Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Inspection History Details
Inspection Status: Re-inspection required
Inspection History: COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in.
Permit Number - TC-MDP-0124-00007
Inspection Description - COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in.
Inspection Status - Re-inspection required
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
10/16/2024 | COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. | Re-inspection required | Leak at ABS line in powder room ceiling. Leak at second floor tub. Remove all electrical wires from gusset plates. Multiple tears in duct work. Refrigerator calls to be on a dedicated circuit. Red lines electrical plans but haven't submitted to city for revision. Stopped inspection. Other items may occur. 10/16/2024 | |
10/22/2024 | COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. | Canceled | Leak at ABS line in powder room ceiling. Leak at second floor tub. Remove all electrical wires from gusset plates. Multiple tears in duct work. Refrigerator calls to be on a dedicated circuit. Red lines electrical plans but haven't submitted to city for revision. Stopped inspection. Other items may occur. 10/16/2024 10/22/24: canceled Craig |
|
10/23/2024 | COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. | Passed | 10-23-24, verified that all items from inspection dated,10-16-24 were corrected. Intermediates inspection approved. Okay to proceed with construction |