Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Inspection History Details
Inspection Status: Re-inspection required
Inspection History: RSBU - Building Progress
Permit Number - TC-MDP-0125-00059
Inspection Description - RSBU - Building Progress
Inspection Status - Re-inspection required
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 08/18/2025 | RSBU - Building Progress | Re-inspection required | 8.18.2025 Needs non-metallic plumbing labeled on dead front, fill receptacle box area near main panel, missing post-tension tag, missing metal cap for clean out in driveway, main breaker panel shows AC breaker at 50A but max on label shows 40A, insulate exposed copper in garage, add receptacle on west wall next to future refrigerator, clean outs near AC need cut to grade, clamp whip midway on AC, heat kit in attic needs marked. |
|
| 09/16/2025 | RSBU - Building Progress | Passed | Passed final 9/16/25 |