Permit Details

Status:
Issued
Type:
Model Building Permit
Apply Date:
01/05/2024
Applicant:
Daria Hopkins
Description:
SFR MER2402850 T21-M0075

Permit Reviews

Permit Number - TC-MDP-0223-00517
Permit Status: Issued
Permit Description: SFR MER2402850 T21-M0075
Start Date Submittal Complete Date Status  
07/29/2024 BUILDING DEFERRED SUBMITTAL REVIEW v.1 07/31/2024 APPROVED Review Details
01/05/2024 SITE FROM MODEL PERMIT - PRODUCTION v.1 01/11/2024 APPROVED Review Details

Outstanding Activity Conditions

Permit Number - TC-MDP-0223-00517
Permit Status: Issued
Permit Description: SFR MER2402850 T21-M0075
Total Outstanding Activity Conditions - 1
Date Name
01/05/2024 Sewer condition must be accepted and released by Pima County prior to issuance of a Temporary Certificate of Occupancy.

Conditions

Permit Number - TC-MDP-0223-00517
Permit Status: Issued
Permit Description: SFR MER2402850 T21-M0075
Date Description Comments
01/05/2024 SPECIAL INSPECTION FOR CONCRETE INSTALLATION IS REQUIRED.
01/05/2024 SPECIAL INSPECTION FOR EPOXY ANCHORS IS REQUIRED.
01/05/2024 SPECIAL INSPECTION FOR POST TENSION SLAB IS REQUIRED.
01/09/2024 Post-Tension Inspection Report is required.
01/05/2024 Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. Contact sewer@pima.gov for review and assessment.
07/31/2024 SPECIAL INSPECTION FOR SPECIAL GRADING, EXCAVATION AND FILLING IS REQUIRED.
01/09/2024 Truss/Joist Design plans must be submitted and approved prior to intermediate inspections if residential building or finaling the permit if commercial building.

Completed Inspections

Permit Status: Issued
Permit Number: TC-MDP-0223-00517
Permit Description: SFR MER2402850 T21-M0075
Total Completed Inspections - 15
Date Description Inspector Results Comments
06/10/2024 COT - RSPL - Backwater Valve Passed Underground plumbing & backwater valve are connected to main sewer line. Entire system is under a water test with no leaks. Okay to shade pipe and backfill trenches.
06/10/2024 COT - RSPL - Rough Soil Passed Underground plumbing & backwater valve are connected to main sewer line. Entire system is under a water test with no leaks. Okay to shade pipe and backfill trenches.
06/10/2024 COT - RSPL - Sewer Passed Underground plumbing & backwater valve are connected to main sewer line. Entire system is under a water test with no leaks. Okay to shade pipe and backfill trenches.
06/10/2024 COT - RSPL - Yard Water Line Passed Main water supply line is installed from meter to house with blue tracer wire attached to pipe. System is under street pressure with no leaks. Okay to shade pipe and backfill trench.
06/18/2024 COT - RSBU - Excavation/Rebar/Zoning Passed
06/18/2024 COT - RSBU - Preslab Passed
06/18/2024 COT - RSEL - Electrical Underground Passed
06/18/2024 COT - RSEL - Grounding/Bonding Passed
07/10/2024 COT - RSBU - Exterior Clips/Sheathing Passed 7/9/24: canceled per contractor

7/10/24: Plywood sheathing on exterior and interior shear walls is properly installed and secured to studs with nail pattern per the plan, exterior walls and interior walls are secured to the concrete floor with masa clips, shot pins, j-bolts, or titan bolts. Okay to proceed with rough-in of plumbing, mechanical, and electrical.
07/10/2024 COT - RSBU - Roof Nailing Passed 7/10/24: Roof trusses are properly secured to top plate with nails and H2.5 clips. Plywood sheathing is properly secured to trusses. Okay to proceed with mechanical, electrical, and plumbing rough-in.
08/09/2024 COT - RSPL - Gas Pressure Test Passed
08/12/2024 COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. Passed 8/12/24: DWV under test, pex water lines under pressure, rips and penetration in vapor barrier have been sealed, all registers are blocked out. Rough-in of mechanical, electrical, and plumbing is complete. Okay to proceed with installation of insulation and drywall.
08/15/2024 BULD - Electrical Clearance Passed TEP ECO
09/03/2024 COT - RSBU - Interior Shear Bracing Passed
10/09/2024 COT - BULD - SWG Clearance Passed 10-9-24, approved for Southwest gas.

Documents

File Name Document Type  
148324 PT LOT 61 COMPLETE-2024-07-26_V1.PDF DOCUMENTS VIEW
COFT - PDSD - PERMIT CARD.PDF DOCUMENTS VIEW
LOT 61 APPLICATION_V1.PDF DOCUMENTS VIEW
LOT 61 PLOT PLAN_V1.PDF DOCUMENTS VIEW
LOT 61 SPECIAL INSPECTION CERTIFICATE-2024-01-05_V1.PDF DOCUMENTS VIEW