Permit: TC-MDP-0223-00605
Permit Details
Apply Date:
01/18/2024
Applicant:
Daria Hopkins
Description:
SFR MER1502320 T21-M0070
Permit Reviews
Permit Number - TC-MDP-0223-00605
Permit Status: Complete
Permit Description: SFR MER1502320 T21-M0070
Start Date | Submittal | Complete Date | Status |
---|---|---|---|
01/19/2024 | SITE FROM MODEL PERMIT - PRODUCTION v.1 | 01/25/2024 | APPROVED |
09/26/2024 | BUILDING DEFERRED SUBMITTAL REVIEW v.1 | 09/27/2024 | APPROVED |
06/20/2024 | BUILDING DEFERRED SUBMITTAL REVIEW v.1 | 06/21/2024 | APPROVED |
Conditions
Permit Number - TC-MDP-0223-00605
Permit Status: Complete
Permit Description: SFR MER1502320 T21-M0070
Date | Description | Comments |
---|---|---|
01/19/2024 | SPECIAL INSPECTION FOR CONCRETE INSTALLATION IS REQUIRED. | |
01/19/2024 | SPECIAL INSPECTION FOR EPOXY ANCHORS IS REQUIRED. | |
01/19/2024 | SPECIAL INSPECTION FOR POST TENSION SLAB IS REQUIRED. | |
01/23/2024 | Post-Tension Inspection Report is required. | |
01/19/2024 | Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. Contact sewer@pima.gov for review and assessment. | |
01/19/2024 | Sewer condition must be accepted and released by Pima County prior to issuance of a Temporary Certificate of Occupancy. | |
01/23/2024 | Truss/Joist Design plans must be submitted and approved prior to intermediate inspections if residential building or finaling the permit if commercial building. |
Completed Inspections
Permit Status: Complete
Permit Number: TC-MDP-0223-00605
Permit Description: SFR MER1502320 T21-M0070
Total Completed Inspections - 21
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
04/23/2024 | COT - RSPL - Sewer | Passed | ||
04/23/2024 | COT - RSPL - Rough Soil | Passed | ||
04/23/2024 | COT - RSPL - Yard Water Line | Passed | ||
05/06/2024 | COT - RSBU - Excavation/Rebar/Zoning | Passed | Concrete forms are set, masa clips are spaced properly, shear wall clips are in place per plans, rebar reinforcement is in place per plans, post tension cabling is installed and properly spaced per plans, plumbing pipes are properly wrapped with foam for protection, underground electrical for kitchen island is installed, and Ufer ground is installed on right side of garage. Okay to pour concrete for footings and slab on grade. | |
05/06/2024 | COT - RSBU - Preslab | Passed | Concrete forms are set, masa clips are spaced properly, shear wall clips are in place per plans, rebar reinforcement is in place per plans, post tension cabling is installed and properly spaced per plans, plumbing pipes are properly wrapped with foam for protection, underground electrical for kitchen island is installed, and Ufer ground is installed on right side of garage. Okay to pour concrete for footings and slab on grade. | |
05/06/2024 | COT - RSEL - Electrical Underground | Passed | Concrete forms are set, masa clips are spaced properly, shear wall clips are in place per plans, rebar reinforcement is in place per plans, post tension cabling is installed and properly spaced per plans, plumbing pipes are properly wrapped with foam for protection, underground electrical for kitchen island is installed, and Ufer ground is installed on right side of garage. Okay to pour concrete for footings and slab on grade. | |
05/06/2024 | COT - RSEL - Grounding/Bonding | Passed | Concrete forms are set, masa clips are spaced properly, shear wall clips are in place per plans, rebar reinforcement is in place per plans, post tension cabling is installed and properly spaced per plans, plumbing pipes are properly wrapped with foam for protection, underground electrical for kitchen island is installed, and Ufer ground is installed on right side of garage. Okay to pour concrete for footings and slab on grade. | |
05/22/2024 | COT - RSBU - Exterior Clips/Sheathing | Passed | Exterior and interior walls are properly secured to concrete floor with cut nails, bolts or a/b bolts. Shear wall hold downs are properly nailed to studs in walls per plan and code. Plywood sheathing on shear walls is properly nailed per plans. Straps are installed and secured to headers of all large openings. Okay to proceed. | |
05/22/2024 | COT - RSBU - Roof Nailing | Passed | Roof trusses are properly secured to top plate with h2.5 clips. Plywood roof sheathing is properly nailed to trusses. Okay to proceed. | |
06/14/2024 | BULD - Electrical Clearance | Passed | Electrical panel is properly secured to wall and connected to the Ufer ground. Temporary breakers and outlet is installed. Issuing a ECO Clearance to TEP for 10547 e rosy marble dr. | |
06/14/2024 | COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. | Passed | Mechanical, electrical, and plumbing rough-in is complete. Okay to proceed with installation of insulation and drywall. | |
06/14/2024 | COT - RSPL - Gas Pressure Test | Passed | Gas line is holding 15# of compressed air. Okay to proceed. | |
07/08/2024 | COT - RSBU - Interior Shear Bracing | Passed | ||
09/05/2024 | COT - BULD - SWG Clearance | Passed | ||
09/13/2024 | COT - RSEL - Electrical Final | Passed | ||
09/13/2024 | COT - RSEL - Outdoor Lighting | Passed | ||
09/13/2024 | COT - RSME - Mechanical Final | Passed | ||
09/13/2024 | COT - RSPL - Plumbing Final | Passed | ||
09/12/2024 | ENGR Engineering Final | Passed | ||
09/13/2024 | RSBU - Building Final | Passed | ||
09/13/2024 | RSBU - Building Progress | Passed |