Inspection History Details
Inspection Status: Re-inspection required
Inspection History: COT - RSBU - Roof Nailing
Permit Number - TC-MDP-0225-00091
Inspection Description - COT - RSBU - Roof Nailing
Inspection Status - Re-inspection required
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 05/20/2025 | COT - RSBU - Roof Nailing | Re-inspection required | 5-20-25, masa clips not nailed throughout, over penetrated nails along shear walll sheathing on west side-nails shall not over penetrated more than 1/16". Nail all nails at garage shear wall flush. Missing shot pins throughout-shot pin required within 6" of end of each plate and a minimum of 2 are required per plate. Clarification needed on RSP4 spacing-the east side has them installed every other stud while the west side has them installed every other 3rd stud. Missing 3x3 washer plate at SW11. Anchor bolts for SW11 are required at 23" o.c. STOPPED INSPECTION-ADDITIONAL ITEMS MAY BE NOTED. | |
| COT - RSBU - Roof Nailing | Re-inspection required | 5-29-25, roof has already been loaded, therefore, provide a letter to the city for review/approval indicating that roof nailing was done per approved plans and meets standards set forth by the 2018 IRC. | ||
| 05/30/2025 | COT - RSBU - Roof Nailing | Passed | 5-30-25, roof nailing approved. |