Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Permit: TC-MDP-0124-00043
Permit Details
Status:
Complete
Type:
Model Building Permit
Address:
10381 E SILVER FOX DR
Address NEW:
10381 E SILVER FOX DR
Apply Date:
04/10/2024
Applicant:
Dana Petty
Description:
SFR MER1402370 T21-M0077 REV1 roof covering change
Permit Reviews
Permit Number - TC-MDP-0124-00043
Permit Status: Complete
Permit Description: SFR MER1402370 T21-M0077 REV1 roof covering change
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 10/03/2024 | BUILDING DEFERRED SUBMITTAL REVIEW v.1 | 10/03/2024 | APPROVED |
| 04/12/2024 | SITE FROM MODEL PERMIT - PRODUCTION v.1 | 04/18/2024 | APPROVED |
Conditions
Permit Number - TC-MDP-0124-00043
Permit Status: Complete
Permit Description: SFR MER1402370 T21-M0077 REV1 roof covering change
| Date | Description | Comments |
|---|---|---|
| 04/15/2024 | SPECIAL INSPECTION FOR CONCRETE INSTALLATION IS REQUIRED. | |
| 04/15/2024 | SPECIAL INSPECTION FOR EPOXY ANCHORS IS REQUIRED. | |
| 04/15/2024 | SPECIAL INSPECTION FOR POST TENSION SLAB IS REQUIRED. | |
| 04/15/2024 | Post-Tension Inspection Report is required. | |
| 01/09/2024 | Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. Contact sewer@pima.gov for review and assessment. | |
| 01/09/2024 | Sewer condition must be accepted and released by Pima County prior to issuance of a Temporary Certificate of Occupancy. | |
| 04/15/2024 | Truss/Joist Design plans must be submitted and approved prior to intermediate inspections if residential building or finaling the permit if commercial building. |
Outstanding Inspections
Permit Status: Complete
Permit Number: TC-MDP-0124-00043
Permite Description: SFR MER1402370 T21-M0077 REV1 roof covering change
Total Outstanding Inspections - 4
| Last Inspection Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 10/07/2024 | COT - RSPL - Gas Pressure Test | N/A | Re-inspection required | 10/7/24: multiple issues in house rips in vapor barrier, DWV not under test. Shower pans and tub not under test. Gas not under test. Stopped inspection. |
| 10/07/2024 | BULD - Electrical Clearance | N/A | Re-inspection required | 10/7/24: branch circuits tied together. Re-inspection required |
| 10/07/2024 | COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. | N/A | Re-inspection required | 10/7/24: multiple issues in house rips in vapor barrier, DWV not under test. Shower pans and tub not under test. Gas not under test. Stopped inspection. |
| 10/07/2024 | RSBU - Building Progress | N/A | Re-inspection required | 10/7/24: multiple issues in house rips in vapor barrier, DWV not under test. Shower pans and tub not under test. Gas not under test. Stopped inspection. |
Completed Inspections
Permit Status: Complete
Permit Number: TC-MDP-0124-00043
Permit Description: SFR MER1402370 T21-M0077 REV1 roof covering change
Total Completed Inspections - 21
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 08/16/2024 | COT - RSPL - Rough Soil | Passed | Underground plumbing is complete and connected to city sewer system, entire system is under a water test with no leaks. Okay to shade pipes and backfill trenches. | |
| 08/16/2024 | COT - RSPL - Sewer | Passed | Underground plumbing is complete and connected to city sewer system, entire system is under a water test with no leaks. Okay to shade pipes and backfill trenches. | |
| 08/16/2024 | COT - RSPL - Yard Water Line | Passed | Main water supply line is connected to city water supply with a water meter attached. Supply line is under street pressure with no leaks. Okay to shade pipe and backfill trench. | |
| 08/26/2024 | COT - RSBU - Excavation/Rebar/Zoning | Passed | ||
| 08/26/2024 | COT - RSBU - Preslab | Passed | ||
| 08/26/2024 | COT - RSEL - Electrical Underground | Passed | ||
| 09/11/2024 | COT - RSBU - Exterior/Interior Clips/Sheathing/Framing | Passed | ||
| 09/11/2024 | COT - RSBU - Roof Nailing | Passed | ||
| 10/14/2024 | COT - RSPL - Gas Pressure Test | Passed | ||
| 10/21/2024 | BULD - Electrical Clearance | Passed | ||
| 11/27/2024 | COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. | Passed | 11/27/24: All items from 11/18/24 inspection have been repaired and are complete. Okay to proceed with insulation and drywall work. | |
| 12/16/2024 | COT - RSBU - Interior Shear Bracing | Passed | 12’16/24 pass | |
| 01/31/2025 | COT - BULD - SWG Clearance | Passed | 1-31-25, approved-okay for Southwest gas to install meter. Clearance sent. | |
| 02/19/2025 | RSBU - Building Progress | Passed | Construction is completed. Mechanical, electrical, and plumbing fixtures are installed and fully functional. Fire alarms are installed and operational. GFCI & AFCI breakers are installed in panel and where required by code for kitchen, bathroom, laundry room, and exterior outlets. Okay to issue Certificate of Occupancy. | |
| 02/19/2025 | COT - RSEL - Electrical Final | Passed | Construction is completed. Mechanical, electrical, and plumbing fixtures are installed and fully functional. Fire alarms are installed and operational. GFCI & AFCI breakers are installed in panel and where required by code for kitchen, bathroom, laundry room, and exterior outlets. Okay to issue Certificate of Occupancy. | |
| 02/19/2025 | COT - RSEL - Grounding/Bonding | Passed | Ground wire is properly secured to bus bar, Ufer ground, and gas pipes. Water lines are Non-metallic water lines, grounding not required. | |
| 02/19/2025 | COT - RSEL - Outdoor Lighting | Passed | Construction is completed. Mechanical, electrical, and plumbing fixtures are installed and fully functional. Fire alarms are installed and operational. GFCI & AFCI breakers are installed in panel and where required by code for kitchen, bathroom, laundry room, and exterior outlets. Okay to issue Certificate of Occupancy. | |
| 02/19/2025 | COT - RSME - Mechanical Final | Passed | Construction is completed. Mechanical, electrical, and plumbing fixtures are installed and fully functional. Fire alarms are installed and operational. GFCI & AFCI breakers are installed in panel and where required by code for kitchen, bathroom, laundry room, and exterior outlets. Okay to issue Certificate of Occupancy. | |
| 02/19/2025 | COT - RSPL - Plumbing Final | Passed | Construction is completed. Mechanical, electrical, and plumbing fixtures are installed and fully functional. Fire alarms are installed and operational. GFCI & AFCI breakers are installed in panel and where required by code for kitchen, bathroom, laundry room, and exterior outlets. Okay to issue Certificate of Occupancy. | |
| 02/19/2025 | RSBU - Building Final | Passed | Construction is completed. Mechanical, electrical, and plumbing fixtures are installed and fully functional. Fire alarms are installed and operational. GFCI & AFCI breakers are installed in panel and where required by code for kitchen, bathroom, laundry room, and exterior outlets. Okay to issue Certificate of Occupancy. | |
| 02/19/2025 | ENGR Engineering Final | Passed |