Inspection History Details
Inspection Status: Re-inspection required
Inspection History: COT - RSPL - Plumbing Final
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 08/18/2025 | COT - RSPL - Plumbing Final | Re-inspection required | 8-18-25: water closet not connected upstairs bathroom and wrap hot water copper line at water heater with a minimum of R3 insulation, paint all exterior PVC/ABS, and identify future solar breaker at panel, write" non-metallic plumbing " inside main panel. Note: gas meter not installed yet. |
|
| 08/22/2025 | COT - RSPL - Plumbing Final | Passed |