Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.

Permit Details

Status:
Issued
Type:
Model Building Permit
Address:
9659 E HARKES DR
Apply Date:
02/08/2024
Applicant:
Joshua Swinney
Description:
Black Mountain model SFR Escalara

Permit Reviews

Permit Number - TC-MDP-0224-00199
Permit Status: Issued
Permit Description: Black Mountain model SFR Escalara
Start Date Submittal Complete Date Status  
04/25/2024 SITE FROM MODEL PERMIT - PRODUCTION v.1 04/30/2024 APPROVED Review Details

Outstanding Activity Conditions

Permit Number - TC-MDP-0224-00199
Permit Status: Issued
Permit Description: Black Mountain model SFR Escalara
Total Outstanding Activity Conditions - 4
Date Name
01/20/2023 Post-Tension Inspection Report is required.
02/08/2024 Sewer condition must be accepted and released by Pima County prior to issuance of a Temporary Certificate of Occupancy.
04/26/2024 Post-Installed Anchor Inspection Report is required.
04/26/2024 SPECIAL INSPECTION FOR SITE PREPARATION IS REQUIRED.

Conditions

Permit Number - TC-MDP-0224-00199
Permit Status: Issued
Permit Description: Black Mountain model SFR Escalara
Date Description Comments
04/30/2024 Contractor with active Arizona Contractor's License for specified scope of work, or a signed Owner Builder Affidavit https://www.tucsonaz.gov/files/sharedassets/public/v/1/pdsd/documents/permits/residential-permits/pdsd_owner_builder_affidavit_081623.pdf, is required prior to issuance of permit. Contractor or Owner must have a TDC Online account and be added to the permit as the correct contact type https://www.tucsonaz.gov/files/sharedassets/public/v/2/pdsd/documents/tdc-faq/new-pdfs/adding-additional-contacts.pdf. If you are providing an Owner Builder Affidavit, the owner MUST be attached as a contact on the permit.
02/08/2024 Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. Contact sewer@pima.gov for review and assessment.
01/20/2023 Truss/Joist Design plans must be submitted and approved prior to intermediate inspections if residential building or finaling the permit if commercial building.

Outstanding Inspections

Permit Status: Issued
Permit Number: TC-MDP-0224-00199
Permite Description: Black Mountain model SFR Escalara
Total Outstanding Inspections - 1
Last Inspection Date Description Inspector Results Comments
08/06/2024 COT - RSBU - Exterior Clips/Sheathing N/A Not Applicable 8/6/24: no plans

Completed Inspections

Permit Status: Issued
Permit Number: TC-MDP-0224-00199
Permit Description: Black Mountain model SFR Escalara
Total Completed Inspections - 11
Date Description Inspector Results Comments
06/07/2024 COT - RSPL - Rough Soil Passed
06/07/2024 COT - RSPL - Yard Water Line Passed
06/17/2024 COT - RSBU - Excavation/Rebar/Zoning Passed Concrete forms are set, post tension cabling is evenly spaced, rebar reinforcement is properly installed per plan, Ufer ground is installed, underground plumbing is properly wrapped for protection, and underground electrical for kitchen island is installed. Okay to proceed with concrete pour.
06/17/2024 COT - RSBU - Preslab Passed Concrete forms are set, post tension cabling is evenly spaced, rebar reinforcement is properly installed per plan, Ufer ground is installed, underground plumbing is properly wrapped for protection, and underground electrical for kitchen island is installed. Okay to proceed with concrete pour.
06/17/2024 COT - RSEL - Electrical Underground Passed Concrete forms are set, post tension cabling is evenly spaced, rebar reinforcement is properly installed per plan, Ufer ground is installed, underground plumbing is properly wrapped for protection, and underground electrical for kitchen island is installed. Okay to proceed with concrete pour.
06/17/2024 COT - RSEL - Grounding/Bonding Passed Concrete forms are set, post tension cabling is evenly spaced, rebar reinforcement is properly installed per plan, Ufer ground is installed, underground plumbing is properly wrapped for protection, and underground electrical for kitchen island is installed. Okay to proceed with concrete pour.
08/07/2024 COT - RSBU - Exterior Clips/Sheathing Passed Exterior and interior walls are properly secured to concrete floor with j-bolts, titan bolts, shot pins, or masa clips. Shear wall plywood sheathing is properly installed and secured to studs with nails per plan requirements. Okay to proceed with rough-in of mechanical, electrical, and plumbing work.
08/07/2024 COT - RSBU - Roof Nailing Passed 8/7/24: Simpson 2x4 Hangers have been installed on GLB. 2X6 studs have been installed in pantry wall for 2nd floor landing support. Shear wall at pantry sheathing has been properly secured to studs. CS16 straps have been installed on south shear wall. Bottom plate of interior and exterior walls of 2nd floor have been nailed to wood floor decking between every stud at least three or four nails in plate. Okay to proceed with rough-in of mechanical, electrical, and plumbing.
09/20/2024 COT - RSPL - Sewer Passed
10/14/2024 COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. Passed
11/12/2024 COT - RSBU - Interior Shear Bracing Passed 11-12-24, interior shear wall approved. Okay to tape and texture drywall.

Documents

File Name Document Type  
COFT - PDSD - PERMIT CARD.PDF DOCUMENTS VIEW
PHASE 1 LOT 59 PLOT PLAN_V1.PDF DOCUMENTS VIEW
PHASE 1A LOT 59 SIC-2024-04-22_V1.PDF DOCUMENTS VIEW