Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Permit: TC-MDP-0124-00007
Permit Details
Apply Date:
03/07/2024
Applicant:
Craig Morczynski
Description:
SFR LENNLE4005 T22-M0049
Permit Reviews
Permit Number - TC-MDP-0124-00007
Permit Status: Issued
Permit Description: SFR LENNLE4005 T22-M0049
Start Date | Submittal | Complete Date | Status |
---|---|---|---|
03/08/2024 | SITE FROM MODEL PERMIT - PRODUCTION v.1 | 03/20/2024 | APPROVED |
Outstanding Activity Conditions
Permit Number - TC-MDP-0124-00007
Permit Status: Issued
Permit Description: SFR LENNLE4005 T22-M0049
Total Outstanding Activity Conditions - 6
Date | Name |
---|---|
03/20/2024 | SPECIAL INSPECTION FOR POST TENSION SLAB IS REQUIRED. |
03/20/2024 | Post-Installed Anchor Inspection Report is required. |
03/20/2024 | Post-Tension Inspection Report is required. |
03/20/2024 | Sewer condition must be accepted and released by Pima County prior to issuance of a Temporary Certificate of Occupancy. |
03/20/2024 | SPECIAL INSPECTION FOR SPECIAL GRADING, EXCAVATION AND FILLING IS REQUIRED. |
07/14/2023 | Sewer condition must be accepted and released by Pima County prior to issuance of a Temporary Certificate of Occupancy. |
Conditions
Permit Number - TC-MDP-0124-00007
Permit Status: Issued
Permit Description: SFR LENNLE4005 T22-M0049
Date | Description | Comments |
---|---|---|
01/03/2024 | Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. Contact sewer@pima.gov for review and assessment. | |
07/14/2023 | Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. Contact sewer@pima.gov for review and assessment. | |
03/20/2024 | Truss/Joist Design plans must be submitted and approved prior to intermediate inspections if residential building or finaling the permit if commercial building. |
Outstanding Inspections
Permit Status: Issued
Permit Number: TC-MDP-0124-00007
Permite Description: SFR LENNLE4005 T22-M0049
Total Outstanding Inspections - 1
Last Inspection Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
10/22/2024 | COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. | N/A | Canceled | Leak at ABS line in powder room ceiling. Leak at second floor tub. Remove all electrical wires from gusset plates. Multiple tears in duct work. Refrigerator calls to be on a dedicated circuit. Red lines electrical plans but haven't submitted to city for revision. Stopped inspection. Other items may occur. 10/16/2024 10/22/24: canceled Craig |
Completed Inspections
Permit Status: Issued
Permit Number: TC-MDP-0124-00007
Permit Description: SFR LENNLE4005 T22-M0049
Total Completed Inspections - 13
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
05/09/2024 | COT - RSPL - Sewer | Passed | ||
05/09/2024 | COT - RSPL - Yard Water Line | Passed | ||
05/16/2024 | COT - RSBU - Excavation/Rebar/Zoning | Passed | ||
05/16/2024 | COT - RSBU - Preslab | Passed | ||
05/16/2024 | COT - RSEL - Electrical Underground | Passed | ||
08/08/2024 | COT - RSBU - Exterior Clips/Sheathing | Passed | Corrections were made. 8/8/2024 | |
08/08/2024 | COT - RSBU - Roof Nailing | Passed | Corrections were made. 8/8/2024 | |
09/13/2024 | BULD - Electrical Clearance | Passed | Clearance for TEP ECO 9\13\24 | |
10/16/2024 | COT - RSPL - Gas Pressure Test | Passed | ||
10/16/2024 | RSBU - Building Progress | Passed | ||
10/16/2024 | COT - RSPL - Rough Soil | Passed | Approved per Ricky Ordóñez. 10/16/2024 | |
10/23/2024 | COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. | Passed | 10-23-24, verified that all items from inspection dated,10-16-24 were corrected. Intermediates inspection approved. Okay to proceed with construction | |
11/05/2024 | COT - RSBU - Interior Shear Bracing | Passed | 11-5-24, interior shear bracing inspection verified as per approved plans. Okay to tape & texture. |