Permit Details

Status:
Inspections Complete
Type:
Model Building Permit
Address NEW:
9847 E GRAY HAWK DR
Apply Date:
01/23/2025
Applicant:
Helen Ormsby
Description:
Casas del Cerrito H35G Model Plan (Model master plan TC-MDP-0823-01442)

Permit Reviews

Permit Number - TC-MDP-0125-00059
Permit Status: Inspections complete
Permit Description: Casas del Cerrito H35G Model Plan (Model master plan TC-MDP-0823-01442)
Start Date Submittal Complete Date Status  
01/29/2025 SITE FROM MODEL PERMIT - PRODUCTION v.1 02/05/2025 APPROVED Review Details
06/10/2025 BUILDING DEFERRED SUBMITTAL REVIEW v.1 06/10/2025 REQUIRES RESUBMIT Review Details
06/17/2025 BUILDING DEFERRED SUBMITTAL REVIEW v.2 06/17/2025 REQUIRES RESUBMIT Review Details
06/23/2025 BUILDING DEFERRED SUBMITTAL REVIEW v.3 06/24/2025 APPROVED Review Details

Outstanding Activity Conditions

Permit Number - TC-MDP-0125-00059
Permit Status: Inspections complete
Permit Description: Casas del Cerrito H35G Model Plan (Model master plan TC-MDP-0823-01442)
Total Outstanding Activity Conditions - 1
Date Name
01/28/2025 Sewer condition must be accepted and released by Pima County prior to issuance of a Temporary Certificate of Occupancy. For More Information visit https://www.pima.gov/1076/Sewer-Connection-Permits, To check your permit status https://permits.pima.gov/

Conditions

Permit Number - TC-MDP-0125-00059
Permit Status: Inspections complete
Permit Description: Casas del Cerrito H35G Model Plan (Model master plan TC-MDP-0823-01442)
Date Description Comments
01/28/2025 Contractor with active Arizona Contractor's License for specified scope of work, or a signed Owner Builder Affidavit https://www.tucsonaz.gov/files/sharedassets/public/v/1/pdsd/documents/permits/residential-permits/pdsd_owner_builder_affidavit_081623.pdf, is required prior to issuance of permit. Contractor or Owner must have a TDC Online account and be added to the permit as the correct contact type https://www.tucsonaz.gov/files/sharedassets/public/v/2/pdsd/documents/tdc-faq/new-pdfs/adding-additional-contacts.pdf. If you are providing an Owner Builder Affidavit, the owner MUST be attached as a contact on the permit.
01/29/2025 Post-Installed Anchor Inspection Report is required.
01/29/2025 Post-Tension Inspection Report is required.
01/28/2025 Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. For review and assessment: apply online at https://permits.pima.gov/ or contact us at sewer@pima.gov, (520) 724-9900.
01/29/2025 Soils Testing Special Inspection is Required.

Outstanding Inspections

Permit Status: Inspections Complete
Permit Number: TC-MDP-0125-00059
Permite Description: Casas del Cerrito H35G Model Plan (Model master plan TC-MDP-0823-01442)
Total Outstanding Inspections - 5
Last Inspection Date Description Inspector Results Comments
08/18/2025 COT - RSME - Mechanical Final N/A Re-inspection required 8.18.2025
Needs non-metallic plumbing labeled on dead front, fill receptacle box area near main panel, missing post-tension tag, missing metal cap for clean out in driveway, main breaker panel shows AC breaker at 50A but max on label shows 40A, insulate exposed copper in garage, add receptacle on west wall next to future refrigerator, clean outs near AC need cut to grade, clamp whip midway on AC, heat kit in attic needs marked.
08/18/2025 RSBU - Building Final N/A Re-inspection required 8.18.2025
Needs non-metallic plumbing labeled on dead front, fill receptacle box area near main panel, missing post-tension tag, missing metal cap for clean out in driveway, main breaker panel shows AC breaker at 50A but max on label shows 40A, insulate exposed copper in garage, add receptacle on west wall next to future refrigerator, clean outs near AC need cut to grade, clamp whip midway on AC, heat kit in attic needs marked.
08/18/2025 COT - RSPL - Plumbing Final N/A Re-inspection required 8.18.2025
Needs non-metallic plumbing labeled on dead front, fill receptacle box area near main panel, missing post-tension tag, missing metal cap for clean out in driveway, main breaker panel shows AC breaker at 50A but max on label shows 40A, insulate exposed copper in garage, add receptacle on west wall next to future refrigerator, clean outs near AC need cut to grade, clamp whip midway on AC, heat kit in attic needs marked.
08/18/2025 RSBU - Building Progress N/A Re-inspection required 8.18.2025
Needs non-metallic plumbing labeled on dead front, fill receptacle box area near main panel, missing post-tension tag, missing metal cap for clean out in driveway, main breaker panel shows AC breaker at 50A but max on label shows 40A, insulate exposed copper in garage, add receptacle on west wall next to future refrigerator, clean outs near AC need cut to grade, clamp whip midway on AC, heat kit in attic needs marked.
08/18/2025 COT - RSEL - Electrical Final N/A Re-inspection required 8.18.2025
Needs non-metallic plumbing labeled on dead front, fill receptacle box area near main panel, missing post-tension tag, missing metal cap for clean out in driveway, main breaker panel shows AC breaker at 50A but max on label shows 40A, insulate exposed copper in garage, add receptacle on west wall next to future refrigerator, clean outs near AC need cut to grade, clamp whip midway on AC, heat kit in attic needs marked.

Completed Inspections

Permit Status: Inspections Complete
Permit Number: TC-MDP-0125-00059
Permit Description: Casas del Cerrito H35G Model Plan (Model master plan TC-MDP-0823-01442)
Total Completed Inspections - 21
Date Description Inspector Results Comments
04/18/2025 BULD - Electrical Clearance Passed Ready for temp power CLEARANCE ECO
04/18/2025 COT - RSPL - Rough Soil Passed Passed 4/18/25 ok to backfill
04/18/2025 COT - RSPL - Sewer Passed Passed 4/18/25 ok to backfill
04/18/2025 COT - RSPL - Yard Water Line Passed Passed 4/18/25 ok to backfill
04/25/2025 COT - RSBU - Excavation/Rebar/Zoning Passed Passed 4/25/25 ok to pour concrete
04/25/2025 COT - RSBU - Preslab Passed Passed 4/25/25 ok to pour concrete
04/25/2025 COT - RSEL - Electrical Underground Passed Passed 4/25/25 ok to pour concrete
04/25/2025 COT - RSEL - Grounding/Bonding Passed Passed 4/25/25
05/08/2025 COT - RSBU - Exterior/Interior Clips/Sheathing/Framing Passed 5/8/25 corrections made
05/08/2025 COT - RSBU - Roof Nailing Passed 5/8/25 corrections made
05/20/2025 COT - RSPL - Gas Pressure Test Passed Passed final 5/20/25
05/23/2025 COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. Passed 5/23/25 corrections made
06/03/2025 COT - RSBU - Interior Shear Bracing Passed
07/23/2025 COT - BULD - SWG Clearance Passed Passed CLEARANCE SWG 7/23/25
08/18/2025 COT - RSEL - Outdoor Lighting Passed
08/18/2025 ENGR Engineering Final Passed
09/16/2025 COT - RSME - Mechanical Final Passed Passed final 9/16/25
09/16/2025 RSBU - Building Final Passed Passed final 9/16/25
09/16/2025 COT - RSPL - Plumbing Final Passed Passed final 9/16/25
09/16/2025 RSBU - Building Progress Passed Passed final 9/16/25
09/16/2025 COT - RSEL - Electrical Final Passed Passed final 9/16/25

Documents

File Name Document Type  
CDC 22 SIC-2025-06-23_V3.PDF DOCUMENTS VIEW
COFT - PDSD - PERMIT CARD.PDF DOCUMENTS VIEW
CDC 22 D1_V1.PDF DOCUMENTS VIEW
CDC 22 SIC-2025-01-28_V1.PDF DOCUMENTS VIEW