Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.

Permit Details

Status:
Complete
Type:
Model Building Permit
Apply Date:
01/05/2024
Applicant:
Daria Hopkins
Description:
SFR MER2403280 T21-M0074

Permit Reviews

Permit Number - TC-MDP-0223-00522
Permit Status: Complete
Permit Description: SFR MER2403280 T21-M0074
Start Date Submittal Complete Date Status  
11/15/2024 BUILDING DEFERRED SUBMITTAL REVIEW v.1 11/18/2024 APPROVED Review Details
01/08/2024 SITE FROM MODEL PERMIT - PRODUCTION v.1 01/11/2024 APPROVED Review Details
07/29/2024 BUILDING DEFERRED SUBMITTAL REVIEW v.1 08/02/2024 APPROVED Review Details

Conditions

Permit Number - TC-MDP-0223-00522
Permit Status: Complete
Permit Description: SFR MER2403280 T21-M0074
Date Description Comments
01/08/2024 SPECIAL INSPECTION FOR CONCRETE INSTALLATION IS REQUIRED.
01/08/2024 SPECIAL INSPECTION FOR EPOXY ANCHORS IS REQUIRED.
01/08/2024 SPECIAL INSPECTION FOR POST TENSION SLAB IS REQUIRED.
01/11/2024 Post-Tension Inspection Report is required.
01/08/2024 Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. Contact sewer@pima.gov for review and assessment.
01/08/2024 Sewer condition must be accepted and released by Pima County prior to issuance of a Temporary Certificate of Occupancy.
08/01/2024 SPECIAL INSPECTION FOR SPECIAL GRADING, EXCAVATION AND FILLING IS REQUIRED.
01/11/2024 Truss/Joist Design plans must be submitted and approved prior to intermediate inspections if residential building or finaling the permit if commercial building.

Outstanding Inspections

Permit Status: Complete
Permit Number: TC-MDP-0223-00522
Permite Description: SFR MER2403280 T21-M0074
Total Outstanding Inspections - 2
Last Inspection Date Description Inspector Results Comments
11/06/2024 COT - RSPL - Plumbing Final N/A Re-inspection required 11/6/24: HCS cleanout must have proper cap, All plastic piping on exterior of house must be UV coated, washer pan must terminate with proper fitting at exterior of home.
11/06/2024 RSBU - Building Final N/A Re-inspection required 11/6/24: HCS cleanout must have proper cap, All plastic piping on exterior of house must be UV coated, washer pan must terminate with proper fitting at exterior of home. Provide attic access

Completed Inspections

Permit Status: Complete
Permit Number: TC-MDP-0223-00522
Permit Description: SFR MER2403280 T21-M0074
Total Completed Inspections - 22
Date Description Inspector Results Comments
06/10/2024 COT - RSPL - Backwater Valve Passed Underground plumbing & backwater valve are connected to main sewer line. Entire system is under a water test with no leaks. Okay to shade pipe and backfill trenches.
06/10/2024 COT - RSPL - Yard Water Line Passed Main water supply line is installed from meter to house with blue tracer wire attached to pipe. System is under street pressure with no leaks. Okay to shade pipe and backfill trench.
06/10/2024 COT - RSPL - Rough Soil Passed Underground plumbing & backwater valve are connected to main sewer line. Entire system is under a water test with no leaks. Okay to shade pipe and backfill trenches.
06/10/2024 COT - RSPL - Sewer Passed Underground plumbing & backwater valve are connected to main sewer line. Entire system is under a water test with no leaks. Okay to shade pipe and backfill trenches.
06/18/2024 COT - RSBU - Excavation/Rebar/Zoning Passed
06/18/2024 COT - RSBU - Preslab Passed
06/18/2024 COT - RSEL - Grounding/Bonding Passed
06/18/2024 COT - RSEL - Electrical Underground Passed
07/22/2024 COT - RSBU - Exterior Clips/Sheathing Passed Exterior and interior plywood shear walls are properly installed, bolted, and nailed per the plans. All masa clips are properly nailed to bottom plate, all shear wall hold downs are properly nailed to wall studs, and titan bolts are installed were joints in bottom plate happened. Okay to proceed with rough-in of mechanical, electrical, and plumbing.
07/22/2024 COT - RSBU - Roof Nailing Passed Roof trusses are properly installed and secured to the top plate with nails and H2.5 clips. Roof sheathing is properly secured to the roof trusses with nails and staples.
08/22/2024 BULD - Electrical Clearance Passed TEP eco
08/22/2024 COT - RSPL - Gas Pressure Test Passed
08/23/2024 COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. Passed 8/23/24: Studs have been added under girder trusses in bedroom #4. Box for ceiling light/fan installed and wire installed inside box. Okay to proceed with installation of insulation and drywall.
09/05/2024 COT - RSBU - Interior Shear Bracing Passed
10/30/2024 COT - BULD - SWG Clearance Passed Gas valves are installed on gas pipes at each gas appliance location. Okay to install meter and turn on gas.
11/06/2024 COT - RSEL - Electrical Final Passed
11/06/2024 COT - RSEL - Outdoor Lighting Passed
11/06/2024 COT - RSME - Mechanical Final Passed
11/06/2024 RSBU - Building Progress Passed
11/08/2024 COT - RSPL - Plumbing Final Passed 11/8/24: Cap has been replaced on HCS clean-out, all plastic pipes have been painted, washer pan drain line has been properly terminated at exterior of house. Okay to issue Certificate of Occupancy.
11/08/2024 RSBU - Building Final Passed 11/8/24: Cap has been replaced on HCS clean-out, all plastic pipes have been painted, washer pan drain line has been properly terminated at exterior of house. Okay to issue Certificate of Occupancy.
11/12/2024 ENGR Engineering Final Passed

Documents

File Name Document Type  
148325 PT LOT 60 COMPLETE-2024-07-26_V1.PDF DOCUMENTS VIEW
COFT - PDSD - PERMIT CARD.PDF DOCUMENTS VIEW
LOT 60 APPLICATION_V1.PDF DOCUMENTS VIEW
LOT 60 PLOT PLAN_V1.PDF DOCUMENTS VIEW
LOT 60 SPECIAL INSPECTION CERTIFICATE-2024-01-05_V1.PDF DOCUMENTS VIEW