Permit: TC-MDP-0124-00001
Permit Details
Apply Date:
01/02/2024
Applicant:
Daria Hopkins
Description:
SFR MERI213021 T21-M0065
Permit Reviews
Permit Number - TC-MDP-0124-00001
Permit Status: Issued
Permit Description: SFR MERI213021 T21-M0065
Start Date | Submittal | Complete Date | Status |
---|---|---|---|
10/14/2024 | BUILDING DEFERRED SUBMITTAL REVIEW v.1 | 10/15/2024 | APPROVED |
03/05/2024 | SITE FROM MODEL PERMIT - PRODUCTION v.1 | 03/15/2024 | APPROVED |
Conditions
Permit Number - TC-MDP-0124-00001
Permit Status: Issued
Permit Description: SFR MERI213021 T21-M0065
Date | Description | Comments |
---|---|---|
03/15/2024 | SPECIAL INSPECTION FOR CONCRETE INSTALLATION IS REQUIRED. | |
03/15/2024 | SPECIAL INSPECTION FOR EPOXY ANCHORS IS REQUIRED. | |
03/15/2024 | SPECIAL INSPECTION FOR POST TENSION SLAB IS REQUIRED. | |
03/15/2024 | Post-Installed Anchor Inspection Report is required. | |
03/15/2024 | Post-Tension Inspection Report is required. | |
01/02/2024 | Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. Contact sewer@pima.gov for review and assessment. | |
03/05/2024 | Sewer condition must be accepted and released by Pima County prior to issuance of a Temporary Certificate of Occupancy. | |
03/15/2024 | SPECIAL INSPECTION FOR SPECIAL GRADING, EXCAVATION AND FILLING IS REQUIRED. | |
03/15/2024 | Truss/Joist Design plans must be submitted and approved prior to intermediate inspections if residential building or finaling the permit if commercial building. |
Completed Inspections
Permit Status: Issued
Permit Number: TC-MDP-0124-00001
Permit Description: SFR MERI213021 T21-M0065
Total Completed Inspections - 13
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
08/02/2024 | COT - RSPL - Sewer | Passed | Okay to backfill. Shading required. 8/2/2024 | |
08/02/2024 | COT - RSPL - Rough Soil | Passed | Okay to backfill. Shading required. 8/2/2024 | |
08/02/2024 | COT - RSPL - Yard Water Line | Passed | Okay to backfill. Shading required. 8/2/2024 | |
08/09/2024 | COT - RSBU - Excavation/Rebar/Zoning | Passed | ||
08/09/2024 | COT - RSBU - Preslab | Passed | ||
08/09/2024 | COT - RSEL - Electrical Underground | Passed | ||
08/09/2024 | COT - RSEL - Grounding/Bonding | Passed | ||
09/06/2024 | COT - RSBU - Exterior Clips/Sheathing | Passed | Corrections were made. 9/6/2024 | |
09/06/2024 | COT - RSBU - Roof Nailing | Passed | Corrections were made. 9/6/2024 | |
09/24/2024 | COT - RSPL - Gas Pressure Test | Passed | ||
09/24/2024 | BULD - Electrical Clearance | Passed | Clearance for TEP ECO. 9/24/2024 | |
09/26/2024 | COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. | Passed | Corrections were made. 9/26/2024 | |
10/11/2024 | COT - RSBU - Interior Shear Bracing | Passed | 10/11/24 pass |