Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.

Permit Details

Status:
Complete
Type:
Model Building Permit
Apply Date:
02/06/2024
Applicant:
Description:
SFR MER1301600 T21-M0073 REV1 roof covering change

Permit Reviews

Permit Number - TC-MDP-0224-00189
Permit Status: Complete
Permit Description: SFR MER1301600 T21-M0073 REV1 roof covering change
Start Date Submittal Complete Date Status  
09/26/2024 BUILDING DEFERRED SUBMITTAL REVIEW v.1 09/26/2024 APPROVED Review Details
07/10/2024 BUILDING DEFERRED SUBMITTAL REVIEW v.1 07/12/2024 APPROVED Review Details
02/08/2024 SITE FROM MODEL PERMIT - PRODUCTION v.1 02/15/2024 APPROVED Review Details

Conditions

Permit Number - TC-MDP-0224-00189
Permit Status: Complete
Permit Description: SFR MER1301600 T21-M0073 REV1 roof covering change
Date Description Comments
02/08/2024 SPECIAL INSPECTION FOR CONCRETE INSTALLATION IS REQUIRED.
02/08/2024 SPECIAL INSPECTION FOR EPOXY ANCHORS IS REQUIRED.
02/08/2024 SPECIAL INSPECTION FOR POST TENSION SLAB IS REQUIRED.
02/15/2024 Post-Tension Inspection Report is required.
02/06/2024 Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. Contact sewer@pima.gov for review and assessment.
02/12/2024 Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. Contact sewer@pima.gov for review and assessment.
02/06/2024 Sewer condition must be accepted and released by Pima County prior to issuance of a Temporary Certificate of Occupancy.
02/12/2024 Sewer condition must be accepted and released by Pima County prior to issuance of a Temporary Certificate of Occupancy.
07/12/2024 SPECIAL INSPECTION FOR SPECIAL GRADING, EXCAVATION AND FILLING IS REQUIRED.
02/15/2024 Truss/Joist Design plans must be submitted and approved prior to intermediate inspections if residential building or finaling the permit if commercial building.

Outstanding Inspections

Permit Status: Complete
Permit Number: TC-MDP-0224-00189
Permite Description: SFR MER1301600 T21-M0073 REV1 roof covering change
Total Outstanding Inspections - 1
Last Inspection Date Description Inspector Results Comments
07/12/2024 RSBU - Building Progress N/A Not Applicable

Completed Inspections

Permit Status: Complete
Permit Number: TC-MDP-0224-00189
Permit Description: SFR MER1301600 T21-M0073 REV1 roof covering change
Total Completed Inspections - 21
Date Description Inspector Results Comments
05/10/2024 COT - RSPL - Yard Water Line Passed
05/10/2024 COT - RSPL - Rough Soil Passed
05/17/2024 COT - RSPL - Backwater Valve Passed Backwater valve is installed between the clean outs and is under a water test with no leaks. Okay to shade pipes and backfill trench.
05/17/2024 COT - RSPL - Sewer Passed Sewer line is connected to clean outs, backwater valve, and underground plumbing. Complete system is under a water test with no leaks. Okay to shade pipes and backfill trenches.
05/31/2024 COT - RSBU - Preslab Passed Concrete forms are set, post tension cabling is properly placed, shear wall hold downs and masa clips are secured to the form per the plan, subsoil is properly compacted, underground electrical for kitchen island is installed, all plumbing pipes are properly wrapped for protection, and ground wire and rods are properly installed in bottom of footer. Okay to proceed with concrete pour.
05/31/2024 COT - RSEL - Grounding/Bonding Passed Concrete forms are set, post tension cabling is properly placed, shear wall hold downs and masa clips are secured to the form per the plan, subsoil is properly compacted, underground electrical for kitchen island is installed, all plumbing pipes are properly wrapped for protection, and Ufer ground rebar is properly installed in bottom of footer. Okay to proceed with concrete pour.
05/31/2024 COT - RSEL - Electrical Underground Passed Concrete forms are set, post tension cabling is properly placed, shear wall hold downs and masa clips are secured to the form per the plan, subsoil is properly compacted, underground electrical for kitchen island is installed, all plumbing pipes are properly wrapped for protection, and Ufer ground rebar is properly installed in bottom of footer. Okay to proceed with concrete pour.
05/31/2024 COT - RSBU - Excavation/Rebar/Zoning Passed Concrete forms are set, post tension cabling is properly placed, shear wall hold downs and masa clips are secured to the form per the plan, subsoil is properly compacted, underground electrical for kitchen island is installed, all plumbing pipes are properly wrapped for protection, and Ufer ground rebar is properly installed in bottom of footer. Okay to proceed with concrete pour.
06/14/2024 COT - RSBU - Roof Nailing Passed Roof trusses are properly secured to top plate with nails and H2.5 clips. Plywood sheathing is properly secured to roof trusses per plans and code. Okay to proceed with plumbing top out.
06/14/2024 COT - RSBU - Exterior Clips/Sheathing Passed Plywood sheathing for exterior shear walls is properly nailed per plan requirements. All bottom plates are secured to the concrete floor with cut nails, shot pins, poured in j-bolts, or titanium bolts. All shear wall hold downs are properly secured with nails to the studs. Okay to proceed with rough-in of mechanical, electrical, and plumbing work.
07/12/2024 BULD - Electrical Clearance Passed
07/12/2024 COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. Passed
07/12/2024 COT - RSPL - Gas Pressure Test Passed
08/01/2024 COT - RSBU - Interior Shear Bracing Passed
09/06/2024 COT - BULD - SWG Clearance Passed Gas valves are installed at all gas appliance locations. SWG Clearance issued.
09/18/2024 COT - RSEL - Electrical Final Passed
09/18/2024 COT - RSEL - Outdoor Lighting Passed
09/18/2024 COT - RSME - Mechanical Final Passed
09/18/2024 COT - RSPL - Plumbing Final Passed
09/18/2024 ENGR Engineering Final Passed
09/18/2024 RSBU - Building Final Passed

Documents

File Name Document Type  
COFO_FINALCOFO_RESIDENTIAL.PDF DOCUMENTS VIEW
147953 PT LOT 186 COMPLETE-2024-07-10_V1.PDF DOCUMENTS VIEW
COFT - PDSD - PERMIT CARD.PDF DOCUMENTS VIEW
LOT 186 APPLICATION_V1.PDF DOCUMENTS VIEW
LOT 186 PLOT PLAN_V1.PDF DOCUMENTS VIEW
LOT 186 SPECIAL INSPECTION CERTIFICATE-2024-02-08_V1.PDF DOCUMENTS VIEW