Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you cannot find what you are looking for please submit a records request.

Inspection Status: Re-inspection required

Inspection History: RSBU - Building Final 

Date Description Inspector Results Comments
08/18/2025 RSBU - Building Final  Re-inspection required 8-18-25: water closet not connected upstairs bathroom and wrap hot water copper line at water heater with a minimum of R3 insulation, paint all exterior PVC/ABS, and identify future solar breaker at panel.
Note: gas meter not installed yet.
08/22/2025 RSBU - Building Final  Passed