Permit: TC-MDP-0124-00075
Permit Details
Status:
Complete
Type:
Model Building Permit
Address:
2761 S OAKENSHIELD WY
Address NEW:
2761 S OAKENSHIELD WY
Apply Date:
01/11/2024
Applicant:
Chris Irby
Description:
CS1453t (Model Master Plan TC-MDP-0723-01249)
Permit Reviews
Permit Number - TC-MDP-0124-00075
Permit Status: Complete
Permit Description: CS1453t (Model Master Plan TC-MDP-0723-01249)
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 11/13/2025 | BUILDING DEFERRED SUBMITTAL REVIEW v.2 | 11/17/2025 | APPROVED |
| 09/24/2025 | BUILDING DEFERRED SUBMITTAL REVIEW v.1 | 09/24/2025 | REQUIRES RESUBMIT |
| 02/20/2026 | BUILDING DEFERRED SUBMITTAL REVIEW v.1 | 02/24/2026 | REQUIRES RESUBMIT |
| 03/02/2026 | BUILDING DEFERRED SUBMITTAL REVIEW v.2 | 03/05/2026 | APPROVED |
| 01/12/2024 | SITE FROM MODEL TEMPLATE - INFILL BUILDERS v.1 | 01/26/2024 | APPROVED |
Conditions
Permit Number - TC-MDP-0124-00075
Permit Status: Complete
Permit Description: CS1453t (Model Master Plan TC-MDP-0723-01249)
| Date | Description | Comments |
|---|---|---|
| 01/16/2024 | SPECIAL INSPECTION FOR CONCRETE INSTALLATION IS REQUIRED. | |
| 01/26/2024 | Contractor with active Arizona Contractor's License for specified scope of work required prior to issuance of permit. Contractor must have a TDC Online account and be added to the permit as a contact. | |
| 01/12/2024 | SPECIAL INSPECTION FOR POST TENSION SLAB IS REQUIRED. | |
| 07/10/2024 | Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. Contact sewer@pima.gov for review and assessment. | |
| 07/14/2023 | Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. Contact sewer@pima.gov for review and assessment. | |
| 01/11/2024 | Sewer condition must be accepted and released by Pima County prior to issuance of a Temporary Certificate of Occupancy. | |
| 01/12/2024 | SPECIAL INSPECTION FOR SPECIAL GRADING, EXCAVATION AND FILLING IS REQUIRED. | |
| 01/16/2024 | SPECIAL INSPECTION FOR STRUCTURAL STEEL IS REQUIRED. | |
| 07/31/2023 | Truss/Joist Design plans must be submitted and approved prior to intermediate inspections if residential building or finaling the permit if commercial building. |
Outstanding Inspections
Permit Status: Complete
Permit Number: TC-MDP-0124-00075
Permite Description: CS1453t (Model Master Plan TC-MDP-0723-01249)
Total Outstanding Inspections - 4
| Last Inspection Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 08/18/2025 | COT - RSEL - Electrical Final | N/A | Re-inspection required | 8-18-25: water closet not connected upstairs bathroom and wrap hot water copper line at water heater with a minimum of R3 insulation, paint all exterior PVC/ABS, and identify future solar breaker at panel, write" non-metallic plumbing " inside main panel. Note: gas meter not installed yet. |
| 08/18/2025 | COT - RSME - Mechanical Final | N/A | Re-inspection required | 8-18-25: water closet not connected upstairs bathroom and wrap hot water copper line at water heater with a minimum of R3 insulation, paint all exterior PVC/ABS, and identify future solar breaker at panel, write" non-metallic plumbing " inside main panel. Note: gas meter not installed yet. |
| 08/18/2025 | COT - RSPL - Plumbing Final | N/A | Re-inspection required | 8-18-25: water closet not connected upstairs bathroom and wrap hot water copper line at water heater with a minimum of R3 insulation, paint all exterior PVC/ABS, and identify future solar breaker at panel, write" non-metallic plumbing " inside main panel. Note: gas meter not installed yet. |
| 08/18/2025 | RSBU - Building Final | N/A | Re-inspection required | 8-18-25: water closet not connected upstairs bathroom and wrap hot water copper line at water heater with a minimum of R3 insulation, paint all exterior PVC/ABS, and identify future solar breaker at panel. Note: gas meter not installed yet. |
Completed Inspections
Permit Status: Complete
Permit Number: TC-MDP-0124-00075
Permit Description: CS1453t (Model Master Plan TC-MDP-0723-01249)
Total Completed Inspections - 22
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 05/06/2025 | COT - RSPL - Yard Water Line | Passed | Passed 5/6/25 ok to backfill | |
| 05/06/2025 | COT - RSPL - Sewer | Passed | Passed 5/6/25 ok to backfill | |
| 05/06/2025 | COT - RSPL - Rough Soil | Passed | Passed 5/6/25 ok to backfill | |
| 05/06/2025 | COT - RSPL - Backwater Valve | Passed | Passed 5/6/25 ok to backfill | |
| 05/13/2025 | BULD - Electrical Clearance | Passed | Ready for temp power CLEARANCE ECO | |
| 05/13/2025 | COT - RSBU - Excavation/Rebar/Zoning | Passed | Passed 5/13/25 ok to pour concrete | |
| 05/13/2025 | COT - RSBU - Preslab | Passed | Passed 5/13/25 ok to pour concrete | |
| 05/13/2025 | COT - RSEL - Electrical Underground | Passed | Passed 5/13/25 ok to pour concrete | |
| 05/22/2025 | COT - RSBU - Roof Nailing | Passed | Passed, repairs made while on site 5/22/25 | |
| 05/22/2025 | COT - RSBU - Exterior/Interior Clips/Sheathing/Framing | Passed | Passed, repairs made while on site 5/22/25 | |
| 06/23/2025 | COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. | Passed | Passed 6/23/25 | |
| 06/23/2025 | COT - RSEL - Grounding/Bonding | Passed | Passed 6/23/25 | |
| 06/23/2025 | COT - RSPL - Gas Pressure Test | Passed | Passed 6/23/25 | |
| 07/08/2025 | COT - RSBU - Interior Shear Bracing | Passed | Passed 7/8/25 | |
| 08/18/2025 | COT - BULD - SWG Clearance | Passed | 8-18-25: okay for SWG to install meter. Clearance issued to SWG. | |
| 08/18/2025 | COT - RSEL - Outdoor Lighting | Passed | 8-18-25: approved | |
| 08/18/2025 | RSBU - Building Progress | Passed | 8-18-25: approved | |
| 08/22/2025 | COT - RSEL - Electrical Final | Passed | ||
| 08/22/2025 | COT - RSME - Mechanical Final | Passed | ||
| 08/22/2025 | COT - RSPL - Plumbing Final | Passed | ||
| 08/22/2025 | RSBU - Building Final | Passed | ||
| 08/22/2025 | ENGR Engineering Final | Passed |