Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Inspection History Details
Inspection Status: Re-inspection required
Inspection History: COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in.
Permit Number - TC-MDP-0124-00043
Inspection Description - COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in.
Inspection Status - Re-inspection required
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
10/07/2024 | COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. | Re-inspection required | 10/7/24: multiple issues in house rips in vapor barrier, DWV not under test. Shower pans and tub not under test. Gas not under test. Stopped inspection. | |
10/09/2024 | COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. | Canceled | 10/9/24: canceled by contractor | |
10/14/2024 | COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. | Re-inspection required | 10/14/24: lath incomplete back of house. rips and penetrations in vapor barrier need to be sealed. shower pan in master not under test. main panel electrical circuits not to plan. | |
10/21/2024 | COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. | Failed | ||
11/18/2024 | COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. | Re-inspection required | 11-18-24, lower thermostat height to 54 inches maximum, fix tear to vapor barrier in dining room( marked), add fire foam to marked area in kitchen area, exterior light on back patio not grounded, coach light at garage metal box overfilled. Box is rated for 6 cubic inches and there are 2 14/2 awg wires, verify correct number of circuits. Counted 20 lines and plans call for 26. |