Permit Details

Status:
Inspections Complete
Type:
Model Building Permit
Address:
9512 E MEOLA DR
Address NEW:
9512 E MEOLA DR
Apply Date:
02/04/2025
Applicant:
Celina Rodriguez
Description:
Mirador Point 1512 Plan (Model master plan TC-MDP-0125-00030)

Permit Reviews

Permit Number - TC-MDP-0225-00086
Permit Status: Inspections complete
Permit Description: Mirador Point 1512 Plan (Model master plan TC-MDP-0125-00030)
Start Date Submittal Complete Date Status  
02/27/2025 SITE FROM MODEL PERMIT - PRODUCTION v.1 03/11/2025 APPROVED Review Details

Outstanding Activity Conditions

Permit Number - TC-MDP-0225-00086
Permit Status: Inspections complete
Permit Description: Mirador Point 1512 Plan (Model master plan TC-MDP-0125-00030)
Total Outstanding Activity Conditions - 6
Date Name
02/07/2025 Sewer condition must be accepted and released by Pima County prior to issuance of a Temporary Certificate of Occupancy. For More Information visit https://www.pima.gov/1076/Sewer-Connection-Permits, To check your permit status https://permits.pima.gov/
03/05/2025 SPECIAL INSPECTION FOR CONCRETE INSTALLATION IS REQUIRED.
03/05/2025 SPECIAL INSPECTION FOR POST TENSION SLAB IS REQUIRED.
03/05/2025 Post-Installed Anchor Inspection Report is required.
03/05/2025 Post-Tension Inspection Report is required.
03/05/2025 Soil Compaction Special Inspection is Required.

Conditions

Permit Number - TC-MDP-0225-00086
Permit Status: Inspections complete
Permit Description: Mirador Point 1512 Plan (Model master plan TC-MDP-0125-00030)
Date Description Comments
02/07/2025 Contractor with active Arizona Contractor's License for specified scope of work, or a signed Owner Builder Affidavit https://www.tucsonaz.gov/files/sharedassets/public/v/1/pdsd/documents/permits/residential-permits/pdsd_owner_builder_affidavit_081623.pdf, is required prior to issuance of permit. Contractor or Owner must have a TDC Online account and be added to the permit as the correct contact type https://www.tucsonaz.gov/files/sharedassets/public/v/2/pdsd/documents/tdc-faq/new-pdfs/adding-additional-contacts.pdf. If you are providing an Owner Builder Affidavit, the owner MUST be attached as a contact on the permit.
02/07/2025 Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. For review and assessment: apply online at https://permits.pima.gov/ or contact us at sewer@pima.gov, (520) 724-9900.

Outstanding Inspections

Permit Status: Inspections Complete
Permit Number: TC-MDP-0225-00086
Permite Description: Mirador Point 1512 Plan (Model master plan TC-MDP-0125-00030)
Total Outstanding Inspections - 6
Last Inspection Date Description Inspector Results Comments
04/25/2025 COT - BULD - SWG Clearance N/A Not Applicable 4-25-25, not applicable
03/20/2025 COT - RSEL - Grounding/Bonding N/A Partial Pass 3-20-25, partial pass for ufer only.
04/25/2025 COT - RSPL - Gas Pressure Test N/A Not Applicable 4-25-25, not applicable
07/31/2025 COT - RSEL - Electrical Final N/A Re-inspection required Missing receptacle in bedroom behind door near closet wall. Super has been notified. 7/31/2025
07/31/2025 RSBU - Building Final N/A Re-inspection required Missing receptacle in bedroom behind door near closet wall. Super has been notified. 7/31/2025
08/20/2025 ENGR Engineering Final N/A Failed 8/20/25
Still no glued collar or cap under cover in driveway.
See Picture attached.
Second time this has failed for the same reason. Reinspection Fee required. Pay invoice prior to scheduling Engineering Final again.

Completed Inspections

Permit Status: Inspections Complete
Permit Number: TC-MDP-0225-00086
Permit Description: Mirador Point 1512 Plan (Model master plan TC-MDP-0125-00030)
Total Completed Inspections - 19
Date Description Inspector Results Comments
03/14/2025 COT - RSPL - Rough Soil Passed 14 March 25
Ok to backfill, shading required.
03/14/2025 COT - RSPL - Sewer Passed 14 March 25
Ok to backfill, shading required.
03/14/2025 COT - RSPL - Yard Water Line Passed
03/20/2025 COT - RSBU - Preslab Passed 3-20-25, reinforcement/setbacks, electrical underground, and preslab verified per approved plans. Okay to pour concrete.
03/20/2025 COT - RSBU - Excavation/Rebar/Zoning Passed 3-20-25, reinforcement/setbacks, electrical underground, and preslab verified per approved plans. Okay to pour concrete.
03/20/2025 COT - RSEL - Electrical Underground Passed 3-20-25, reinforcement/setbacks, electrical underground, and preslab verified per approved plans. Okay to pour concrete.
04/01/2025 BULD - Electrical Clearance Passed 1 April 25
TEP ELECTRICAL CLEARANCE: ECO
04/17/2025 COT - RSBU - Exterior/Interior Clips/Sheathing/Framing Passed
04/17/2025 COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. Passed
04/17/2025 COT - RSBU - Roof Nailing Passed 17 April 25
Pass.
04/25/2025 COT - RSBU - Interior Shear Bracing Passed 4-25-25, interior shear wall approved. Okay to tape & texture drywall.
04/25/2025 COT - RSEL - Grounding/Bonding Passed 4-25-25, grounding/bonding approved.
07/29/2025 RSBU - Building Progress Passed
07/30/2025 COT - RSEL - Outdoor Lighting Passed Approved. All corrections were made. 7/30/2025
07/30/2025 COT - RSME - Mechanical Final Passed Approved. All corrections were made. 7/30/2025
07/30/2025 COT - RSPL - Plumbing Final Passed Approved. All corrections were made. 7/30/2025
08/20/2025 COT - RSEL - Electrical Final Passed 8.20.25
Approved
08/20/2025 RSBU - Building Final Passed 8.20.25
Approved
08/22/2025 ENGR Engineering Final Passed

Documents

File Name Document Type  
COFT - PDSD - PERMIT CARD.PDF DOCUMENTS VIEW
MIRADOR POINT - LOT 125 START_V1.PDF DOCUMENTS VIEW
MP 125 SIC-2025-02-25_V1.PDF DOCUMENTS VIEW