Inspection Status: Re-inspection required
Inspection History: COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in.
| Date |
Description |
Inspector |
Results |
Comments |
| 08/09/2024 |
COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. |
|
Re-inspection required |
8/9/24: DWV not under test. Pex not under test. Rips and penetrations in vapor barrier need to be sealed. Register not blocked on second floor. Stopped inspection. |
| 08/12/2024 |
COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. |
|
Passed |
8/12/24: DWV under test, pex water lines under pressure, rips and penetration in vapor barrier have been sealed, all registers are blocked out. Rough-in of mechanical, electrical, and plumbing is complete. Okay to proceed with installation of insulation and drywall. |