Permit Details

Status:
Complete
Type:
Model Building Permit
Address NEW:
10381 E SILVER FOX DR
Apply Date:
04/10/2024
Applicant:
Dana Petty
Description:
SFR MER1402370 T21-M0077 REV1 roof covering change

Permit Reviews

Permit Number - TC-MDP-0124-00043
Permit Status: Complete
Permit Description: SFR MER1402370 T21-M0077 REV1 roof covering change
Start Date Submittal Complete Date Status  
10/03/2024 BUILDING DEFERRED SUBMITTAL REVIEW v.1 10/03/2024 APPROVED Review Details
04/12/2024 SITE FROM MODEL PERMIT - PRODUCTION v.1 04/18/2024 APPROVED Review Details

Conditions

Permit Number - TC-MDP-0124-00043
Permit Status: Complete
Permit Description: SFR MER1402370 T21-M0077 REV1 roof covering change
Date Description Comments
04/15/2024 SPECIAL INSPECTION FOR CONCRETE INSTALLATION IS REQUIRED.
04/15/2024 SPECIAL INSPECTION FOR EPOXY ANCHORS IS REQUIRED.
04/15/2024 SPECIAL INSPECTION FOR POST TENSION SLAB IS REQUIRED.
04/15/2024 Post-Tension Inspection Report is required.
01/09/2024 Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. Contact sewer@pima.gov for review and assessment.
01/09/2024 Sewer condition must be accepted and released by Pima County prior to issuance of a Temporary Certificate of Occupancy.
04/15/2024 Truss/Joist Design plans must be submitted and approved prior to intermediate inspections if residential building or finaling the permit if commercial building.

Outstanding Inspections

Permit Status: Complete
Permit Number: TC-MDP-0124-00043
Permite Description: SFR MER1402370 T21-M0077 REV1 roof covering change
Total Outstanding Inspections - 4
Last Inspection Date Description Inspector Results Comments
10/07/2024 COT - RSPL - Gas Pressure Test N/A Re-inspection required 10/7/24: multiple issues in house rips in vapor barrier, DWV not under test. Shower pans and tub not under test. Gas not under test. Stopped inspection.
10/07/2024 BULD - Electrical Clearance N/A Re-inspection required 10/7/24: branch circuits tied together. Re-inspection required
10/07/2024 COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. N/A Re-inspection required 10/7/24: multiple issues in house rips in vapor barrier, DWV not under test. Shower pans and tub not under test. Gas not under test. Stopped inspection.
10/07/2024 RSBU - Building Progress N/A Re-inspection required 10/7/24: multiple issues in house rips in vapor barrier, DWV not under test. Shower pans and tub not under test. Gas not under test. Stopped inspection.

Completed Inspections

Permit Status: Complete
Permit Number: TC-MDP-0124-00043
Permit Description: SFR MER1402370 T21-M0077 REV1 roof covering change
Total Completed Inspections - 21
Date Description Inspector Results Comments
08/16/2024 COT - RSPL - Rough Soil Passed Underground plumbing is complete and connected to city sewer system, entire system is under a water test with no leaks. Okay to shade pipes and backfill trenches.
08/16/2024 COT - RSPL - Sewer Passed Underground plumbing is complete and connected to city sewer system, entire system is under a water test with no leaks. Okay to shade pipes and backfill trenches.
08/16/2024 COT - RSPL - Yard Water Line Passed Main water supply line is connected to city water supply with a water meter attached. Supply line is under street pressure with no leaks. Okay to shade pipe and backfill trench.
08/26/2024 COT - RSBU - Excavation/Rebar/Zoning Passed
08/26/2024 COT - RSBU - Preslab Passed
08/26/2024 COT - RSEL - Electrical Underground Passed
09/11/2024 COT - RSBU - Exterior/Interior Clips/Sheathing/Framing Passed
09/11/2024 COT - RSBU - Roof Nailing Passed
10/14/2024 COT - RSPL - Gas Pressure Test Passed
10/21/2024 BULD - Electrical Clearance Passed
11/27/2024 COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. Passed 11/27/24: All items from 11/18/24 inspection have been repaired and are complete. Okay to proceed with insulation and drywall work.
12/16/2024 COT - RSBU - Interior Shear Bracing Passed 12’16/24 pass
01/31/2025 COT - BULD - SWG Clearance Passed 1-31-25, approved-okay for Southwest gas to install meter. Clearance sent.
02/19/2025 RSBU - Building Progress Passed Construction is completed. Mechanical, electrical, and plumbing fixtures are installed and fully functional. Fire alarms are installed and operational. GFCI & AFCI breakers are installed in panel and where required by code for kitchen, bathroom, laundry room, and exterior outlets. Okay to issue Certificate of Occupancy.
02/19/2025 COT - RSEL - Electrical Final Passed Construction is completed. Mechanical, electrical, and plumbing fixtures are installed and fully functional. Fire alarms are installed and operational. GFCI & AFCI breakers are installed in panel and where required by code for kitchen, bathroom, laundry room, and exterior outlets. Okay to issue Certificate of Occupancy.
02/19/2025 COT - RSEL - Grounding/Bonding Passed Ground wire is properly secured to bus bar, Ufer ground, and gas pipes. Water lines are Non-metallic water lines, grounding not required.
02/19/2025 COT - RSEL - Outdoor Lighting Passed Construction is completed. Mechanical, electrical, and plumbing fixtures are installed and fully functional. Fire alarms are installed and operational. GFCI & AFCI breakers are installed in panel and where required by code for kitchen, bathroom, laundry room, and exterior outlets. Okay to issue Certificate of Occupancy.
02/19/2025 COT - RSME - Mechanical Final Passed Construction is completed. Mechanical, electrical, and plumbing fixtures are installed and fully functional. Fire alarms are installed and operational. GFCI & AFCI breakers are installed in panel and where required by code for kitchen, bathroom, laundry room, and exterior outlets. Okay to issue Certificate of Occupancy.
02/19/2025 COT - RSPL - Plumbing Final Passed Construction is completed. Mechanical, electrical, and plumbing fixtures are installed and fully functional. Fire alarms are installed and operational. GFCI & AFCI breakers are installed in panel and where required by code for kitchen, bathroom, laundry room, and exterior outlets. Okay to issue Certificate of Occupancy.
02/19/2025 RSBU - Building Final Passed Construction is completed. Mechanical, electrical, and plumbing fixtures are installed and fully functional. Fire alarms are installed and operational. GFCI & AFCI breakers are installed in panel and where required by code for kitchen, bathroom, laundry room, and exterior outlets. Okay to issue Certificate of Occupancy.
02/19/2025 ENGR Engineering Final Passed

Documents

File Name Document Type  
COFO_FINALCOFO_RESIDENTIAL.PDF DOCUMENTS VIEW
149804 PT LOT 48 COMPLETE-2024-10-03_V1.PDF DOCUMENTS VIEW
COFT - PDSD - PERMIT CARD.PDF DOCUMENTS VIEW
LOT 48 APPLICATION_V1.PDF DOCUMENTS VIEW
LOT 48 PLOT PLAN_V1.PDF DOCUMENTS VIEW
LOT 48 SPECIAL INSPECTION CERTIFICATE-2024-04-10_V1.PDF DOCUMENTS VIEW