Inspection History Details
Inspection Status: Canceled
Inspection History: COT - RSBU - Exterior/Interior Clips/Sheathing/Framing
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 07/09/2024 | COT - RSBU - Exterior/Interior Clips/Sheathing/Framing | Canceled | 7/9/24: canceled per contractor | |
| 07/10/2024 | COT - RSBU - Exterior/Interior Clips/Sheathing/Framing | Passed | 7/9/24: canceled per contractor 7/10/24: Plywood sheathing on exterior and interior shear walls is properly installed and secured to studs with nail pattern per the plan, exterior walls and interior walls are secured to the concrete floor with masa clips, shot pins, j-bolts, or titan bolts. Okay to proceed with rough-in of plumbing, mechanical, and electrical. |