Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Permit: TC-MDP-0125-00059
Permit Details
Status:
Inspections Complete
Type:
Model Building Permit
Address:
9847 E GRAY HAWK DR
Address NEW:
9847 E GRAY HAWK DR
Apply Date:
01/23/2025
Applicant:
Helen Ormsby
Description:
Casas del Cerrito H35G Model Plan (Model master plan TC-MDP-0823-01442)
Permit Reviews
Permit Number - TC-MDP-0125-00059
Permit Status: Inspections complete
Permit Description: Casas del Cerrito H35G Model Plan (Model master plan TC-MDP-0823-01442)
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 01/29/2025 | SITE FROM MODEL PERMIT - PRODUCTION v.1 | 02/05/2025 | APPROVED |
| 06/10/2025 | BUILDING DEFERRED SUBMITTAL REVIEW v.1 | 06/10/2025 | REQUIRES RESUBMIT |
| 06/17/2025 | BUILDING DEFERRED SUBMITTAL REVIEW v.2 | 06/17/2025 | REQUIRES RESUBMIT |
| 06/23/2025 | BUILDING DEFERRED SUBMITTAL REVIEW v.3 | 06/24/2025 | APPROVED |
Outstanding Activity Conditions
Permit Number - TC-MDP-0125-00059
Permit Status: Inspections complete
Permit Description: Casas del Cerrito H35G Model Plan (Model master plan TC-MDP-0823-01442)
Total Outstanding Activity Conditions - 1
| Date | Name |
|---|---|
| 01/28/2025 | Sewer condition must be accepted and released by Pima County prior to issuance of a Temporary Certificate of Occupancy. For More Information visit https://www.pima.gov/1076/Sewer-Connection-Permits, To check your permit status https://permits.pima.gov/ |
Conditions
Permit Number - TC-MDP-0125-00059
Permit Status: Inspections complete
Permit Description: Casas del Cerrito H35G Model Plan (Model master plan TC-MDP-0823-01442)
| Date | Description | Comments |
|---|---|---|
| 01/28/2025 | Contractor with active Arizona Contractor's License for specified scope of work, or a signed Owner Builder Affidavit https://www.tucsonaz.gov/files/sharedassets/public/v/1/pdsd/documents/permits/residential-permits/pdsd_owner_builder_affidavit_081623.pdf, is required prior to issuance of permit. Contractor or Owner must have a TDC Online account and be added to the permit as the correct contact type https://www.tucsonaz.gov/files/sharedassets/public/v/2/pdsd/documents/tdc-faq/new-pdfs/adding-additional-contacts.pdf. If you are providing an Owner Builder Affidavit, the owner MUST be attached as a contact on the permit. | |
| 01/29/2025 | Post-Installed Anchor Inspection Report is required. | |
| 01/29/2025 | Post-Tension Inspection Report is required. | |
| 01/28/2025 | Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. For review and assessment: apply online at https://permits.pima.gov/ or contact us at sewer@pima.gov, (520) 724-9900. | |
| 01/29/2025 | Soils Testing Special Inspection is Required. |
Outstanding Inspections
Permit Status: Inspections Complete
Permit Number: TC-MDP-0125-00059
Permite Description: Casas del Cerrito H35G Model Plan (Model master plan TC-MDP-0823-01442)
Total Outstanding Inspections - 5
| Last Inspection Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 08/18/2025 | COT - RSME - Mechanical Final | N/A | Re-inspection required | 8.18.2025 Needs non-metallic plumbing labeled on dead front, fill receptacle box area near main panel, missing post-tension tag, missing metal cap for clean out in driveway, main breaker panel shows AC breaker at 50A but max on label shows 40A, insulate exposed copper in garage, add receptacle on west wall next to future refrigerator, clean outs near AC need cut to grade, clamp whip midway on AC, heat kit in attic needs marked. |
| 08/18/2025 | RSBU - Building Final | N/A | Re-inspection required | 8.18.2025 Needs non-metallic plumbing labeled on dead front, fill receptacle box area near main panel, missing post-tension tag, missing metal cap for clean out in driveway, main breaker panel shows AC breaker at 50A but max on label shows 40A, insulate exposed copper in garage, add receptacle on west wall next to future refrigerator, clean outs near AC need cut to grade, clamp whip midway on AC, heat kit in attic needs marked. |
| 08/18/2025 | COT - RSPL - Plumbing Final | N/A | Re-inspection required | 8.18.2025 Needs non-metallic plumbing labeled on dead front, fill receptacle box area near main panel, missing post-tension tag, missing metal cap for clean out in driveway, main breaker panel shows AC breaker at 50A but max on label shows 40A, insulate exposed copper in garage, add receptacle on west wall next to future refrigerator, clean outs near AC need cut to grade, clamp whip midway on AC, heat kit in attic needs marked. |
| 08/18/2025 | RSBU - Building Progress | N/A | Re-inspection required | 8.18.2025 Needs non-metallic plumbing labeled on dead front, fill receptacle box area near main panel, missing post-tension tag, missing metal cap for clean out in driveway, main breaker panel shows AC breaker at 50A but max on label shows 40A, insulate exposed copper in garage, add receptacle on west wall next to future refrigerator, clean outs near AC need cut to grade, clamp whip midway on AC, heat kit in attic needs marked. |
| 08/18/2025 | COT - RSEL - Electrical Final | N/A | Re-inspection required | 8.18.2025 Needs non-metallic plumbing labeled on dead front, fill receptacle box area near main panel, missing post-tension tag, missing metal cap for clean out in driveway, main breaker panel shows AC breaker at 50A but max on label shows 40A, insulate exposed copper in garage, add receptacle on west wall next to future refrigerator, clean outs near AC need cut to grade, clamp whip midway on AC, heat kit in attic needs marked. |
Completed Inspections
Permit Status: Inspections Complete
Permit Number: TC-MDP-0125-00059
Permit Description: Casas del Cerrito H35G Model Plan (Model master plan TC-MDP-0823-01442)
Total Completed Inspections - 21
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 04/18/2025 | BULD - Electrical Clearance | Passed | Ready for temp power CLEARANCE ECO | |
| 04/18/2025 | COT - RSPL - Rough Soil | Passed | Passed 4/18/25 ok to backfill | |
| 04/18/2025 | COT - RSPL - Sewer | Passed | Passed 4/18/25 ok to backfill | |
| 04/18/2025 | COT - RSPL - Yard Water Line | Passed | Passed 4/18/25 ok to backfill | |
| 04/25/2025 | COT - RSBU - Excavation/Rebar/Zoning | Passed | Passed 4/25/25 ok to pour concrete | |
| 04/25/2025 | COT - RSBU - Preslab | Passed | Passed 4/25/25 ok to pour concrete | |
| 04/25/2025 | COT - RSEL - Electrical Underground | Passed | Passed 4/25/25 ok to pour concrete | |
| 04/25/2025 | COT - RSEL - Grounding/Bonding | Passed | Passed 4/25/25 | |
| 05/08/2025 | COT - RSBU - Exterior/Interior Clips/Sheathing/Framing | Passed | 5/8/25 corrections made | |
| 05/08/2025 | COT - RSBU - Roof Nailing | Passed | 5/8/25 corrections made | |
| 05/20/2025 | COT - RSPL - Gas Pressure Test | Passed | Passed final 5/20/25 | |
| 05/23/2025 | COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. | Passed | 5/23/25 corrections made | |
| 06/03/2025 | COT - RSBU - Interior Shear Bracing | Passed | ||
| 07/23/2025 | COT - BULD - SWG Clearance | Passed | Passed CLEARANCE SWG 7/23/25 | |
| 08/18/2025 | COT - RSEL - Outdoor Lighting | Passed | ||
| 08/18/2025 | ENGR Engineering Final | Passed | ||
| 09/16/2025 | COT - RSME - Mechanical Final | Passed | Passed final 9/16/25 | |
| 09/16/2025 | RSBU - Building Final | Passed | Passed final 9/16/25 | |
| 09/16/2025 | COT - RSPL - Plumbing Final | Passed | Passed final 9/16/25 | |
| 09/16/2025 | RSBU - Building Progress | Passed | Passed final 9/16/25 | |
| 09/16/2025 | COT - RSEL - Electrical Final | Passed | Passed final 9/16/25 |