Permit: TC-MDP-0224-00189
Permit Details
Apply Date:
02/06/2024
Applicant:
Daria Hopkins
Description:
SFR MER1301600 T21-M0073 REV1 roof covering change
Permit Reviews
Permit Number - TC-MDP-0224-00189
Permit Status: Complete
Permit Description: SFR MER1301600 T21-M0073 REV1 roof covering change
Start Date | Submittal | Complete Date | Status |
---|---|---|---|
09/26/2024 | BUILDING DEFERRED SUBMITTAL REVIEW v.1 | 09/26/2024 | APPROVED |
07/10/2024 | BUILDING DEFERRED SUBMITTAL REVIEW v.1 | 07/12/2024 | APPROVED |
02/08/2024 | SITE FROM MODEL PERMIT - PRODUCTION v.1 | 02/15/2024 | APPROVED |
Conditions
Permit Number - TC-MDP-0224-00189
Permit Status: Complete
Permit Description: SFR MER1301600 T21-M0073 REV1 roof covering change
Date | Description | Comments |
---|---|---|
02/08/2024 | SPECIAL INSPECTION FOR CONCRETE INSTALLATION IS REQUIRED. | |
02/08/2024 | SPECIAL INSPECTION FOR EPOXY ANCHORS IS REQUIRED. | |
02/08/2024 | SPECIAL INSPECTION FOR POST TENSION SLAB IS REQUIRED. | |
02/15/2024 | Post-Tension Inspection Report is required. | |
02/06/2024 | Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. Contact sewer@pima.gov for review and assessment. | |
02/12/2024 | Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. Contact sewer@pima.gov for review and assessment. | |
02/06/2024 | Sewer condition must be accepted and released by Pima County prior to issuance of a Temporary Certificate of Occupancy. | |
02/12/2024 | Sewer condition must be accepted and released by Pima County prior to issuance of a Temporary Certificate of Occupancy. | |
07/12/2024 | SPECIAL INSPECTION FOR SPECIAL GRADING, EXCAVATION AND FILLING IS REQUIRED. | |
02/15/2024 | Truss/Joist Design plans must be submitted and approved prior to intermediate inspections if residential building or finaling the permit if commercial building. |
Outstanding Inspections
Permit Status: Complete
Permit Number: TC-MDP-0224-00189
Permite Description: SFR MER1301600 T21-M0073 REV1 roof covering change
Total Outstanding Inspections - 1
Last Inspection Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
07/12/2024 | RSBU - Building Progress | N/A | Not Applicable |
Completed Inspections
Permit Status: Complete
Permit Number: TC-MDP-0224-00189
Permit Description: SFR MER1301600 T21-M0073 REV1 roof covering change
Total Completed Inspections - 21
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
05/10/2024 | COT - RSPL - Yard Water Line | Passed | ||
05/10/2024 | COT - RSPL - Rough Soil | Passed | ||
05/17/2024 | COT - RSPL - Backwater Valve | Passed | Backwater valve is installed between the clean outs and is under a water test with no leaks. Okay to shade pipes and backfill trench. | |
05/17/2024 | COT - RSPL - Sewer | Passed | Sewer line is connected to clean outs, backwater valve, and underground plumbing. Complete system is under a water test with no leaks. Okay to shade pipes and backfill trenches. | |
05/31/2024 | COT - RSBU - Preslab | Passed | Concrete forms are set, post tension cabling is properly placed, shear wall hold downs and masa clips are secured to the form per the plan, subsoil is properly compacted, underground electrical for kitchen island is installed, all plumbing pipes are properly wrapped for protection, and ground wire and rods are properly installed in bottom of footer. Okay to proceed with concrete pour. | |
05/31/2024 | COT - RSEL - Grounding/Bonding | Passed | Concrete forms are set, post tension cabling is properly placed, shear wall hold downs and masa clips are secured to the form per the plan, subsoil is properly compacted, underground electrical for kitchen island is installed, all plumbing pipes are properly wrapped for protection, and Ufer ground rebar is properly installed in bottom of footer. Okay to proceed with concrete pour. | |
05/31/2024 | COT - RSEL - Electrical Underground | Passed | Concrete forms are set, post tension cabling is properly placed, shear wall hold downs and masa clips are secured to the form per the plan, subsoil is properly compacted, underground electrical for kitchen island is installed, all plumbing pipes are properly wrapped for protection, and Ufer ground rebar is properly installed in bottom of footer. Okay to proceed with concrete pour. | |
05/31/2024 | COT - RSBU - Excavation/Rebar/Zoning | Passed | Concrete forms are set, post tension cabling is properly placed, shear wall hold downs and masa clips are secured to the form per the plan, subsoil is properly compacted, underground electrical for kitchen island is installed, all plumbing pipes are properly wrapped for protection, and Ufer ground rebar is properly installed in bottom of footer. Okay to proceed with concrete pour. | |
06/14/2024 | COT - RSBU - Roof Nailing | Passed | Roof trusses are properly secured to top plate with nails and H2.5 clips. Plywood sheathing is properly secured to roof trusses per plans and code. Okay to proceed with plumbing top out. | |
06/14/2024 | COT - RSBU - Exterior Clips/Sheathing | Passed | Plywood sheathing for exterior shear walls is properly nailed per plan requirements. All bottom plates are secured to the concrete floor with cut nails, shot pins, poured in j-bolts, or titanium bolts. All shear wall hold downs are properly secured with nails to the studs. Okay to proceed with rough-in of mechanical, electrical, and plumbing work. | |
07/12/2024 | BULD - Electrical Clearance | Passed | ||
07/12/2024 | COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. | Passed | ||
07/12/2024 | COT - RSPL - Gas Pressure Test | Passed | ||
08/01/2024 | COT - RSBU - Interior Shear Bracing | Passed | ||
09/06/2024 | COT - BULD - SWG Clearance | Passed | Gas valves are installed at all gas appliance locations. SWG Clearance issued. | |
09/18/2024 | COT - RSEL - Electrical Final | Passed | ||
09/18/2024 | COT - RSEL - Outdoor Lighting | Passed | ||
09/18/2024 | COT - RSME - Mechanical Final | Passed | ||
09/18/2024 | COT - RSPL - Plumbing Final | Passed | ||
09/18/2024 | ENGR Engineering Final | Passed | ||
09/18/2024 | RSBU - Building Final | Passed |