Permit Details

Status:
Inspections Complete
Type:
Model Building Permit
Apply Date:
01/30/2024
Applicant:
Celina Rodriguez
Description:
SFR BT1262-130 T22-M0016

Permit Reviews

Permit Number - TC-MDP-0124-00093
Permit Status: Inspections complete
Permit Description: SFR BT1262-130 T22-M0016
Start Date Submittal Complete Date Status  
01/30/2024 SITE FROM MODEL PERMIT - PRODUCTION v.1 02/02/2024 APPROVED Review Details

Outstanding Activity Conditions

Permit Number - TC-MDP-0124-00093
Permit Status: Inspections complete
Permit Description: SFR BT1262-130 T22-M0016
Total Outstanding Activity Conditions - 7
Date Name
01/17/2024 Sewer condition must be accepted and released by Pima County prior to issuance of a Temporary Certificate of Occupancy.
01/30/2024 SPECIAL INSPECTION FOR EPOXY ANCHORS IS REQUIRED.
01/30/2024 SPECIAL INSPECTION FOR POST TENSION SLAB IS REQUIRED.
01/30/2024 Post-Installed Anchor Inspection Report is required.
02/01/2024 Post-Tension Inspection Report is required.
02/01/2024 Truss/Joist Design plans must be submitted and approved prior to intermediate inspections if residential building or finaling the permit if commercial building.
11/22/2023 Sewer condition must be accepted and released by Pima County prior to issuance of a Temporary Certificate of Occupancy.

Conditions

Permit Number - TC-MDP-0124-00093
Permit Status: Inspections complete
Permit Description: SFR BT1262-130 T22-M0016
Date Description Comments
01/17/2024 Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. Contact sewer@pima.gov for review and assessment.
11/22/2023 Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. Contact sewer@pima.gov for review and assessment.

Completed Inspections

Permit Status: Inspections Complete
Permit Number: TC-MDP-0124-00093
Permit Description: SFR BT1262-130 T22-M0016
Total Completed Inspections - 21
Date Description Inspector Results Comments
03/01/2024 COT - RSPL - Rough Soil Passed
03/13/2024 COT - RSBU - Preslab Passed Post-tension cabling is properly installed and spaced per plans, additional rebar reinforcement is in place as required, Ufer ground is in footing for exterior garage wall, and forms are set for a monolithic concrete pour. Okay to proceed with concrete pour.
03/13/2024 COT - RSBU - Excavation/Rebar/Zoning Passed Post-tension cabling is properly installed and spaced per plans, additional rebar reinforcement is in place as required, Ufer ground is in footing for exterior garage wall, and forms are set for a monolithic concrete pour. Okay to proceed with concrete pour.
03/13/2024 COT - RSEL - Electrical Underground Passed Electrical underground for kitchen island is in place. Okay to proceed with concrete pour.
03/13/2024 COT - RSEL - Grounding/Bonding Passed Post-tension cabling is properly installed and spaced per plans, additional rebar reinforcement is in place as required, Ufer ground is in footing for exterior garage wall, and forms are set for a monolithic concrete pour. Okay to proceed with concrete pour.
04/02/2024 COT - RSBU - Roof Nailing Passed
04/02/2024 COT - RSBU - Exterior Clips/Sheathing Passed 4/2/24: Missing anchor bolts and cut nails at bottom plates. Okay to do intermediates will check for corrections then.
05/08/2024 COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. Passed 5/8/24: GEC is now properly connected to Ufer ground, backing plate added to sole plate and top plate were needed, soldered joint at water heater has been corrected, and all wiring in front of bathroom has been installed. Mechanical, electrical, and plumbing rough-in is completed. Okay to proceed with installation of insulation and drywall.
05/08/2024 COT - RSPL - Gas Pressure Test Passed Gas line is under 15# of compressed air with no leaks. Okay to proceed.
05/28/2024 COT - RSBU - Interior Shear Bracing Passed
07/19/2024 COT - BULD - SWG Clearance Passed
07/24/2024 COT - RSPL - Sewer Passed 7/24/24: Underground plumbing is properly connected to sewer line and is under a water test with no leaks. Okay to shade pipe and backfill trench.
07/24/2024 BULD - Electrical Clearance Passed Okay to energize panel. ECO Clearance issued to TEP for 9111 E. Red Bluff Ct.
08/09/2024 COT - RSPL - Yard Water Line Passed
08/26/2024 COT - RSEL - Outdoor Lighting Passed Outdoor lighting is is properly installed per plan and city regulations.
08/30/2024 COT - RSEL - Electrical Final Passed 8/30/24: Construction is completed. Mechanical, electrical, and plumbing fixtures are installed and operational. Electrical panel is properly labeled with AFCI/GFCI breakers installed as required. Outdoor lighting is installed per plans and city regulations. Okay to issue Certificate of Occupancy for this project.
08/30/2024 COT - RSME - Mechanical Final Passed 8/30/24: Construction is completed. Mechanical, electrical, and plumbing fixtures are installed and operational. Electrical panel is properly labeled with AFCI/GFCI breakers installed as required. Outdoor lighting is installed per plans and city regulations. Okay to issue Certificate of Occupancy for this project.
08/30/2024 COT - RSPL - Plumbing Final Passed Construction is completed. Mechanical, electrical, and plumbing fixtures are installed and operational. Electrical panel is properly labeled with AFCI/GFCI breakers installed as required. Outdoor lighting is installed per plans and city regulations. Okay to issue Certificate of Occupancy for this project.
08/30/2024 ENGR Engineering Final Passed I pulled the nursery stake
08/30/2024 RSBU - Building Final Passed Construction is completed. Mechanical, electrical, and plumbing fixtures are installed and operational. Electrical panel is properly labeled with AFCI/GFCI breakers installed as required. Outdoor lighting is installed per plans and city regulations. Okay to issue Certificate of Occupancy for this project.
08/30/2024 RSBU - Building Progress Passed Construction is completed. Mechanical, electrical, and plumbing fixtures are installed and operational. Electrical panel is properly labeled with AFCI/GFCI breakers installed as required. Outdoor lighting is installed per plans and city regulations. Okay to issue Certificate of Occupancy for this project.

Documents

File Name Document Type  
COFT - PDSD - PERMIT CARD.PDF DOCUMENTS VIEW
BELLA TIERRA PHASE 3 - LOT 27 START_V1.PDF DOCUMENTS VIEW
BTIII 27 SIC-2024-01-30_V1.PDF DOCUMENTS VIEW