Permit: TC-MDP-0225-00091
Permit Details
Status:
Inspections Complete
Type:
Model Building Permit
Address:
9585 E WYNALDA DR
Address NEW:
9585 E WYNALDA DR
Apply Date:
02/04/2025
Applicant:
Celina Rodriguez
Description:
Mirador Point 1584 Plan (Model master plan TC-MDP-0125-00031)
Permit Reviews
Permit Number - TC-MDP-0225-00091
Permit Status: Inspections complete
Permit Description: Mirador Point 1584 Plan (Model master plan TC-MDP-0125-00031)
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 04/15/2025 | SITE FROM MODEL PERMIT - PRODUCTION v.1 | 04/22/2025 | APPROVED |
Outstanding Activity Conditions
Permit Number - TC-MDP-0225-00091
Permit Status: Inspections complete
Permit Description: Mirador Point 1584 Plan (Model master plan TC-MDP-0125-00031)
Total Outstanding Activity Conditions - 1
| Date | Name |
|---|---|
| 02/07/2025 | Sewer condition must be accepted and released by Pima County prior to issuance of a Temporary Certificate of Occupancy. For More Information visit https://www.pima.gov/1076/Sewer-Connection-Permits, To check your permit status https://permits.pima.gov/ |
Conditions
Permit Number - TC-MDP-0225-00091
Permit Status: Inspections complete
Permit Description: Mirador Point 1584 Plan (Model master plan TC-MDP-0125-00031)
| Date | Description | Comments |
|---|---|---|
| 02/07/2025 | Contractor with active Arizona Contractor's License for specified scope of work, or a signed Owner Builder Affidavit https://www.tucsonaz.gov/files/sharedassets/public/v/1/pdsd/documents/permits/residential-permits/pdsd_owner_builder_affidavit_081623.pdf, is required prior to issuance of permit. Contractor or Owner must have a TDC Online account and be added to the permit as the correct contact type https://www.tucsonaz.gov/files/sharedassets/public/v/2/pdsd/documents/tdc-faq/new-pdfs/adding-additional-contacts.pdf. If you are providing an Owner Builder Affidavit, the owner MUST be attached as a contact on the permit. | |
| 02/07/2025 | Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. For review and assessment: apply online at https://permits.pima.gov/ or contact us at sewer@pima.gov, (520) 724-9900. |
Outstanding Inspections
Permit Status: Inspections Complete
Permit Number: TC-MDP-0225-00091
Permite Description: Mirador Point 1584 Plan (Model master plan TC-MDP-0125-00031)
Total Outstanding Inspections - 5
| Last Inspection Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 04/29/2025 | COT - BULD - SWG Clearance | N/A | Not Applicable | |
| 04/29/2025 | COT - RSPL - Gas Pressure Test | N/A | Not Applicable | |
| 05/29/2025 | COT - RSBU - Roof Nailing | N/A | Re-inspection required | 5-29-25, roof has already been loaded, therefore, provide a letter to the city for review/approval indicating that roof nailing was done per approved plans and meets standards set forth by the 2018 IRC. |
| 05/29/2025 | COT - RSBU - Exterior/Interior Clips/Sheathing/Framing | N/A | Re-inspection required | 5-29-25: missing nut on anchor bolt at garage entry and plans call for HUC26-2 hangers at garage. |
| 08/06/2025 | ENGR Engineering Final | N/A | Not Ready | Water meter needs to be removed from hydrant in front yard. Sewer clean outs need to be trimmed down so they are within a couple inches above Dg and collars installed and glued for caps. Collar next to driveway is loose. |
Completed Inspections
Permit Status: Inspections Complete
Permit Number: TC-MDP-0225-00091
Permit Description: Mirador Point 1584 Plan (Model master plan TC-MDP-0125-00031)
Total Completed Inspections - 18
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 04/29/2025 | COT - RSPL - Rough Soil | Passed | 4/29/25: PLUMBING AND WATERLINE PER APPROVED PLANS OK TO BACKFILL. SHADING REQUIRED | |
| 04/29/2025 | COT - RSPL - Sewer | Passed | 4/29/25: PLUMBING AND WATERLINE PER APPROVED PLANS OK TO BACKFILL. SHADING REQUIRED | |
| 04/29/2025 | COT - RSPL - Yard Water Line | Passed | 4/29/25: PLUMBING AND WATERLINE PER APPROVED PLANS OK TO BACKFILL. SHADING REQUIRED | |
| 05/07/2025 | COT - RSBU - Excavation/Rebar/Zoning | Passed | Passed 5/7/25 ok to pour concrete | |
| 05/07/2025 | COT - RSBU - Preslab | Passed | Passed 5/7/25 ok to pour concrete | |
| 05/07/2025 | COT - RSEL - Electrical Underground | Passed | Passed 5/7/25 ok to pour concrete | |
| 05/30/2025 | COT - RSBU - Exterior/Interior Clips/Sheathing/Framing | Passed | 5-30-25, exterior clips/sheathing approved. | |
| 06/09/2025 | BULD - Electrical Clearance | Passed | Ready for temp power clearance ECO | |
| 06/09/2025 | COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. | Passed | Passed 6/9/25 | |
| 06/09/2025 | COT - RSEL - Grounding/Bonding | Passed | Ready for temp power clearance ECO | |
| 06/20/2025 | COT - RSBU - Interior Shear Bracing | Passed | Shear walls and nailing per schedule 6/20/25 | |
| 08/06/2025 | RSBU - Building Progress | Passed | ||
| 08/11/2025 | COT - RSEL - Outdoor Lighting | Passed | ||
| 08/14/2025 | COT - RSEL - Electrical Final | Passed | 8/14/25 corrections made | |
| 08/14/2025 | COT - RSME - Mechanical Final | Passed | 8/14/25 corrections made | |
| 08/14/2025 | COT - RSPL - Plumbing Final | Passed | 8/14/25 corrections made | |
| 08/14/2025 | RSBU - Building Final | Passed | 8/14/25 corrections made | |
| 08/18/2025 | ENGR Engineering Final | Passed |