 6/30/25 | |
| 06/30/2025 | COT - RSBU - Roof Nailing | Passed | 6/30/25 corrections made | |
| 06/30/2025 | COT - RSEL - Grounding/Bonding | Passed | 6/30/25 passed | |
| 07/14/2025 | COT - RSBU - Interior Shear Bracing | Passed | 7.14.21 fastener spacing and penetration still not per plan/code | |
| 07/17/2025 | BULD - Electrical Clearance | Passed | Passed 7/17/25 CLEARANCE ECO | |
| 09/09/2025 | RSBU - Building Progress | Passed | ||
| 09/09/2025 | ENGR Engineering Final | Passed | Site is safe and complete in accordance with approved plans. | |
| 09/11/2025 | COT - RSEL - Electrical Final | Passed | 9.11.25 APPROVED |
|
| 09/11/2025 | COT - RSEL - Outdoor Lighting | Passed | 9.11.25 APPROVED |
|
| 09/11/2025 | COT - RSME - Mechanical Final | Passed | 9.11.25 APPROVED |
|
| 09/11/2025 | COT - RSPL - Plumbing Final | Passed | 9.11.25 APPROVED |
|
| 09/11/2025 | RSBU - Building Final | Passed | 9.11.25 APPROVED |
|
| 09/11/2025 | COT - RSPL - Yard Water Line | Passed | 9.11.25 APPROVED |