Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Inspection History Details
Inspection Status: Re-inspection required
Inspection History: COT - RSBU - Interior Shear Bracing
Permit Number - TC-MDP-0225-00100
Inspection Description - COT - RSBU - Interior Shear Bracing
Inspection Status - Re-inspection required
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 07/11/2025 | COT - RSBU - Interior Shear Bracing | Re-inspection required | 7/11/25: fasteners shall be no closer than 3/8" from edge of panel and shall penetrate no more than 1/8". Fasteners not spaced per plan throughout. Master bath incomplete. | |
| 07/14/2025 | COT - RSBU - Interior Shear Bracing | Passed | 7.14.21 fastener spacing and penetration still not per plan/code |