Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.

Parcel: 136301420


Addresses:

9111 E RED BLUFF CT


Inspection Status: Re-inspection required

Inspection History: COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in.

Permit Number - TC-MDP-0124-00093

Inspection Description - COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in.

Inspection Status - Re-inspection required

Date Description Inspector Results Comments
05/02/2024 COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. Re-inspection required GEC not properly connected to ufer, add nail plate for 6awg wire at rope plate behind electrical panel, gas not under test, Pex lines must be 18” away from next working soldered joint/location at water heater per M2105.10.2., fresh air intake must be 10’ away from plumbing vents, add nail plates to top plate for wire penetrations right side of sliding doors, complete wiring in front of bathroom by laundry, cleanouts missing at water closets.
05/08/2024 COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. Passed 5/8/24: GEC is now properly connected to Ufer ground, backing plate added to sole plate and top plate were needed, soldered joint at water heater has been corrected, and all wiring in front of bathroom has been installed. Mechanical, electrical, and plumbing rough-in is completed. Okay to proceed with installation of insulation and drywall.