Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.

Parcel: 136301420


Addresses:

9111 E RED BLUFF CT


Inspection Status: Re-inspection required

Inspection History: RSBU - Building Final 

Permit Number - TC-MDP-0124-00093

Inspection Description - RSBU - Building Final 

Inspection Status - Re-inspection required

Date Description Inspector Results Comments
08/26/2024 RSBU - Building Final  Re-inspection required Water is not turned on to house. Gray water clean-outs need to be cut to grade and capped. Grading on east side of house needs to be completed.
08/30/2024 RSBU - Building Final  Passed Construction is completed. Mechanical, electrical, and plumbing fixtures are installed and operational. Electrical panel is properly labeled with AFCI/GFCI breakers installed as required. Outdoor lighting is installed per plans and city regulations. Okay to issue Certificate of Occupancy for this project.